Division 1
45401 Division Street, Lancaster, CA 93535Plant Summary Information
Division 1 is ranked #557 out of 799 solar farms in California in terms of total annual net electricity generation.
Division 1 generated 584.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Division 1 |
---|---|
Utility Name | Tesla Inc. |
Location | Los Angeles County, CA |
Initial Operation Date | June 2014 |
Last Update | Dec 2023 |
Annual Generation | 2.7 GWh |
Annual Consumption | 9.6 k MMBtu |
Ranked #9,242 out of 11,852 Power Plants Nationwide | |
Ranked #4,070 out of 5,655 Solar Power Plants Nationwide | |
Ranked #1,277 out of 1,570 California Power Plants | |
Ranked #557 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
SolarCity Corporation (2013 to 2015) Tesla Inc. (2016 to 2023) |
Map of Division 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Division 1.
Monthly Net Generation for Division 1
Division 1 Details
Summary Information | |
---|---|
Plant Name | Division 1 (59094) |
Plant Address | 45401 Division Street, Lancaster, CA 93535 |
Utility | Tesla Inc. (57313) |
Latitude, Longitude | 34.70833, -118.13056 |
Generation Dates on File | Jun 2014 to Dec 2023 |
Initial Operation Date | June 2014 |
Annual Generation | 2.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator GEN 1 Details Operating June 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 15 |
DC Net Capacity | 1.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.7 MW |
Virtual Net Metering Agreement | No |
Division 1 Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Mound Solar Owner VII, LLC | 6800 Dumbarton Circle, Fremont, CA 94555 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4060 | Canyon Del Oro High School Solar | Oro Valley, AZ | 2.7 GWh |
#4061 | Ramona Solar Energy | Ramona, CA | 2.7 GWh |
#4062 | Madera 1 PV | Madera, CA | 2.7 GWh |
#4063 | Matrix Buildings A&B (Perth Amboy) Solar | Perth Amboy, NJ | 2.7 GWh |
#4064 | Turner Rd Community Solar Project | Baldwin, NY | 2.7 GWh |
#4065 | SCS West Fairchild 011958 Danville, LLC | Danville, IL | 2.7 GWh |
#4066 | CCBC-Catonsville | Catonsville, MD | 2.7 GWh |
#4067 | Syncarpha Halifax Hybrid CSG | Halifax, MA | 2.7 GWh |
#4068 | Hopkinton CSG | Hopkinton, MA | 2.7 GWh |
#4069 | Phoenix Airport Rental Car Center | Phoenix, AZ | 2.7 GWh |
#4071 | Onyx - Lamphear Road CSG | Rome, NY | 2.7 GWh |
#4072 | Deer Creek 2 | Shingle Springs, CA | 2.7 GWh |
#4073 | Freeman Avenue | Andersonville, GA | 2.7 GWh |
#4074 | Westminster | Westminster, VT | 2.7 GWh |
#4075 | Kettleman Solar Project | Lodi, CA | 2.7 GWh |
#4076 | West Bridgewater AB CSG | West Bridgewater, MA | 2.7 GWh |
#4077 | Onyx - Saratoga Springs Landfill Solar CSG | Saratoga Springs, NY | 2.7 GWh |
#4078 | L-8 Solar Project | Palmdale, CA | 2.7 GWh |
#4079 | Prologis L.P | Tracy, CA | 2.7 GWh |
#4080 | Google Moffett Park Solar Project | Sunnyvale, CA | 2.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Division 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arrache 4006 | Palmdale, CA | 2.4 GWh | 5.8 mi |
Arrache 4013 | Palmdale, CA | 1.4 GWh | 6 mi |
Arrache 8083 | Palmdale, CA | 3.2 GWh | 5.8 mi |
CSP Los Angeles | Lancaster, CA | 5.6 GWh | 5.6 mi |
Division 2 | Lancaster, CA | 1.2 GWh | 0 mi |
Division 3 | Lancaster, CA | 1.5 GWh | 0 mi |
Foundation CDCR LAC | Lancaster, CA | 4.2 GWh | 5.3 mi |
Green Beanworks D PV | Palmdale, CA | 6.3 GWh | 4.6 mi |
Kettering Solar 1 | Lancaster, CA | 1.6 GWh | 0.7 mi |
Kettering Solar 2 | Lancaster, CA | 1.7 GWh | 0.7 mi |
Lancaster Baptist Church | Lancaster, CA | 957.0 MWh | 4.2 mi |
Lancaster Solar 1 | Lancaster, CA | 1.7 GWh | 2.1 mi |
Lancaster Solar 2 | Lancaster, CA | 2.6 GWh | 2 mi |
Ma | Lancaster, CA | 4.2 GWh | 4 mi |
Morgan Lancaster 1 | Lancaster, CA | 688.0 MWh | 4.2 mi |
Rutan | Palmdale, CA | 2.6 GWh | 4.8 mi |
SEPV Sierra | Lancaster, CA | 14.5 GWh | 1.8 mi |
Solar Oasis LLC | Palmdale, CA | 51.3 GWh | 5.1 mi |
US-TOPCO (Soccer Center) | Lancaster, CA | 7.0 GWh | 4.3 mi |
Vinam | Lancaster, CA | 3.1 GWh | 4.8 mi |