Dodge County Solar Hybrid

J66X+Q6, Scribner, NE 68057

Plant Summary Information

Dodge County Solar Hybrid is ranked #13 out of 14 solar farms in Nebraska in terms of total annual net electricity generation.

Dodge County Solar Hybrid generated 235.0 MWh during the 3-month period between September 2023 to December 2023.

Plant NameDodge County Solar Hybrid
Utility NameBCSB, LLC
LocationDodge County, NE
Initial Operation DateJune 2021
Last Update Dec 2023
Annual Generation 1.5 GWh
Annual Consumption 5.2 k MMBtu
Ranked #10,600 out of 11,949 Power Plants Nationwide
Ranked #5,235 out of 5,739 Solar Power Plants Nationwide
Ranked #81 out of 116 Nebraska Power Plants
Ranked #13 out of 14 Nebraska Solar Power Plants
Fuel Types Solar

Map of Dodge County Solar Hybrid

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Dodge County Solar Hybrid.

Create Your Account Today

Monthly Net Generation for Dodge County Solar Hybrid

250250200200150150100100505000Jul '21Jul '2120222022Jul '22Jul '2220232023Jul '23Jul '23
Download SVG
Download PNG
Download CSV

Dodge County Solar Hybrid Details

Summary Information
Plant NameDodge County Solar Hybrid (64223)
Plant AddressJ66X+Q6, Scribner, NE 68057
UtilityBCSB, LLC (63842)
Latitude, Longitude41.612, -96.752
Generation Dates on FileJun 2021 to Dec 2023
Initial Operation DateJune 2021
Annual Generation 1.5 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number20-297-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionMRO
Balancing AuthoritySouthwest Power Pool (SWPP)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerBurt County Public Power Dist (2599) NE
Grid Voltage 12.47 kV
Energy StorageYes

Generator 1 Details Operating June 2021

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity0.7 MW
Nameplate Power Factor1
Summer Capacity0.7 MW
Winter Capacity0.7 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2021
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Time From Cold Shutdown To Full Load10M
Solar Details
Single Axis TrackingYes
Azimuth Angle180
DC Net Capacity0.9 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Generator 2 Details Operating June 2021

TechnologyBatteries
Prime MoverBattery
OwnershipSingle Owner
Nameplate Capacity0.7 MW
Nameplate Power Factor1
Summer Capacity0.7 MW
Winter Capacity0.7 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2021
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceElectricity used for energy storage
Time From Cold Shutdown To Full Load10M
Energy Storage Details
Nameplate Energy Capacity MWH3
Maximum Charge Rate0.7 MW
Maximum Discharge Rate0.7 MW
Storage TechnologyLIB
Nameplate Reactive Power Rating0.8
Storage Enclosure TypeCS
System Peak ShavingP
Voltage Or Reactive Power SupportYes
Direct Support Of Another UnitNo
Support T D AssetNo

Dodge County Solar Hybrid Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#5225Town of BranfordBranford, CT1.5 GWh
#5226BrooksideNorth Smithfield, RI1.5 GWh
#5227Carrizozo SolarCarrizozo, NM1.5 GWh
#5228Wollan Garden SolarStarbuck, MN1.5 GWh
#5229Manchester Community College NorthGreat Path, CT1.5 GWh
#5230Jordache Enterprises SolarSouth Plainfield, NJ1.5 GWh
#5231Novel Caroline Solar, LLC CSGNorth Branch, MN1.5 GWh
#5232Novel Novak Solar LLC CSGFoley, MN1.5 GWh
#5233Butler-Warner Generation PlantFayetteville, NC41.4 GWh
#5234IKEA Norfolk Rooftop PV SystemNorfolk, VA1.5 GWh
#5236Spring Mill Solar RESMitchell, IN1.5 GWh
#5237Millville City Sewer Auth WTPMillville, NJ1.5 GWh
#5238Marlboro Mushrooms Solar FieldWest Grove, PA1.5 GWh
#523924 Applegate Solar LLCRobbinsville, NJ1.5 GWh
#5240Adams SolarLebanon, CT1.5 GWh
#5241Solar Photovoltaic Project #16Redlands, CA1.5 GWh
#5242RiverheadRiverhead, NY1.5 GWh
#5243L'Oreal FranklinSomerset, NJ1.5 GWh
#5244GRE Marshan SolarHastings, MN1.5 GWh
#5245Plymouth SolarPlymouth, MA1.5 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Dodge County Solar Hybrid.

Plant NamePlant LocationAnnual GenerationDistance
Archer Daniels Midland ColumbusColumbus, NE302.1 GWh30.8 mi
Burt County Solar HybridTekamah, NE1.4 GWh32 mi
ColumbusColumbus, NE123.8 GWh31.5 mi
Creston Ridge II, LLCCreston, NE24.6 GWh33.3 mi
Creston Ridge Wind FarmCreston, NE26.1 GWh33.1 mi
Cuming County Renewables, LLCWisner, NE10.0 GWh28.8 mi
David CityDavid City, NE8.0 MWh31.2 mi
Elk City StationBennington, NE48.7 GWh30.2 mi
Fort Calhoun Community SolarFort Calhoun, NE10.0 GWh40.1 mi
Lon WrightFremont, NE521.6 GWh19.6 mi
Madison UtilitiesMadison, NE26.0 MWh39.3 mi
Monroe (NE)Monroe, NE27.0 GWh45.1 mi
PenderPender, NE46.0 MWh34.8 mi
Platteview Solar LLCAshland, NE106.0 GWh34.9 mi
Plum Creek Wind Project (NE)Winside, NE835.8 GWh44.5 mi
Scribner Diesel Generation FacilityScribner, NE34.0 MWh5.8 mi
WahooWahoo, NE58.0 MWh28.6 mi
Wayne ICWayne, NE45.0 MWh44.7 mi
West Point MunicipalWest Point, NE139.0 MWh16.2 mi
WisnerWisner, NE58.0 MWh27.3 mi