D'Arrigo Brothers - Phase 4
21777 Harris Rd, Salinas, CA 93908Plant Summary Information
D'Arrigo Brothers - Phase 4 is ranked #419 out of 747 solar farms in California in terms of total annual net electricity generation.
D'Arrigo Brothers - Phase 4 generated 1.2 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | D'Arrigo Brothers - Phase 4 |
---|---|
Utility Name | CalCom Energy |
Location | Monterey County, CA |
Initial Operation Date | March 2019 |
Last Update | Dec 2022 |
Annual Generation | 4.7 GWh |
Annual Consumption | 16.6 k MMBtu |
Ranked #7,601 out of 11,249 Power Plants Nationwide | |
Ranked #2,700 out of 5,158 Solar Power Plants Nationwide | |
Ranked #1,077 out of 1,501 California Power Plants | |
Ranked #419 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Map of D'Arrigo Brothers - Phase 4
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for D'Arrigo Brothers - Phase 4.
Monthly Net Generation for D'Arrigo Brothers - Phase 4
D'Arrigo Brothers - Phase 4 Details
Summary Information | |
---|---|
Plant Name | D'Arrigo Brothers - Phase 4 (63486) |
Plant Address | 21777 Harris Rd Salinas, CA 93908 |
Utility | CalCom Energy (63226) |
Latitude, Longitude | 36.616, -121.636 |
Generation Dates on File | Mar 2019 to Dec 2022 |
Initial Operation Date | March 2019 |
Annual Generation | 4.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator DA04 Details Operating March 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.7 MW |
Summer Capacity | 1.7 MW |
Winter Capacity | 1.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2019 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Other Planned Modifications | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 2.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator DA04B Details Operating July 2019
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 0.5 MW |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2019 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 0.8 |
---|---|
Maximum Charge Rate | 0.1 MW |
Maximum Discharge Rate | 0.1 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 0.1 |
Storage Enclosure Type | CS |
System Peak Shaving | Yes |
D'Arrigo Brothers - Phase 4 Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
D'Arrigo Brothers | 21777 Harris Rd, Salinas, CA 93908 | Generator DA04 | 100.00% |
D'Arrigo Brothers | 21777 Harris Rd, Salinas, CA 93908 | Generator DA04B | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2690 | Volney II | Fulton, NY | 4.7 GWh |
#2691 | ISM Solar Cranston CSG | Cranston, RI | 4.7 GWh |
#2692 | Ramona 1 | Ramona, CA | 4.7 GWh |
#2693 | Anderson (SC) | Anderson, SC | 4.7 GWh |
#2694 | Lon Wright | Fremont, NE | 491.8 GWh |
#2695 | WED GW Solar, LLC | Lincoln, RI | 4.7 GWh |
#2696 | Fort Bliss (DEA EPIC) | El Paso, TX | 4.7 GWh |
#2697 | Powatan Road Solar | Clayton, NC | 4.7 GWh |
#2698 | Ramapo | Mahwah, NJ | 4.7 GWh |
#2699 | Panda Solar NC 9, LLC | Hope Mills, NC | 4.7 GWh |
#2701 | Williams-Sonoma Solar Facility | Jamesburg, NJ | 4.7 GWh |
#2702 | Gaines Solar | Bishopville, SC | 4.6 GWh |
#2703 | SulusSolar35 | Molalla, OR | 4.6 GWh |
#2704 | Norton LLC | Norton, MA | 4.6 GWh |
#2705 | Duke Building 129 | Indianapolis, IN | 4.6 GWh |
#2706 | XPF Solar Field | Durham, NC | 4.6 GWh |
#2707 | Phoenix Airport Rental Car Center | Phoenix, AZ | 4.6 GWh |
#2708 | Winslow PV - BD Solar 2 LLC | Winslow, ME | 4.6 GWh |
#2709 | Higginsville Solar Farm | Higginsville, MO | 4.6 GWh |
#2710 | Marshall Solar Farm (MO) | Marshall, MO | 4.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding D'Arrigo Brothers - Phase 4.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Johnson Canyon | Gonzales, CA | 10.9 GWh | 13.8 mi |
Ameresco Santa Cruz Energy | Watsonville, CA | 17.7 GWh | 23.1 mi |
City of Soledad Water Reclamation | Soledad, CA | 4.4 GWh | 21.2 mi |
Dynegy Moss Landing Power Plant Hybrid | Moss Landing, CA | 5.6 TWh | 15.4 mi |
Enerparc CA1 LLC | Hollister, CA | 3.2 GWh | 19.7 mi |
Foundation California Training Facility | Soledad, CA | 6.1 GWh | 17.6 mi |
Foundation Dole Fresh Vegetables | Soledad, CA | 5.3 GWh | 19.2 mi |
Foundation Mann Packing | Gonzales, CA | 5.9 GWh | 12.7 mi |
Foundation SaIinas Valley State Prison | Soledad, CA | 5.6 GWh | 17.7 mi |
Gap Pacific Distribution Center | Fresno, CA | 6.1 GWh | 15.2 mi |
Gilroy Peaking Energy Center | Gilroy, CA | 29.3 GWh | 27 mi |
Graniterock Quarry | Aromas, CA | 2.5 GWh | 18.2 mi |
Hollister Solar LLC | Hollister, CA | 4.4 GWh | 20.5 mi |
Marina Landfill Gas | Marina, CA | 36.5 GWh | 10 mi |
Monterey One Water | Marina, CA | 9.4 GWh | 9.7 mi |
Monterey Regional Water Pollution Control Agency | Marina, CA | 1.2 GWh | 11.1 mi |
Taylor Farms | Gonzales, CA | 4.2 GWh | 12.8 mi |
Taylor Farms - Schilling Place | Salinas, CA | 7.1 GWh | 2.7 mi |
Taylor Farms Salinas | Salinas, CA | 1.9 GWh | 3 mi |
TLR000 Hansen Fuel Cell | Salinas, CA | 21.0 GWh | 2.9 mi |