Diamond Valley Solar Project
33725 E. Grand Avenue, Winchester, CA 92596Plant Summary Information
Diamond Valley Solar Project is ranked #559 out of 747 solar farms in California in terms of total annual net electricity generation.
Diamond Valley Solar Project generated 664.8 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Diamond Valley Solar Project |
---|---|
Utility Name | Diamond Valley Solar LLC |
Location | Riverside County, CA |
Initial Operation Date | January 2015 |
Last Update | Dec 2022 |
Annual Generation | 2.6 GWh |
Annual Consumption | 9.4 k MMBtu |
Ranked #9,060 out of 11,249 Power Plants Nationwide | |
Ranked #3,915 out of 5,158 Solar Power Plants Nationwide | |
Ranked #1,254 out of 1,501 California Power Plants | |
Ranked #559 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Map of Diamond Valley Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Diamond Valley Solar Project.
Monthly Net Generation for Diamond Valley Solar Project
Diamond Valley Solar Project Details
Summary Information | |
---|---|
Plant Name | Diamond Valley Solar Project (59405) |
Plant Address | 33725 E. Grand Avenue Winchester, CA 92596 |
Utility | Diamond Valley Solar LLC (59176) |
Latitude, Longitude | 33.71306, -117.0725 |
Generation Dates on File | Jan 2015 to Dec 2022 |
Initial Operation Date | January 2015 |
Annual Generation | 2.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF14-18-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator PV11 Details Operating January 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.3 MW |
Summer Capacity | 1.3 MW |
Winter Capacity | 1.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 1.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Diamond Valley Solar Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3905 | DeGraff Butler Electric | Burns, KS | 2.6 GWh |
#3906 | Oswego County - Fulton Solar | Fulton, NY | 2.6 GWh |
#3907 | Berkshire 1 | Sheffield, MA | 2.6 GWh |
#3908 | Oneida - South | Whitestown, NY | 2.6 GWh |
#3909 | 71 Charlotte Furnace Rd Hybrid(CSG) | Wareham, MA | 2.6 GWh |
#3910 | Oneida - West | Whitestown, NY | 2.6 GWh |
#3911 | Christmas Tree Shops DC Burlington NJ | Florence Township, NJ | 2.6 GWh |
#3912 | Beverly | Beverly, MA | 2.6 GWh |
#3913 | Syncarpha Eagle Nest | Eagle Nest, NM | 2.6 GWh |
#3914 | OER Checkerspot | Tracy's Landing, MD | 2.6 GWh |
#3916 | IKEA Tejon 345 | Lebec, CA | 2.6 GWh |
#3917 | Frey Rd #2 Community Solar Farm | Macedon, NY | 2.6 GWh |
#3918 | Solar BESS Hybrid | Marietta, GA | 2.5 GWh |
#3919 | Lee Site 31 Solar | Lee, MA | 2.6 GWh |
#3920 | Ridgecrest | Washington, DC | 2.6 GWh |
#3921 | West Boylston Community Shared Solar | West Boylston, MA | 2.6 GWh |
#3922 | BJ's Wholesale Club Inc Dist Center | Burlington, NJ | 2.6 GWh |
#3923 | Easton Landfill | Easton, MA | 2.6 GWh |
#3924 | Orange County Solar Farm (NY) | Goshen, NY | 2.6 GWh |
#3925 | Cedar Creek | Egg Harbor City, NJ | 2.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Diamond Valley Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amazon PSP1 | Beaumont, CA | 8.4 GWh | 15.4 mi |
AP North Lake I, LP | Hemet, CA | 32.4 GWh | 4 mi |
Broadway 2 - UC Riverside | Riverside, CA | 5.5 GWh | 23.2 mi |
Crafton Hills College Solar Farm | Yucaipa, CA | 97.8 MWh | 22.9 mi |
Diamond Valley Lake | Winchester, CA | 3.2 GWh | 2.2 mi |
EMWD - Moreno Valley RWRF | Moreno Valley, CA | 5.9 GWh | 13.5 mi |
EMWD - Perris Valley RWRF | Perris, CA | 8.9 GWh | 7.4 mi |
EMWD - San Jacinto RES BCT | San Jacinto, CA | 6.7 GWh | 6.8 mi |
EMWD - San Jacinto RWRF NEM | San Jacinto, CA | 3.2 GWh | 6.7 mi |
EMWD - Sun City RWRF | Menifee, CA | 4.0 GWh | 8.5 mi |
Foundation RRM | Cabazon, CA | 8.4 GWh | 20.4 mi |
Lake Elsinore Canopies - Lakeside HS | Lake Elsinore, CA | 1.9 GWh | 18.1 mi |
Park Meridian #1 | Riverside, CA | 2.9 GWh | 17.5 mi |
RCWD PV Project | Murrieta, CA | 9.9 GWh | 14.6 mi |
Red Mountain | Fallbrook, CA | 19.2 GWh | 23 mi |
Soboba Community Solar Project | San Jacinto, CA | 4.0 GWh | 10.3 mi |
Springs Generating Station | Riverside, CA | 1.5 GWh | 19.7 mi |
SunEdison Walgreens Moreno Valley | Moreno Valley, CA | 1.1 GWh | 14 mi |
Tahquitz High School | Hemet, CA | 1.7 GWh | 4.9 mi |
West Valley High School Solar | Hemet, CA | 1.5 GWh | 3.6 mi |