Denton Energy Center
8161 Jim Christal Road, Denton, TX 76207Plant Summary Information
Denton Energy Center is ranked #121 out of 304 natural gas power plants in Texas in terms of total annual net electricity generation.
Denton Energy Center is comprised of 12 generators and generated 64.2 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Denton Energy Center |
---|---|
Utility Name | City of Denton - (TX) |
Location | Denton County, TX |
Initial Operation Date | July 2018 |
Last Update | Dec 2024 |
Annual Generation | 246.7 GWh |
Annual Consumption | 2.2 M MMBtu |
Ranked #2,084 out of 11,949 Power Plants Nationwide | |
Ranked #674 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #376 out of 769 Texas Power Plants | |
Ranked #121 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Denton Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Denton Energy Center.
Monthly Net Generation for Denton Energy Center
Denton Energy Center Details
Summary Information | |
---|---|
Plant Name | Denton Energy Center (61643) |
Plant Address | 8161 Jim Christal Road, Denton, TX 76207 |
Utility | City of Denton - (TX) (5063) |
Latitude, Longitude | 33.21487, -97.20969 |
Generation Dates on File | May 2018 to Dec 2024 |
Initial Operation Date | July 2018 |
Annual Generation | 246.7 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Denton - (TX) (5063) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | ENTERPRISE TEXAS PIPELINE |
Natural Gas Storage | No |
Generator DEC1 Details Operating July 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.8 MW |
Winter Capacity | 18.8 MW |
Minimum Load | 3.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator DEC10 Details Operating July 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.8 MW |
Winter Capacity | 18.8 MW |
Minimum Load | 3.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator DEC11 Details Operating July 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.8 MW |
Winter Capacity | 18.8 MW |
Minimum Load | 3.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator DEC12 Details Operating July 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.8 MW |
Winter Capacity | 18.8 MW |
Minimum Load | 3.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator DEC2 Details Operating July 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.8 MW |
Winter Capacity | 18.8 MW |
Minimum Load | 3.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator DEC3 Details Operating July 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.8 MW |
Winter Capacity | 18.8 MW |
Minimum Load | 3.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator DEC4 Details Operating July 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.8 MW |
Winter Capacity | 18.8 MW |
Minimum Load | 3.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator DEC5 Details Operating July 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.8 MW |
Winter Capacity | 18.8 MW |
Minimum Load | 3.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator DEC6 Details Operating July 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.8 MW |
Winter Capacity | 18.8 MW |
Minimum Load | 3.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator DEC7 Details Operating July 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.8 MW |
Winter Capacity | 18.8 MW |
Minimum Load | 3.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator DEC8 Details Operating July 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.8 MW |
Winter Capacity | 18.8 MW |
Minimum Load | 3.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator DEC9 Details Operating July 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 18.8 MW |
Winter Capacity | 18.8 MW |
Minimum Load | 3.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Denton Energy Center Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#664 | Walton County Power, LLC | Monroe, GA | 258.7 GWh |
#665 | Salinas River Cogeneration | San Ardo, CA | 258.1 GWh |
#666 | Carlsbad Energy Center | Carlsbad, CA | 256.3 GWh |
#667 | AES Redondo Beach LLC | Redondo Beach, CA | 256.2 GWh |
#668 | Antelope Station | Abernathy, TX | 255.9 GWh |
#669 | Ticona Polymers Inc | Bishop, TX | 254.1 GWh |
#670 | Dearborn Energy Center | Dearborn, MI | 251.9 GWh |
#671 | Harbor | Wilmington, CA | 251.0 GWh |
#672 | Los Esteros Critical Energy Center | San Jose, CA | 249.4 GWh |
#673 | Arapahoe Combustion Turbine Project | Denver, CO | 249.4 GWh |
#675 | Flint Hills Resources Pine Bend, LLC | Rosemount, MN | 246.4 GWh |
#676 | Granite City Works | Granite City, IL | 484.7 GWh |
#677 | Frank Knutson | Commerce City, CO | 246.6 GWh |
#678 | New-Indy Ontario Mill | Ontario, CA | 245.9 GWh |
#679 | Lauderdale | Ft. Lauderdale, FL | 244.5 GWh |
#680 | Henry County | New Castle, IN | 243.9 GWh |
#681 | Chambersburg | Chambersburg, PA | 243.0 GWh |
#682 | Valencia Energy Facility | Belen, NM | 242.7 GWh |
#683 | NAEA Lakewood LLC | Lakewood, NJ | 245.5 GWh |
#684 | T B Simon Power Plant | East Lansing, MI | 241.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Denton Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
BT Cooke Solar, LLC | Gainsville, TX | 112.4 GWh | 23.2 mi |
Connolly BESS | Decatur, TX | 15.4 GWh | 12.1 mi |
CoServ Community Solar Station | Aubrey, TX | 1.8 GWh | 13.9 mi |
Farmers Branch Renewable Energy Facility | Lewisville, TX | 24.1 GWh | 19.4 mi |
HEB00789 | Frisco, TX | 177.0 MWh | 21.4 mi |
Noble Solar | Krum, TX | 460.8 GWh | 3.6 mi |
Porter Solar, LLC (TX) | Krum, TX | 83.6 GWh | 11.4 mi |
Spencer | Denton, TX | 46.6 GWh | 6.1 mi |
State Farm Insur Support Center Central | Irving, TX | 8.0 MWh | 24.1 mi |
Toyota HQ Plan | Plano, TX | 8.5 GWh | 23.2 mi |
WAL202 | Frisco, TX | 76.0 MWh | 24.9 mi |
WAL266 | Grapevine, TX | 358.0 MWh | 21.5 mi |
WAL2883 | Plano, TX | 179.0 MWh | 25.1 mi |
WAL2980 | Fort Worth, TX | 315.0 MWh | 22.5 mi |
WAL3777 | Frisco, TX | 3.0 MWh | 19 mi |
WAL5080 | Hurst, TX | 289.0 MWh | 25.4 mi |
WAL5311 | Mckinney, TX | 3.0 MWh | 27.4 mi |
WAL5316 | Saginaw, TX | 354.0 MWh | 25.2 mi |
WAL5764 | Fort Worth, TX | 318.0 MWh | 20.7 mi |
Wildcat Creek Wind Farm LLC | Gainesville, TX | 544.4 GWh | 24.1 mi |