Desert Quartzite
18th Avenue and Mesa Dr, Blythe, CA 92225Plant Summary Information
Desert Quartzite is ranked #101 out of 807 solar farms in California in terms of total annual net electricity generation.
Desert Quartzite generated 126.2 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Desert Quartzite |
---|---|
Utility Name | Desert Quartzite LLC |
Location | Riverside County, CA |
Initial Operation Date | Not Available |
Last Update | Jan 2025 |
Annual Generation | 126.2 GWh |
Annual Consumption | 440.6 k MMBtu |
Ranked #2,952 out of 11,979 Power Plants Nationwide | |
Ranked #540 out of 5,765 Solar Power Plants Nationwide | |
Ranked #328 out of 1,578 California Power Plants | |
Ranked #101 out of 807 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
First Solar Project Development (2014 to 2019) Desert Quartzite LLC (2020 to 2023) |
Map of Desert Quartzite
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Desert Quartzite.
Monthly Net Generation for Desert Quartzite
Desert Quartzite Details
Summary Information | |
---|---|
Plant Name | Desert Quartzite (59871) |
Plant Address | 18th Avenue and Mesa Dr, Blythe, CA 92225 |
Utility | Desert Quartzite LLC (59656) |
Latitude, Longitude | 33.565, -114.753 |
Generation Dates on File | Dec 2024 to Jan 2025 |
Initial Operation Date | Not Available |
Annual Generation | 126.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 230.00 kV |
Energy Storage | Yes |
Desert Quartzite Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#530 | NC 102 Project LLC | Midland, NC | 131.1 GWh |
#531 | Miami Dade Solar Energy Center | Miami, FL | 131.0 GWh |
#532 | Maiden Creek Solar Power Plant | Maiden, NC | 130.6 GWh |
#533 | Appaloosa Solar I | Cedar City, UT | 130.1 GWh |
#534 | Granite Mountain Solar West, LLC | Cedar City, UT | 129.8 GWh |
#535 | SR DeSoto III | DeSoto, GA | 129.6 GWh |
#536 | Nassau Solar Center | Callahan, FL | 129.5 GWh |
#537 | Wild Quail | Defuniak Springs, FL | 129.5 GWh |
#538 | Lithia Solar | Lithia, FL | 129.1 GWh |
#539 | Crystal Hill Solar | Crystal Hill, VA | 129.1 GWh |
#541 | Hecate Energy Beacon Solar 1 | Cantil, CA | 128.9 GWh |
#542 | Anhinga Solar Energy Center | Green Cove Springs, FL | 128.8 GWh |
#543 | Pecan Tree | Defuniak Springs, FL | 128.8 GWh |
#544 | CPV Stagecoach Solar | Andersonville, GA | 128.0 GWh |
#545 | Luciana | Richgrove, CA | 127.9 GWh |
#546 | FPL Cavendish Solar Energy Center | Okeechobee, FL | 127.7 GWh |
#547 | Mesquite Solar 5, LLC | Tonopah, AZ | 117.4 GWh |
#548 | Solar Star Oregon II | Prineville, OR | 127.6 GWh |
#549 | Shoe Creek Solar, LLC | Laurinburg, NC | 127.5 GWh |
#550 | Colgreen North Shore Solar Farm | Mecca, CA | 127.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Desert Quartzite.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arlington Energy Center II | Blythe, CA | 641.4 GWh | 8.8 mi |
Arlington Energy Center III | Blythe, CA | 279.6 GWh | 8.8 mi |
Blythe Energy Inc | Blythe, CA | 645.1 GWh | 5.2 mi |
Blythe Mesa Solar II | Blythe, CA | 557.1 GWh | 6.7 mi |
Blythe Solar 110, LLC | Blythe, CA | 584.2 GWh | 8 mi |
Blythe Solar II, LLC | Blythe, CA | 337.5 GWh | 8.1 mi |
Blythe Solar III, LLC Hybrid | Blythe, CA | 352.8 GWh | 6.3 mi |
Blythe Solar IV, LLC | Blythe, CA | 292.1 GWh | 8.1 mi |
Chuckawalla Solar | Blythe, CA | 6.8 GWh | 9.5 mi |
Chuckawalla Valley State Prison | Blythe, CA | 1.2 GWh | 8.7 mi |
Genesis Solar Energy Project | Blythe, CA | 625.4 GWh | 15.7 mi |
Ironwood Solar LLC | Blythe, CA | 8.2 GWh | 9.5 mi |
McCoy Solar Energy Project Hybrid | Blythe, CA | 524.7 GWh | 9 mi |
Palo Verde College | Blythe, CA | 2.0 GWh | 8.9 mi |
Solar Blythe 2 | Blythe, CA | 40.5 GWh | 4.9 mi |
Solar Blythe LLC | Blythe, CA | 40.5 GWh | 1.9 mi |
SunEdison Ironwood State Prison | Blythe, CA | 1.3 GWh | 9.5 mi |
Venable Solar 1 | Blythe, CA | 3.4 GWh | 10.7 mi |
Venable Solar 2 | Blythe, CA | 3.4 GWh | 10.7 mi |
Victory Pass | Desert Center, CA | 513.8 GWh | 33.7 mi |