Division 2
45404 Division Street, Lancaster, CA 93535Plant Summary Information
Division 2 is ranked #735 out of 799 solar farms in California in terms of total annual net electricity generation.
Division 2 generated 198.0 MWh during the 3-month period between August 2023 to November 2023.
Plant Name | Division 2 |
---|---|
Utility Name | Tesla Inc. |
Location | Los Angeles County, CA |
Initial Operation Date | June 2014 |
Last Update | Nov 2023 |
Annual Generation | 1.2 GWh |
Annual Consumption | 4.6 k MMBtu |
Ranked #10,690 out of 11,852 Power Plants Nationwide | |
Ranked #5,317 out of 5,655 Solar Power Plants Nationwide | |
Ranked #1,478 out of 1,570 California Power Plants | |
Ranked #735 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
SolarCity Corporation (2013 to 2015) Tesla Inc. (2016 to 2023) |
Map of Division 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Division 2.
Monthly Net Generation for Division 2
Division 2 Details
Summary Information | |
---|---|
Plant Name | Division 2 (59095) |
Plant Address | 45404 Division Street, Lancaster, CA 93535 |
Utility | Tesla Inc. (57313) |
Latitude, Longitude | 34.70833, -118.13056 |
Generation Dates on File | Jun 2014 to Nov 2023 |
Initial Operation Date | June 2014 |
Annual Generation | 1.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator GEN 1 Details Operating June 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 5 |
DC Net Capacity | 1.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.1 MW |
Virtual Net Metering Agreement | No |
Division 2 Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Mound Solar Owner VII, LLC | 6800 Dumbarton Circle, Fremont, CA 94555 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5307 | Webster Solar | Webster, MA | 1.2 GWh |
#5308 | Broadridge Cogen | El Dorado Hills, CA | 19.3 GWh |
#5309 | CS Murphy Point, LLC | Murphy, NC | 1.2 GWh |
#5310 | Barneveld Solar | Barneveld, NY | 1.2 GWh |
#5311 | Shore Point Solar | Freehold, NJ | 1.2 GWh |
#5312 | Plainfield One Solar LLC | Plainfield, NJ | 1.2 GWh |
#5313 | Oltmans SCE at Champagne | Ontario, CA | 1.2 GWh |
#5314 | Lister Avenue Solar | Newark, NJ | 1.2 GWh |
#5315 | Summit Water Nexus Mt. Holly, LLC Solar | Lumberton, NJ | 1.2 GWh |
#5316 | Broadway 3 - UC Merced 1 | Merced, CA | 1.2 GWh |
#5318 | Kent County Wastewater Treatment Solar | Milford, DE | 1.2 GWh |
#5319 | Tom's River (Lowes) | Toms River, NJ | 1.2 GWh |
#5320 | IMPA Rensselaer Solar Park | Rensselaer, IN | 1.2 GWh |
#5321 | Murphy Farm Power, LLC | Culberson, NC | 1.2 GWh |
#5322 | Nebraska Valley Solar Farm | Stowe, VT | 1.2 GWh |
#5323 | USS Greenhouse Solar LLC CSG | Pine Island, MN | 1.2 GWh |
#5324 | BESSP1, LLC. | Shallowater, TX | 1.2 GWh |
#5325 | DD Hay Road Solar 23 LLC | New Castle, DE | 1.2 GWh |
#5326 | South Garden | Winstead, MN | 1.2 GWh |
#5327 | City of Rosamond (CA) | Rosamond, CA | 1.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Division 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arrache 4006 | Palmdale, CA | 2.4 GWh | 5.8 mi |
Arrache 4013 | Palmdale, CA | 1.4 GWh | 6 mi |
Arrache 8083 | Palmdale, CA | 3.2 GWh | 5.8 mi |
CSP Los Angeles | Lancaster, CA | 5.6 GWh | 5.6 mi |
Division 1 | Lancaster, CA | 2.7 GWh | 0 mi |
Division 3 | Lancaster, CA | 1.5 GWh | 0 mi |
Foundation CDCR LAC | Lancaster, CA | 4.2 GWh | 5.3 mi |
Green Beanworks D PV | Palmdale, CA | 6.3 GWh | 4.6 mi |
Kettering Solar 1 | Lancaster, CA | 1.6 GWh | 0.7 mi |
Kettering Solar 2 | Lancaster, CA | 1.7 GWh | 0.7 mi |
Lancaster Baptist Church | Lancaster, CA | 957.0 MWh | 4.2 mi |
Lancaster Solar 1 | Lancaster, CA | 1.7 GWh | 2.1 mi |
Lancaster Solar 2 | Lancaster, CA | 2.6 GWh | 2 mi |
Ma | Lancaster, CA | 4.2 GWh | 4 mi |
Morgan Lancaster 1 | Lancaster, CA | 688.0 MWh | 4.2 mi |
Rutan | Palmdale, CA | 2.6 GWh | 4.8 mi |
SEPV Sierra | Lancaster, CA | 14.5 GWh | 1.8 mi |
Solar Oasis LLC | Palmdale, CA | 51.3 GWh | 5.1 mi |
US-TOPCO (Soccer Center) | Lancaster, CA | 7.0 GWh | 4.3 mi |
Vinam | Lancaster, CA | 3.1 GWh | 4.8 mi |