Cutlass Solar 1 LLC
12907 FM 361 Road, Richmond, TX 77469Plant Summary Information
Cutlass Solar 1 LLC is ranked #70 out of 161 solar farms in Texas in terms of total annual net electricity generation.
Cutlass Solar 1 LLC generated 70.4 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Cutlass Solar 1 LLC |
---|---|
Utility Name | Cutlass Solar 1, LLC |
Location | Fort Bend County, TX |
Initial Operation Date | December 2022 |
Last Update | Aug 2024 |
Annual Generation | 209.1 GWh |
Annual Consumption | 794.4 k MMBtu |
Ranked #2,249 out of 11,835 Power Plants Nationwide | |
Ranked #253 out of 5,643 Solar Power Plants Nationwide | |
Ranked #388 out of 749 Texas Power Plants | |
Ranked #70 out of 161 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Cutlass Solar 1 LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cutlass Solar 1 LLC.
Monthly Net Generation for Cutlass Solar 1 LLC
Cutlass Solar 1 LLC Details
Summary Information | |
---|---|
Plant Name | Cutlass Solar 1 LLC (66310) |
Plant Address | 12907 FM 361 Road, Richmond, TX 77469 |
Utility | Cutlass Solar 1, LLC (65370) |
Latitude, Longitude | 29.40967, -95.73405 |
Generation Dates on File | Dec 2022 to Aug 2024 |
Initial Operation Date | December 2022 |
Annual Generation | 209.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | |
Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator CT1PV Details Operating December 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Jointly Owned |
Nameplate Capacity | 110.9 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 110.9 MW |
Winter Capacity | 110.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Lenses Mirrors | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 52 |
DC Net Capacity | 140 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Cutlass Solar 1 LLC Plant Owners
Owner Name | Address | Ownership |
---|---|---|
AP Cutlass Holdings LLC | 155 Federal Street, Boston, MA 2110 | 13.81% |
Eneos Renewable Energy USA LLC | 3040 Post Oak Blvd, Houston, TX 77056 | 49.90% |
Fuyo General Lease (USA) Inc | 733 Third Avenue, New York, NY 10017 | 36.29% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#243 | Copper Mountain Solar 4, LLC | Boulder City, NV | 214.2 GWh |
#244 | Iron Springs Solar, LLC | Cedar City, UT | 214.0 GWh |
#245 | Butler Solar Project 103 | Butler, GA | 213.9 GWh |
#246 | Quinto Solar PV Project | Gustine, CA | 213.5 GWh |
#247 | Escalante Solar II, LLC | Milford, UT | 212.9 GWh |
#248 | Assembly Solar II LLC | Lennon, MI | 212.7 GWh |
#249 | Escalante Solar I, LLC | Milford, UT | 212.6 GWh |
#250 | Granite Mountain Solar East, LLC | Cedar City, UT | 211.2 GWh |
#251 | Chicot Solar | Lake Village, AR | 210.7 GWh |
#252 | Escalante Solar III, LLC | Milford, UT | 209.7 GWh |
#254 | River Ferry Solar 1 | West Union, IL | 208.6 GWh |
#255 | Searcy Solar Hybrid | Searcy, AR | 208.2 GWh |
#256 | Sigurd Solar LLC | Sigurd, UT | 207.6 GWh |
#257 | Taylor County Solar | Butler, GA | 206.7 GWh |
#258 | Galloway 2 Solar Farm | Paint Rock, TX | 206.0 GWh |
#259 | Hecate Energy Highland LLC | Buford, OH | 204.2 GWh |
#260 | Wagyu | Damon, TX | 202.2 GWh |
#261 | Holliday Creek Solar | Fort Dodge, IA | 202.0 GWh |
#262 | Clover Creek Solar Community Solar | Mona, UT | 200.0 GWh |
#263 | Point Beach Solar | Two Creeks, WI | 198.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cutlass Solar 1 LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Braes Bayou Plant | Richmond, TX | 352.1 GWh | 8.4 mi |
Brazoria County Solar Project (Danciger) | Damon, TX | 385.6 GWh | 16.1 mi |
Brazoria West | Damon, TX | 408.5 GWh | 15.7 mi |
Bronson | Beasley, TX | 14.3 GWh | 16.7 mi |
Brotman Power Station | Rosharon, TX | 380.8 GWh | 18.3 mi |
Fighting Jays Solar Project | Needville, TX | 349.0 GWh | 3.6 mi |
Fort Bend Solar LLC | East Bernard, TX | 410.5 GWh | 18.1 mi |
FTBLID2 | Sugarland, TX | 1.8 GWh | 12.9 mi |
HEB00110 | Missouri City, TX | 244.0 MWh | 14.8 mi |
Jack Fusco Energy Center | Thompsons, TX | 3.2 TWh | 7.9 mi |
Mckeever | Fresno, TX | 578.0 MWh | 16.8 mi |
Newgulf Cogen | NewGulf, TX | 32.9 GWh | 14.2 mi |
Petra Nova Carbon Capture Cogen | Thompsons, TX | 109.0 GWh | 7.5 mi |
Rowland Solar II | Richmond, TX | 81.8 GWh | 3.1 mi |
W A Parish | Thompsons, TX | 11.6 TWh | 8 mi |
Wagyu | Damon, TX | 202.2 GWh | 12.4 mi |
WAL2993 | Sugar Land, TX | 319.0 MWh | 15.1 mi |
WAL3302 | Houston, TX | 369.0 MWh | 21.3 mi |
WAL3827 | Richmond, TX | 303.0 MWh | 19.5 mi |
WAL546 | Richmond, TX | 291.0 MWh | 10.4 mi |