Darlington County
4030 West Bobo Newsom Highway, Hartsville, SC 29550Plant Summary Information
Darlington County is ranked #48 out of 189 power plants in South Carolina in terms of total annual net electricity generation.
Darlington County is comprised of 2 generators and generated 23.5 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Darlington County |
---|---|
Utility Name | Duke Energy Progress - (NC) |
Location | Darlington County, SC |
Initial Operation Date | August 1974 |
Last Update | Dec 2022 |
Annual Generation | 95.1 GWh |
Annual Consumption | 1.2 M MMBtu |
Ranked #3,191 out of 11,249 Power Plants Nationwide | |
Ranked #969 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #48 out of 189 South Carolina Power Plants | |
Ranked #12 out of 26 South Carolina Natural Gas Power Plants | |
Fuel Types | Natural Gas : 83.0% Distillate Fuel Oil : 17.0% |
Map of Darlington County
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Darlington County.
Monthly Net Generation for Darlington County
Darlington County Details
Summary Information | |
---|---|
Plant Name | Darlington County (3250) |
Plant Address | 4030 West Bobo Newsom Highway Hartsville, SC 29550 |
Utility | Duke Energy Progress - (NC) (3046) |
Latitude, Longitude | 34.4185, -80.1657 |
Generation Dates on File | Jan 2001 to Dec 2022 |
Initial Operation Date | August 1974 |
Annual Generation | 95.1 GWh |
Fuel Types | Natural Gas : 83.0% Distillate Fuel Oil : 17.0% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) SC |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | CAROLINA GAS TRANSMISSION CORP |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator 12 Details Operating May 1997
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 158 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 115 MW |
Winter Capacity | 131 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1997 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 118 MW |
Net Winter Capacity With Natural Gas | 133 MW |
Net Summer Capacity With Oil | 118 MW |
Net Winter Capacity With Oil | 133 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Other Limits | Yes |
Generator 13 Details Operating June 1997
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 158 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 115 MW |
Winter Capacity | 133 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1997 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 116 MW |
Net Winter Capacity With Natural Gas | 133 MW |
Net Summer Capacity With Oil | 116 MW |
Net Winter Capacity With Oil | 133 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Other Limits | Yes |
Darlington County Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#959 | Alsey | Alsey, IL | 81.6 GWh |
#960 | Lordsburg Generating | Lordsburg, NM | 81.1 GWh |
#961 | Anheuser-Busch Jacksonville | Jacksonville, FL | 81.0 GWh |
#962 | Marshalltown | Marshalltown, IA | 80.6 GWh |
#963 | Woodland Pulp, LLC | Baileyville, ME | 402.5 GWh |
#964 | Wallingford Energy | Wallingford, CT | 80.0 GWh |
#965 | Wheaton | Eau Claire, WI | 85.1 GWh |
#966 | Lakefield Junction | Trimont, MN | 80.5 GWh |
#967 | Riverside Energy Resource Center | Riverside, CA | 79.6 GWh |
#968 | NRG Rockford I | Rockford, IL | 79.2 GWh |
#970 | Howard Down | Vineland, NJ | 78.7 GWh |
#971 | Marion | Marion, IL | 779.6 GWh |
#972 | DeCordova Steam Electric Station | Granbury, TX | 68.5 GWh |
#973 | Worthington Generation LLC | Worthington, IN | 78.1 GWh |
#974 | New York University Central Plant | New York, NY | 81.1 GWh |
#975 | Rensselaer Cogen | Rensselaer, NY | 77.4 GWh |
#976 | Yuba City Energy Center | Yuba City, CA | 77.3 GWh |
#977 | Sikorsky Aircraft CHP | Stratford, CT | 77.0 GWh |
#978 | Valencia Energy Facility | Belen, NM | 76.1 GWh |
#979 | Boise Cascade International Falls | International Falls, MN | 354.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Darlington County.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
1634 Solar | Hartsville, SC | 4.5 GWh | 7.4 mi |
Bishopville Solar II, LLC | Bishopville, SC | 8.0 MWh | 15 mi |
Centerfield Cooper Solar, LLC | Chesterfield, SC | 156.6 GWh | 20.2 mi |
Darlington Solar, LLC | Darlington, SC | 19.6 GWh | 15.7 mi |
Gaines Solar | Bishopville, SC | 4.6 GWh | 15.9 mi |
Gary Solar | Bishopville, SC | 3.9 GWh | 15.5 mi |
H B Robinson | Hartsville, SC | 7.3 TWh | 1.2 mi |
Hickson Solar, LLC | Wallace, SC | 19.0 MWh | 27.4 mi |
Jefferson Solar | Hartsville, SC | 658.0 MWh | 7.8 mi |
Lee County Landfill | Bishopville, SC | 15.1 GWh | 17.4 mi |
Marshall Solar | Hartsville, SC | 1.1 GWh | 8.8 mi |
Ogburn Solar, LLC | Jefferson, SC | 71.0 MWh | 21.3 mi |
Otis Elevator Company Solar | Florence, SC | 1.8 GWh | 24.6 mi |
Redwing Solar | Darlington, SC | 4.2 GWh | 18.7 mi |
River Solar | Lynchburg, SC | 3.8 GWh | 21.6 mi |
Sonoco Products Co | Hartsville, SC | 63.7 GWh | 6 mi |
Tedder Solar | Darlington, SC | 3.4 GWh | 15.9 mi |
Vincent Solar | Lynchburg, SC | 4.1 GWh | 22.8 mi |
Watauga Solar | Society Hill, SC | 3.9 GWh | 19.7 mi |
Weaver Solar | Lynchburg, SC | 3.3 GWh | 24.6 mi |