DG AMP Solar Brewster
630 7th St SE, Brewster, OH 44613Plant Summary Information
DG AMP Solar Brewster is ranked #40 out of 53 solar farms in Ohio in terms of total annual net electricity generation.
DG AMP Solar Brewster generated 332.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | DG AMP Solar Brewster |
---|---|
Utility Name | DG AMP Solar, LLC |
Location | Stark County, OH |
Initial Operation Date | December 2018 |
Last Update | Dec 2023 |
Annual Generation | 2.2 GWh |
Annual Consumption | 7.8 k MMBtu |
Ranked #9,639 out of 11,852 Power Plants Nationwide | |
Ranked #4,393 out of 5,655 Solar Power Plants Nationwide | |
Ranked #119 out of 183 Ohio Power Plants | |
Ranked #40 out of 53 Ohio Solar Power Plants | |
Fuel Types | Solar |
Map of DG AMP Solar Brewster
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for DG AMP Solar Brewster.
Monthly Net Generation for DG AMP Solar Brewster
DG AMP Solar Brewster Details
Summary Information | |
---|---|
Plant Name | DG AMP Solar Brewster (61818) |
Plant Address | 630 7th St SE, Brewster, OH 44613 |
Utility | DG AMP Solar, LLC (60370) |
Latitude, Longitude | 40.7024, -81.58983 |
Generation Dates on File | Jan 2019 to Dec 2023 |
Initial Operation Date | December 2018 |
Annual Generation | 2.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Village of Brewster - (OH) (2205) OH |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator AMPBR Details Operating December 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.9 MW |
Summer Capacity | 1.9 MW |
Winter Capacity | 1.9 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 15 |
DC Net Capacity | 2.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
DG AMP Solar Brewster Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4383 | Griffin Road Solar 2 | Charlton, MA | 2.2 GWh |
#4384 | Calabro Airport North Solar Project | Shirley, NY | 2.2 GWh |
#4385 | CPG - Duke 5900 Holabird | Baltimore, MD | 2.2 GWh |
#4386 | Dartmouth II Solar | Dartmouth, MA | 2.2 GWh |
#4387 | Tom Sifers Solar | Fraser, CO | 2.2 GWh |
#4388 | Strawberry Point DPC Solar | Strawberry Point, IA | 2.2 GWh |
#4389 | Buffalo Lake CSG1, LLC | Buffalo Lake, MN | 2.2 GWh |
#4390 | Kearsarge Johnstown 1 CSG | Johnstown, NY | 2.2 GWh |
#4391 | USS All In Solar LLC CSG | Hartland, MN | 2.2 GWh |
#4392 | USS Lake Patterson Solar CSG | Cologne, MN | 2.2 GWh |
#4394 | Building F | Santa Fe Springs, CA | 2.2 GWh |
#4395 | Easton Landfill | Easton, MA | 2.2 GWh |
#4396 | Mount Olive Solar | Mount Olive, NC | 2.2 GWh |
#4397 | Onondaga County - Oak Orchard WWTP | Clay, NY | 2.2 GWh |
#4398 | Bed Bath & Beyond DC Port Reading NJ | Port Reading, NJ | 2.2 GWh |
#4399 | Quincy II Solar Garden | Aurora, CO | 2.2 GWh |
#4400 | SR Jackson II | Jackson, TN | 2.2 GWh |
#4401 | Farmers Electric Cooperative | Newport, AR | 2.2 GWh |
#4402 | Ventura | Dartmouth, MA | 2.2 GWh |
#4403 | Goldfinch | Lakeland, FL | 2.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding DG AMP Solar Brewster.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Akron WRF | Akron, OH | 7.9 GWh | 31.2 mi |
Carroll County Energy | Carrollton, OH | 5.3 TWh | 28.6 mi |
Cuyahoga Falls 1 | Cuyahoga Falls, OH | 707.0 MWh | 30.9 mi |
DG AMP 1048 Wadsworth | Wadsworth, OH | 11.2 GWh | 23.3 mi |
DG AMP Rittman Rd | Wadsworth, OH | 3.6 GWh | 22.3 mi |
DG AMP Solar Orrville 3 | Orrville, OH | 3.3 GWh | 13.9 mi |
Dover | Dover, OH | 78.0 GWh | 14.1 mi |
Dover Peaking | Dover, OH | 134.0 MWh | 12.1 mi |
Dresden Energy Facility | Dresden, OH | 4.5 TWh | 48 mi |
IGS AKC1 | Akron, OH | 2.3 GWh | 24 mi |
Morton Salt Rittman | Rittman, OH | 13.9 GWh | 20.8 mi |
Orrville | Orrville, OH | 20.8 GWh | 13.8 mi |
Orrville Peaking | Orrville, OH | 103.0 MWh | 14 mi |
Progress Drive Generation Station | Shelby, OH | 38.0 MWh | 44.1 mi |
Seville | Seville, OH | 153.0 MWh | 27.1 mi |
South Field Energy | Wellsville, OH | 8.6 TWh | 48 mi |
Summit Street Power Plant | Kent, OH | 31.3 GWh | 33.1 mi |
Wadsworth HBS RTO BTM | Wadsworth, OH | 383.0 MWh | 24.5 mi |
Wadsworth IPS RTO BTM | Wadsworth, OH | 373.0 MWh | 27.5 mi |
Wellington | Wellington, OH | 32.0 MWh | 46 mi |