Decatur-Morgan Co LFG Recovery Project
620 Landfill Dr., Trinity, AL 35673Plant Summary Information
Decatur-Morgan Co LFG Recovery Project is ranked #2 out of 2 landfill gas power plants in Alabama in terms of total annual net electricity generation.
Decatur-Morgan Co LFG Recovery Project is comprised of 2 generators and generated 2.8 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Decatur-Morgan Co LFG Recovery Project |
---|---|
Utility Name | EDL Inc |
Location | Morgan County, AL |
Initial Operation Date | August 2010 |
Last Update | Dec 2023 |
Annual Generation | 10.7 GWh |
Annual Consumption | 130.5 k MMBtu |
Ranked #5,792 out of 11,835 Power Plants Nationwide | |
Ranked #221 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #71 out of 75 Alabama Power Plants | |
Ranked #2 out of 2 Alabama Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Previous Operators |
Granger Electric Co (2013 to 2016) Energy Developments, Inc II (2017 to 2017) EDL Inc (2018 to 2023) |
Map of Decatur-Morgan Co LFG Recovery Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Decatur-Morgan Co LFG Recovery Project.
Monthly Net Generation for Decatur-Morgan Co LFG Recovery Project
Decatur-Morgan Co LFG Recovery Project Details
Summary Information | |
---|---|
Plant Name | Decatur-Morgan Co LFG Recovery Project (58061) |
Plant Address | 620 Landfill Dr., Trinity, AL 35673 |
Utility | EDL Inc (55858) |
Latitude, Longitude | 34.62361, -87.10111 |
Generation Dates on File | Jan 2013 to Dec 2023 |
Initial Operation Date | August 2010 |
Annual Generation | 10.7 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Tennessee Valley Authority (TVA) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Joe Wheeler Elec Member Corp (9739) AL |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 1496 Details Operating August 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2010 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 0290 Details Operating July 2011
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2011 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Decatur-Morgan Co LFG Recovery Project Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#211 | Southbridge Landfill Gas-to-Energy | Southbridge, MA | 11.7 GWh |
#212 | Winnebago County Landfill Gas | Oshkosh, WI | 11.4 GWh |
#213 | Venice Resources Gas Recovery | Lennon, MI | 11.2 GWh |
#214 | Bi-County Gas Producers | Woodlawn, TN | 11.2 GWh |
#215 | Renewable Energy Services of Ohio | Milan, OH | 11.1 GWh |
#216 | Berlin Landfill Gas | Berlin, WI | 11.1 GWh |
#217 | Glades Pike Generation Plant | Somerset, PA | 11.1 GWh |
#218 | Onslow Power Producers | Jacksonville, NC | 10.9 GWh |
#219 | Front Range Project | Erie, CO | 10.9 GWh |
#220 | G2 Energy Hay Rd | Vacaville, CA | 10.8 GWh |
#222 | Clinton LFGTE | Clinton, IL | 10.6 GWh |
#223 | Ridgewood Providence Power | Johnston, RI | 10.2 GWh |
#224 | Waste Management Piedmont LFGTE Project | Kernersville, NC | 10.0 GWh |
#225 | Cold Canyon 1 | San Luis Obispo, CA | 10.0 GWh |
#226 | Santa Cruz Energy | Santa Cruz, CA | 10.0 GWh |
#227 | MM Albany Energy | Albany, NY | 9.7 GWh |
#228 | MM Tulare Energy | Visalia, CA | 9.7 GWh |
#229 | Hernando | Brooksville, FL | 9.7 GWh |
#230 | Hill AFB LFG Facility, Bldg #737 | Hill AFB, UT | 9.5 GWh |
#231 | Frederick County LFGTE Facility | Winchester, VA | 9.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Decatur-Morgan Co LFG Recovery Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ABC Coke | Tarrant, AL | 83.0 MWh | 74.2 mi |
Browns Ferry | Decatur, AL | 30.5 TWh | 5.7 mi |
Colbert | Tuscumbia, AL | 78.7 GWh | 43.3 mi |
Cumblerland Land Holdings, LLC | Elkmont, AL | 28.6 GWh | 26.1 mi |
Decatur Energy Center | Decatur, AL | 3.0 TWh | 4.5 mi |
Elora Solar | Elora, TN | 309.7 GWh | 52.6 mi |
Guntersville | Guntersville, AL | 453.4 GWh | 42.6 mi |
James H Miller Jr | Quinton, AL | 17.1 TWh | 68.6 mi |
Lewis Smith Dam | Jasper, AL | 233.4 GWh | 47.2 mi |
Morgan Energy Center | Decatur, AL | 4.5 TWh | 2.4 mi |
Muscle Shoals | Cherokee, AL | 437.0 GWh | 46.7 mi |
Packaging Corp of America | Counce, TN | 409.7 GWh | 72.3 mi |
Pickwick Landing Dam | Pickwick Dam, TN | 1.1 TWh | 72 mi |
Redstone Arsenal Hybrid | Huntsville, AL | 15.5 GWh | 27.9 mi |
River Bend Solar, LLC | Florence, AL | 151.5 GWh | 44.5 mi |
Sand Valley Power Station | Collinsville, AL | 30.6 GWh | 72.9 mi |
TAI Huntsville Solar Hybrid | Huntsville, AL | 13.3 GWh | 30.3 mi |
Tims Ford | Winchester, TN | 41.7 GWh | 61.2 mi |
Wheeler Dam | Town Creek, AL | 1.1 TWh | 20.4 mi |
Wilson Dam | Muscle Shoals, AL | 2.2 TWh | 32.1 mi |