40140 Silver Valley Road, Daggett, CA 92327Plant Summary Information
Daggett 3 is ranked #9 out of 5,765 solar farms nationwide in terms of total annual net electricity generation.
Daggett 3 generated 148.0 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Daggett 3 |
---|---|
Utility Name | Daggett Solar Power 3 LLC |
Location | San Bernardino County, CA |
Initial Operation Date | July 2023 |
Last Update | Jan 2025 |
Annual Generation | 882.8 GWh |
Annual Consumption | 3.2 M MMBtu |
Ranked #813 out of 11,979 Power Plants Nationwide | |
Ranked #9 out of 5,765 Solar Power Plants Nationwide | |
Ranked #38 out of 1,578 California Power Plants | |
Ranked #2 out of 807 California Solar Power Plants | |
Fuel Types | Solar |
Map of Daggett 3
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Daggett 3.
Monthly Net Generation for Daggett 3
Daggett 3 Details
Summary Information | |
---|---|
Plant Name | Daggett 3 (64852) |
Plant Address | 40140 Silver Valley Road, Daggett, CA 92327 |
Utility | Daggett Solar Power 3 LLC (64365) |
Latitude, Longitude | 34.86092, -116.85528 |
Generation Dates on File | Jul 2023 to Jan 2025 |
Initial Operation Date | July 2023 |
Annual Generation | 882.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 230.00 kV |
Energy Storage | Yes |
Generator DAGGB Details Operating July 2023
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 149 MW |
Summer Capacity | 149 MW |
Winter Capacity | 149 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 4.6 |
---|---|
Maximum Charge Rate | 2.3 MW |
Maximum Discharge Rate | 2.3 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 2.3 |
Storage Enclosure Type | CS |
Excess Wind And Solar Generation | P |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 64852 |
Direct Support Gen Id | DAGGP |
Support T D Asset | Yes |
Generator DAGGP Details Operating July 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 300 MW |
Summer Capacity | 300 MW |
Winter Capacity | 300 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 310 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Daggett 3 Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Gemini Solar | Unincorporated, NV | 1.7 TWh |
#2 | Sonoran Solar Energy | Buckeye, AZ | 1.1 TWh |
#3 | Topaz Solar Farm | Santa Margarita, CA | 1.1 TWh |
#4 | Roadrunner, LLC Hybrid | McCamey, TX | 1.0 TWh |
#5 | Aktina Solar | El Campo, TX | 957.1 GWh |
#6 | Roseland Solar Project, LLC | Riesel, TX | 946.0 GWh |
#7 | Eagle Shadow Mountain Solar Farm | Moapa River Indian Re, NV | 918.6 GWh |
#8 | 2W Permian Solar Project Hybrid | Andrews, TX | 912.5 GWh |
#10 | Solar Star 1 | Rosamond, CA | 880.6 GWh |
#11 | Hecate Energy Frye Solar LLC | Kress, TX | 873.5 GWh |
#12 | Waco Solar | Mount Calm, TX | 835.8 GWh |
#13 | Solana Generating Station | Gila Bend, AZ | 818.1 GWh |
#14 | Juno Solar Project | Lamesa, TX | 796.0 GWh |
#15 | Prospero Solar | Andrews, TX | 754.3 GWh |
#16 | Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 709.3 GWh |
#17 | Solar Star 2 | Rosamond, CA | 721.0 GWh |
#18 | Lumina Solar Project | Snyder, TX | 711.7 GWh |
#19 | Neptune Energy Center Hybrid | Boone, CO | 688.1 GWh |
#20 | Five Wells Solar Center - Hybrid | Rogers, TX | 705.1 GWh |
#21 | Texas Solar Nova 1 | Spur, TX | 704.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Daggett 3.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo Solar | Oro Grande, CA | 43.7 GWh | 30.5 mi |
Daggett 2 | Daggett, CA | 536.0 GWh | 0 mi |
Foundation Cemex BMQ | Apple Valley, CA | 3.5 GWh | 22 mi |
Lockhart ESS, LLC | Hinkley, CA | 24.8 GWh | 30.8 mi |
Lockhart Solar PV II | Hinkley, CA | 189.0 GWh | 30.7 mi |
Lockhart Solar PV, LLC | Hinkley, CA | 226.3 GWh | 30.7 mi |
Longboat Solar, LLC | Barstow, CA | 25.1 GWh | 25 mi |
Madelyn Solar, LLC | Silver Lake, CA | 2.5 GWh | 27.3 mi |
Mitchell Solar, LLC | Silver Lake, CA | 2.6 GWh | 27.4 mi |
Mojave Solar Project | Hinkley, CA | 635.5 GWh | 29.5 mi |
Navajo Solar Power Generation Station 1 LLC | Apple Valley, CA | 4.2 GWh | 28.7 mi |
Newberry Solar 1 LLC | Newberry Springs, CA | 1.3 GWh | 9.8 mi |
Nunn | Apple Valley, CA | 2.1 GWh | 29.7 mi |
Otoe Solar Power Generation Station 1 LLC | Apple Valley, CA | 3.5 GWh | 29 mi |
Powhatan Solar Power Generation Station 1 LLC | Apple Valley, CA | 3.9 GWh | 30.1 mi |
Rudy Solar, LLC | Silver Lake, CA | 2.6 GWh | 27.4 mi |
SEGS IX | Hinkley, CA | 112.0 GWh | 29.8 mi |
SunEdison Walmart Apple Valley DC | Apple Valley, CA | 969.0 MWh | 26.7 mi |
Sunray 2 | Daggett, CA | 56.7 GWh | 1.6 mi |
Sunray 3 | Daggett, CA | 32.6 GWh | 1.6 mi |