Dome Project
25605 Westside Hwy, Fellows, CA 93224Plant Summary Information
Dome Project is ranked #95 out of 346 natural gas power plants in California in terms of total annual net electricity generation.
Dome Project is comprised of 2 generators and generated 14.6 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Dome Project |
---|---|
Utility Name | Sentinel Peak Resources California, LLC |
Location | Kern County, CA |
Initial Operation Date | August 1988 |
Last Update | Dec 2023 |
Annual Generation | 48.7 GWh |
Annual Consumption | 1.2 M MMBtu |
Ranked #3,880 out of 11,835 Power Plants Nationwide | |
Ranked #1,091 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #468 out of 1,569 California Power Plants | |
Ranked #95 out of 346 California Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
Freeport McMoRan Oil & Gas (2013 to 2015) Sentinel Peak Resources California, LLC (2016 to 2023) |
Map of Dome Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Dome Project.
Monthly Net Generation for Dome Project
Dome Project Details
Summary Information | |
---|---|
Plant Name | Dome Project (54449) |
Plant Address | 25605 Westside Hwy, Fellows, CA 93224 |
Utility | Sentinel Peak Resources California, LLC (60637) |
Latitude, Longitude | 35.22083, -119.58306 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | August 1988 |
Annual Generation | 48.7 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 88-305-000 |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 88-305-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Oil and Gas Extraction (211) |
Sector | Industrial CHP (7) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 24.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | KERN RIVER GAS TRANSMISSION CO |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator T1 Details Operating August 1988
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | SO#1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | SO#1 |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.7 MW |
Minimum Load | 2.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1988 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator T2 Details Operating August 1988
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | SO#1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | SO#1 |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.7 MW |
Minimum Load | 2.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1988 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Dome Project Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1081 | Bridgeport Gas Processing Plant | Bridgeport, TX | 49.6 GWh |
#1082 | AOC, Capitol Power Plant | Washington, DC | 49.4 GWh |
#1083 | Amalgamated Sugar LLC Nampa | Nampa, ID | 49.3 GWh |
#1084 | Yuba City Energy Center | Yuba City, CA | 49.3 GWh |
#1085 | Fortistar North Tonawanda | North Tonawanda, NY | 49.3 GWh |
#1086 | Cambridge CT Hybrid | Cambridge, MN | 49.4 GWh |
#1087 | Genesis Alkali | Green River, WY | 264.4 GWh |
#1088 | Georgia-Pacific Cedar Springs | Cedar Springs, GA | 573.3 GWh |
#1089 | International Paper Red River Mill | Campti, LA | 370.6 GWh |
#1090 | Weston RICE | Kronenwetter, WI | 48.9 GWh |
#1092 | Copper | El Paso, TX | 48.7 GWh |
#1093 | Port Allen (LA) | Port Allen, LA | 48.6 GWh |
#1094 | WestRock Southeast, LLC. | Dublin, GA | 193.9 GWh |
#1095 | Mars Wrigley Confectionery US, LLC | Hackettstown, NJ | 48.5 GWh |
#1096 | Canton North Carolina | Canton, NC | 281.5 GWh |
#1097 | International Paper Georgetown Mill | Georgetown, SC | 495.9 GWh |
#1098 | Westside Energy Station | Rochester, MN | 48.4 GWh |
#1099 | Port Wentworth Mill | Port Wentworth, GA | 433.2 GWh |
#1100 | Newington | Newington, NH | 52.7 GWh |
#1101 | F B Culley | Newburgh, IN | 1.9 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Dome Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Berry Cogen | Taft, CA | 15.1 GWh | 11.8 mi |
Berry Cogen Tanne Hills 18 | Maricopa, CA | 137.2 GWh | 12.1 mi |
Berry NMW Cogens | Bakersfield, CA | 71.7 GWh | 6.2 mi |
Castor Solar | Dustin Acres, CA | 917.0 MWh | 11.1 mi |
Chalk Cliff Limited | Bakersfield, CA | 19.3 GWh | 12.2 mi |
Cymric 31X Cogen | McKittrick, CA | 37.2 GWh | 10.8 mi |
Cymric 36W Cogen | McKittrick, CA | 54.4 GWh | 11.1 mi |
Cymric 6Z Cogen | McKittrick, CA | 37.1 GWh | 9.3 mi |
Eagle Creek | Taft, CA | 7.6 GWh | 10.6 mi |
Elk Hills Power LLC | Tupman, CA | 2.3 TWh | 7.6 mi |
La Paloma Generating Plant | McKittrick, CA | 2.3 TWh | 5.2 mi |
McKittrick Cogen | McKittrick, CA | 58.5 GWh | 7.9 mi |
McKittrick Limited | Bakersfield, CA | 14.4 GWh | 8.1 mi |
Midway Sunset Cogen | Fellows, CA | 244.2 GWh | 2.6 mi |
Pumpjack Solar I | McKittrick, CA | 43.8 GWh | 6.3 mi |
Rio Bravo Solar 1 LLC | McKittrick, CA | 46.5 GWh | 14.6 mi |
Rio Bravo Solar II LLC | McKittrick, CA | 48.0 GWh | 14.2 mi |
Sunrise Power LLC | Fellows, CA | 2.6 TWh | 0.8 mi |
Taft 26C Cogen | Taft, CA | 58.9 GWh | 9.8 mi |
Welport Lease Project | McKittrick, CA | 20.7 GWh | 10.2 mi |