Desert Harvest, LLC
22102 Kaiser Road, Desert Center, CA 92239Plant Summary Information
Desert Harvest, LLC is ranked #83 out of 799 solar farms in California in terms of total annual net electricity generation.
Desert Harvest, LLC generated 69.2 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Desert Harvest, LLC |
---|---|
Utility Name | Desert Harvest, LLC |
Location | Riverside County, CA |
Initial Operation Date | December 2020 |
Last Update | Aug 2024 |
Annual Generation | 185.8 GWh |
Annual Consumption | 679.4 k MMBtu |
Ranked #2,393 out of 11,835 Power Plants Nationwide | |
Ranked #285 out of 5,643 Solar Power Plants Nationwide | |
Ranked #269 out of 1,569 California Power Plants | |
Ranked #83 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Desert Harvest, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Desert Harvest, LLC.
Monthly Net Generation for Desert Harvest, LLC
Desert Harvest, LLC Details
Summary Information | |
---|---|
Plant Name | Desert Harvest, LLC (62177) |
Plant Address | 22102 Kaiser Road, Desert Center, CA 92239 |
Utility | Desert Harvest, LLC (61709) |
Latitude, Longitude | 33.8, -115.38 |
Generation Dates on File | Nov 2020 to Aug 2024 |
Initial Operation Date | December 2020 |
Annual Generation | 185.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator DH001 Details Operating December 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 80 MW |
Summer Capacity | 80 MW |
Winter Capacity | 80 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 113.8 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Desert Harvest, LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#275 | Lamesa Solar | Lamesa, TX | 192.0 GWh |
#276 | Hardy Hills Solar Energy LLC | Frankfort, IN | 191.6 GWh |
#277 | Two Creeks Solar | Two Rivers, WI | 191.2 GWh |
#278 | Utah Red Hills Renewable Energy Park | Parowan, UT | 189.8 GWh |
#279 | Sun Streams 3 | Arlington, AZ | 251.1 GWh |
#280 | Graphite Solar I | Wellington, UT | 189.3 GWh |
#281 | Bell Ridge Solar | Trenton, FL | 189.3 GWh |
#282 | White Pine Solar, LLC | Butler, GA | 188.2 GWh |
#283 | Playa Solar 1, LLC | North Las Vegas, NV | 187.9 GWh |
#284 | Three Peaks Power | Cedar City, UT | 186.9 GWh |
#286 | Lockhart Solar PV II | Hinkley, CA | 185.1 GWh |
#287 | Lapetus | Andrews, TX | 184.7 GWh |
#288 | Snipesville | Denton, GA | 184.4 GWh |
#289 | Water Strider Solar | Nathalie, VA | 184.1 GWh |
#290 | Lancaster Solar GA | Arlington, GA | 183.8 GWh |
#291 | North Star Solar Project | North Branch, MN | 183.1 GWh |
#292 | Sweetwater Solar | Green River, WY | 180.2 GWh |
#293 | Bay Ranch Solar Power Plant | Panama City, FL | 180.1 GWh |
#294 | Happy Solar 1 | Searcy, AR | 180.0 GWh |
#295 | Grand View Solar Two | Grand View, ID | 178.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Desert Harvest, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arica Solar | Desert Center, CA | 387.7 GWh | 7.8 mi |
Arlington Energy Center II | Blythe, CA | 596.9 GWh | 35.6 mi |
Arlington Energy Center III | Blythe, CA | 263.6 GWh | 35.6 mi |
Athos Solar Project | Desert Center, CA | 593.4 GWh | 3.7 mi |
Chuckawalla Solar | Blythe, CA | 6.8 GWh | 31 mi |
Chuckawalla Valley State Prison | Blythe, CA | 1.2 GWh | 31.8 mi |
Desert Harvest II LLC | Desert Center, CA | 133.8 GWh | 0 mi |
Desert Sunlight 250, LLC | Desert Center, CA | 543.5 GWh | 0.9 mi |
Desert Sunlight 300, LLC | Desert Center, CA | 659.4 GWh | 1.8 mi |
Genesis Solar Energy Project | Blythe, CA | 609.1 GWh | 23.8 mi |
Ironwood Solar LLC | Blythe, CA | 8.2 GWh | 31.1 mi |
Maverick Solar 4, LLC | Desert Center, CA | 231.3 GWh | 6.9 mi |
Maverick Solar 6, LLC | Desert Center, CA | 268.2 GWh | 6.9 mi |
Maverick Solar 7, LLC | Desert Center, CA | 312.8 GWh | 6.9 mi |
Maverick Solar, LLC | Desert Center, CA | 375.5 GWh | 6.9 mi |
Oberon II Solar Project | Desert Center, CA | 549.7 GWh | 4.9 mi |
Oberon Solar Project | Desert Center, CA | 534.1 GWh | 4.9 mi |
SE Athos II, LLC | Desert Center, CA | 473.9 GWh | 3.7 mi |
SunEdison Ironwood State Prison | Blythe, CA | 1.3 GWh | 31.1 mi |
Victory Pass | Desert Center, CA | 296.2 GWh | 7.8 mi |