Dakota Range III Wind Project
TBD, Summit, SD 57266Plant Summary Information
Dakota Range III Wind Project is ranked #15 out of 50 power plants in South Dakota in terms of total annual net electricity generation.
Dakota Range III Wind Project generated 78.9 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Dakota Range III Wind Project |
---|---|
Utility Name | Engie North America |
Location | Grant County, SD |
Initial Operation Date | May 2021 |
Last Update | Aug 2024 |
Annual Generation | 476.5 GWh |
Annual Consumption | 1.8 M MMBtu |
Ranked #1,334 out of 11,835 Power Plants Nationwide | |
Ranked #362 out of 1,343 Wind Power Plants Nationwide | |
Ranked #15 out of 50 South Dakota Power Plants | |
Ranked #10 out of 25 South Dakota Wind Power Plants | |
Fuel Types | Wind |
Map of Dakota Range III Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Dakota Range III Wind Project.
Monthly Net Generation for Dakota Range III Wind Project
Dakota Range III Wind Project Details
Summary Information | |
---|---|
Plant Name | Dakota Range III Wind Project (63102) |
Plant Address | TBD, Summit, SD 57266 |
Utility | Engie North America (56201) |
Latitude, Longitude | 45.26762, -97.10398 |
Generation Dates on File | May 2021 to Aug 2024 |
Initial Operation Date | May 2021 |
Annual Generation | 476.5 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Otter Tail Power Co (14232) SD |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator WTG Details Operating May 2021
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 153.6 MW |
Summer Capacity | 153.6 MW |
Winter Capacity | 153.6 MW |
Minimum Load | 4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 32 |
Turbine Details | |
Number Of Turbines | 32 |
---|---|
Predominant Turbine Manufacturer | Nordex |
Predominant Turbine Model Number | N149/4.0-4.5 |
Design Wind Speed | 20.6 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 351 |
Dakota Range III Wind Project Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Dakota Range III, LLC | 1990 Post Oak BLVD., Suite 1900, Houston, TX 77056 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#352 | Los Vientos Windpower IV | Rio Grande City, TX | 495.6 GWh |
#353 | Desert Wind Farm, LLC | Hertford, NC | 493.3 GWh |
#354 | Blue Summit Wind LLC | Vernon, TX | 492.6 GWh |
#355 | Goldthwaite Wind Energy Facility | Goldthwaite, TX | 490.1 GWh |
#356 | Thunder Spirit Wind, LLC | Hettinger, ND | 487.7 GWh |
#357 | Clearwater Wind East | Miles City, MT | 486.8 GWh |
#358 | Montague Wind Power Facility LLC | Arlington, OR | 485.7 GWh |
#359 | Ensign Wind LLC | Montezuma, KS | 483.0 GWh |
#360 | Cimarron Wind Energy LLC | Cimmaron, KS | 479.4 GWh |
#361 | Big Horn Wind Project | Bickelton, WA | 477.7 GWh |
#363 | Cimarron Windpower II | Cimarron, KS | 475.5 GWh |
#364 | Ford County Wind Farm LLC | Ford County, IL | 475.2 GWh |
#365 | Voyager Wind II | Mojave, CA | 473.5 GWh |
#366 | Otter Creek Wind Farm LLC | Ransom, IL | 468.9 GWh |
#367 | Manzana Wind LLC | Rosamond, CA | 468.5 GWh |
#368 | Rocksprings | Del Rio, TX | 467.8 GWh |
#369 | Los Vientos Windpower III | Rio Grande City, TX | 465.2 GWh |
#370 | Walleye Wind | Beaver Creek, MN | 464.0 GWh |
#371 | Seven Mile Hill | Medicine Bow, WY | 463.2 GWh |
#372 | Senate Wind LLC | Bryson, TX | 463.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Dakota Range III Wind Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Astoria Station | Astoria, SD | 409.9 GWh | 54.8 mi |
Big Stone | Big Stone City, SD | 1.6 TWh | 29 mi |
Blazing Star Wind Farm 1 | Hendricks, MN | 812.3 GWh | 61.6 mi |
Buffalo Ridge II LLC | Elkton, SD | 346.5 GWh | 56.2 mi |
Coyote Ridge | White, SD | 380.6 GWh | 62.7 mi |
Crocker Wind Farm | Conde, SD | 788.7 GWh | 38.2 mi |
Crowned Ridge Wind Energy Center | Watertown, SD | 717.1 GWh | 15.2 mi |
Crowned Ridge Wind II Energy Center | Watertown, SD | 796.8 GWh | 20 mi |
Day County Wind LLC | Conde, SD | 416.7 GWh | 39.2 mi |
Deuel Harvest Wind Energy LLC | Clear Lake, SD | 1.0 TWh | 39.4 mi |
Groton Generation Station | Groton, SD | 201.9 GWh | 48.9 mi |
Lake Preston | Lake Preston, SD | 76.0 MWh | 63.8 mi |
Oak Tree Energy | Clark, SD | 66.7 GWh | 38.7 mi |
State Auto Insurance | Milbank, SD | 14.0 MWh | 23.9 mi |
Stevens Community Medical Center | Morris, MN | 8.0 MWh | 62.2 mi |
Tatanka Ridge | Toronto, SD | 581.5 GWh | 53.3 mi |
UMM Wind Turbine | Morris, MN | 4.5 GWh | 63.5 mi |
Valley Queen Cheese | Milbank, SD | 26.0 MWh | 22.9 mi |
Watertown Power Plant | Watertown, SD | 5.2 GWh | 25.3 mi |
WCROC Wind Farm | Morris, MN | 4.6 GWh | 63.5 mi |