Decker Creek
8003 Decker Ln, Austin, TX 78724Plant Summary Information
Decker Creek is ranked #133 out of 288 natural gas power plants in Texas in terms of total annual net electricity generation.
Decker Creek is comprised of 4 generators and generated 12.9 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Decker Creek |
---|---|
Utility Name | Austin Energy |
Location | Travis County, TX |
Initial Operation Date | July 1971 |
Last Update | Dec 2022 |
Annual Generation | 115.4 GWh |
Annual Consumption | 1.6 M MMBtu |
Ranked #2,966 out of 11,249 Power Plants Nationwide | |
Ranked #867 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #423 out of 721 Texas Power Plants | |
Ranked #133 out of 288 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Decker Creek
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Decker Creek.
Monthly Net Generation for Decker Creek
Decker Creek Details
Summary Information | |
---|---|
Plant Name | Decker Creek (3548) |
Plant Address | 8003 Decker Ln Austin, TX 78724 |
Utility | Austin Energy (1015) |
Latitude, Longitude | 30.3033, -97.6128 |
Generation Dates on File | Jan 2001 to Dec 2022 |
Initial Operation Date | July 1971 |
Annual Generation | 115.4 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Lake Walter E. Long |
Ash Impoundment | |
Transmission / Distribution Owner | Austin Energy (1015) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | ENTERPRISE TEXAS PIPELINE |
Natural Gas Storage | No |
Generator GT1 Details Operating September 1988
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 51.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 52 MW |
Winter Capacity | 60 MW |
Minimum Load | 49 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1988 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT2 Details Operating September 1988
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 51.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 52 MW |
Winter Capacity | 60 MW |
Minimum Load | 49 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1988 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT3 Details Operating September 1988
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 51.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 52 MW |
Winter Capacity | 60 MW |
Minimum Load | 49 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1988 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT4 Details Operating September 1988
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 51.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 52 MW |
Winter Capacity | 60 MW |
Minimum Load | 49 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1988 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Decker Creek Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#857 | Ector County Energy Center | Goldsmith, TX | 120.8 GWh |
#858 | Bridgeport Fuel Cell, LLC | Bridgeport, CT | 120.4 GWh |
#859 | Joseph J Seymour Power Project | Brooklyn, NY | 119.6 GWh |
#860 | Pleasant Valley (MN) | Dexter, MN | 126.6 GWh |
#861 | Ascend Performance Materials Texas Inc. | Alvin, TX | 117.7 GWh |
#862 | Fort Dodge | Dodge City, KS | 117.4 GWh |
#863 | Brunswick Cellulose | Brunswick, GA | 383.7 GWh |
#864 | WFEC GenCo LLC | Anadarko, OK | 116.9 GWh |
#865 | Angus Anson | Sioux Falls, SD | 118.1 GWh |
#866 | Hell Gate | Bronx, NY | 116.2 GWh |
#868 | Pixelle Specialty Solutions LLC - Chillicothe Facility | Chillicothe, OH | 276.0 GWh |
#869 | Victoria Port Power II LLC | Victoria, TX | 115.1 GWh |
#870 | Kansas Ethanol, LLC | Lyons, KS | 114.3 GWh |
#871 | University of Illinois Cogen Facility | Chicago, IL | 114.3 GWh |
#872 | Cargill Corn Milling Division | Eddyville, IA | 113.8 GWh |
#873 | Whiting Refinery | Whiting, IN | 499.0 GWh |
#874 | Mariposa Energy Project | Byron, CA | 112.5 GWh |
#875 | Greenwood (MO) | Greenwood, MO | 123.2 GWh |
#876 | Phillips 66 Rodeo Refinery | Rodeo, CA | 363.2 GWh |
#877 | C P Kelco San Diego Plant | San Diego, CA | 111.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Decker Creek.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Austin | Austin, TX | 13.6 GWh | 10.3 mi |
Austin Gas Recovery | Austin, TX | 31.2 GWh | 2.2 mi |
Bastrop Energy Center | Cedar Creek, TX | 3.2 TWh | 11.5 mi |
Canyon | Canyon Lake, TX | 14.2 MWh | 45.9 mi |
East Blackland Solar Project 1 | Manor, TX | 324.2 GWh | 12.2 mi |
Hal C Weaver Power Plant | Austin, TX | 371.0 GWh | 7.4 mi |
Hays Energy Project | San Marcos, TX | 5.3 TWh | 42.6 mi |
HEB00591 | Round Rock, TX | 386.0 MWh | 15.1 mi |
IKEA Round Rock 027 | Round Rock, TX | 1.7 GWh | 18.1 mi |
Lost Pines 1 Power Project | Bastrop, TX | 3.5 TWh | 23 mi |
Marble Falls | Marble Falls, TX | 10.7 GWh | 42.2 mi |
Marshall Ford | Austin, TX | 51.8 GWh | 18.6 mi |
Mesquite Creek LFGTE Project | New Braunfels, TX | 22.3 GWh | 46.2 mi |
PowerFin Kingsbery | Austin, TX | 4.4 GWh | 5 mi |
Robert Mueller Energy Center | Austin, TX | 29.4 GWh | 5.7 mi |
Sand Hill | Austin, TX | 2.1 TWh | 6.5 mi |
Sim Gideon | Bastrop, TX | 860.1 GWh | 23.1 mi |
WAL5480 | Round Rock, TX | 342.0 MWh | 15.9 mi |
Webberville Solar Project | Manor, TX | 65.7 GWh | 7.7 mi |
Winchester Power Park | Winchester, TX | 89.4 GWh | 41.6 mi |