Devil Canyon
6900 Devil Canyon Rd., San Bernardino, CA 92407Plant Summary Information
Devil Canyon is ranked #40 out of 1,371 hydroelectric power plants nationwide in terms of total annual net electricity generation.
Devil Canyon is comprised of 4 generators and generated 303.3 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Devil Canyon |
---|---|
Utility Name | California Dept. of Water Resources |
Location | San Bernardino County, CA |
Initial Operation Date | December 1972 |
Last Update | Aug 2024 |
Annual Generation | 925.8 GWh |
Annual Consumption | 3.6 M MMBtu |
Ranked #783 out of 11,835 Power Plants Nationwide | |
Ranked #40 out of 1,371 Water Power Plants Nationwide | |
Ranked #38 out of 1,569 California Power Plants | |
Ranked #4 out of 222 California Water Power Plants | |
Fuel Types | Water |
Previous Operator |
California Dept. of Water Resources (2013 to 2015) California Dept. of Water Resources (2016 to 2023) |
Map of Devil Canyon
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Devil Canyon.
Monthly Net Generation for Devil Canyon
Devil Canyon Details
Summary Information | |
---|---|
Plant Name | Devil Canyon (436) |
Plant Address | 6900 Devil Canyon Rd., San Bernardino, CA 92407 |
Utility | California Dept. of Water Resources (3255) |
Latitude, Longitude | 34.2056, -117.3344 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | December 1972 |
Annual Generation | 925.8 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Water From Penstocks Ca Aquedu |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 1972
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 59.8 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 57 MW |
Winter Capacity | 57 MW |
Minimum Load | 15 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1972 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 2 Details Operating July 1976
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 59.8 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 57 MW |
Winter Capacity | 57 MW |
Minimum Load | 15 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1976 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 4 Details Operating July 1992
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 78.3 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 74 MW |
Winter Capacity | 74 MW |
Minimum Load | 15 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1992 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 3 Details Operating July 1994
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 78.3 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 74 MW |
Winter Capacity | 74 MW |
Minimum Load | 15 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1994 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Devil Canyon Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#30 | Hoover Dam (NV) | Boulder City, NV | 1.4 TWh |
#31 | Lower Monumental | Kahlotus, WA | 1.3 TWh |
#32 | Lower Granite | Pomeroy, WA | 1.3 TWh |
#33 | Noxon Rapids | Noxon, MT | 1.3 TWh |
#34 | Colgate | Dobbins, CA | 1.3 TWh |
#35 | Kentucky Dam | Grand Rivers, KY | 1.2 TWh |
#36 | Pickwick Landing Dam | Pickwick Dam, TN | 1.1 TWh |
#37 | Wheeler Dam | Town Creek, AL | 1.1 TWh |
#38 | Safe Harbor | Conestoga, PA | 989.2 GWh |
#39 | Holtwood | Holtwood, PA | 949.8 GWh |
#41 | Davis Dam | Kingman, AZ | 908.9 GWh |
#42 | Oxbow (OR) | Oxbow, OR | 900.1 GWh |
#43 | Yellowtail | Hardin, MT | 846.0 GWh |
#44 | Mossyrock | Silver Creek, WA | 844.5 GWh |
#45 | Keokuk | Keokuk, IA | 834.9 GWh |
#46 | Cabinet Gorge | Clark Fork, ID | 815.7 GWh |
#47 | Fontana Dam | Fontana Dam, NC | 813.6 GWh |
#48 | Watts Bar Hydro | Spring City, TN | 812.4 GWh |
#49 | Selis Ksanka Qlispe | Polson, MT | 804.8 GWh |
#50 | Big Creek 3 | Auberry, CA | 783.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Devil Canyon.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amazon San Bernardino | San Bernardino, CA | 6.0 GWh | 9.6 mi |
Cal State Univ San Bernardino FC01 | San Bernardino, CA | 7.5 GWh | 1.5 mi |
Chambers 4 - Rialto LGB8 | Rialto, CA | 3.5 GWh | 6.7 mi |
Colton Solar One, LLC | San Bernardino, CA | 2.3 GWh | 7.8 mi |
Drews Generating Facility | Colton, CA | 606.0 MWh | 10.1 mi |
Fontana | Rialto, CA | 6.2 GWh | 5 mi |
IGS KSBD | Highland, CA | 9.0 GWh | 9 mi |
IGS SBD2 | San Bernardino, CA | 4.2 GWh | 9.6 mi |
Kohls San Bernardino Solar Facility | San Bernardino, CA | 1.0 GWh | 8.6 mi |
Mojave Siphon | Hesperia, CA | 69.6 GWh | 7.1 mi |
Mountainview Generating Station | Redlands, CA | 2.6 TWh | 10.1 mi |
Niagara Bottling - Rialto | Rialto, CA | 7.9 GWh | 7.3 mi |
OES Biogas Power | San Bernardino, CA | 348.0 MWh | 2.3 mi |
RPUWD Scheuer Well Solar Project | San Bernardino, CA | 4.8 GWh | 7.4 mi |
San Manuel Central Plant Cogens | Highland, CA | 26.5 GWh | 7 mi |
SB Water Reclamation Fuel Cell | San Bernardino, CA | 9.5 GWh | 9.4 mi |
Solar Photovoltaic Project #03 | Rialto, CA | 452.8 MWh | 8.6 mi |
Solar Photovoltaic Project #26 | Rialto, CA | 4.6 GWh | 7.3 mi |
Solar Photovoltaic Project #27 | Rialto, CA | 845.1 MWh | 7.2 mi |
Solar Photovoltaic Project #28 | San Bernardino, CA | 1.9 GWh | 8.4 mi |