Cutlass Solar 1 LLC
12907 FM 361 Road, Richmond, TX 77469Plant Summary Information
Cutlass Solar 1 LLC is ranked #75 out of 178 solar farms in Texas in terms of total annual net electricity generation.
Cutlass Solar 1 LLC generated 44.9 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Cutlass Solar 1 LLC |
---|---|
Utility Name | Cutlass Solar 1, LLC |
Location | Fort Bend County, TX |
Initial Operation Date | December 2022 |
Last Update | Dec 2024 |
Annual Generation | 213.8 GWh |
Annual Consumption | 776.2 k MMBtu |
Ranked #2,259 out of 11,949 Power Plants Nationwide | |
Ranked #266 out of 5,739 Solar Power Plants Nationwide | |
Ranked #395 out of 769 Texas Power Plants | |
Ranked #75 out of 178 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Cutlass Solar 1 LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cutlass Solar 1 LLC.
Monthly Net Generation for Cutlass Solar 1 LLC
Cutlass Solar 1 LLC Details
Summary Information | |
---|---|
Plant Name | Cutlass Solar 1 LLC (66310) |
Plant Address | 12907 FM 361 Road, Richmond, TX 77469 |
Utility | Cutlass Solar 1, LLC (65370) |
Latitude, Longitude | 29.40967, -95.73405 |
Generation Dates on File | Dec 2022 to Dec 2024 |
Initial Operation Date | December 2022 |
Annual Generation | 213.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | |
Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator CT1PV Details Operating December 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Jointly Owned |
Nameplate Capacity | 110.9 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 110.9 MW |
Winter Capacity | 110.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Lenses Mirrors | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 52 |
DC Net Capacity | 140 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Cutlass Solar 1 LLC Plant Owners
Owner Name | Address | Ownership |
---|---|---|
AP Cutlass Holdings LLC | 155 Federal Street, Boston, MA 2110 | 13.81% |
Eneos Renewable Energy USA LLC | 3040 Post Oak Blvd, Houston, TX 77056 | 49.90% |
Fuyo General Lease (USA) Inc | 733 Third Avenue, New York, NY 10017 | 36.29% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#256 | Assembly Solar II LLC | Lennon, MI | 224.2 GWh |
#257 | Wapello Solar LLC | Wapello, IA | 223.2 GWh |
#258 | RE Astoria | Rosamond, CA | 223.1 GWh |
#259 | Chesapeake Solar Project | Chesapeake, VA | 222.0 GWh |
#260 | Red Tailed Hawk Solar LLC | Pierce, TX | 221.5 GWh |
#261 | Black Bear Solar 1 | Montgomery, AL | 216.0 GWh |
#262 | Albemarle Beach Solar | Roper, NC | 215.8 GWh |
#263 | North Fork Solar Project | Snyder, OK | 215.2 GWh |
#264 | Copper Mountain Solar 4, LLC | Boulder City, NV | 214.2 GWh |
#265 | Butler Solar Project 103 | Butler, GA | 213.9 GWh |
#267 | Chicot Solar | Lake Village, AR | 213.6 GWh |
#268 | Quinto Solar PV Project | Gustine, CA | 213.5 GWh |
#269 | Iron Springs Solar, LLC | Cedar City, UT | 212.8 GWh |
#270 | Escalante Solar II, LLC | Milford, UT | 212.1 GWh |
#271 | Samson Solar Energy III LLC | Cunningham, TX | 212.0 GWh |
#272 | Granite Mountain Solar East, LLC | Cedar City, UT | 211.0 GWh |
#273 | Escalante Solar I, LLC | Milford, UT | 210.9 GWh |
#274 | Three Peaks Power | Cedar City, UT | 209.2 GWh |
#275 | Escalante Solar III, LLC | Milford, UT | 208.9 GWh |
#276 | Hunter Solar, LLC (CO) | Bennett, CO | 208.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cutlass Solar 1 LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Braes Bayou Plant | Richmond, TX | 386.9 GWh | 8.4 mi |
Brazoria County Solar Project (Danciger) | Damon, TX | 387.4 GWh | 16.1 mi |
Brazoria West | Damon, TX | 411.9 GWh | 15.7 mi |
Bronson | Beasley, TX | 14.3 GWh | 16.7 mi |
Brotman Power Station | Rosharon, TX | 453.8 GWh | 18.3 mi |
Fighting Jays Solar Project | Needville, TX | 283.8 GWh | 3.6 mi |
Fort Bend Solar LLC | East Bernard, TX | 430.0 GWh | 18.1 mi |
FTBLID2 | Sugarland, TX | 1.8 GWh | 12.9 mi |
HEB00110 | Missouri City, TX | 244.0 MWh | 14.8 mi |
Jack Fusco Energy Center | Thompsons, TX | 3.4 TWh | 7.9 mi |
Mckeever | Fresno, TX | 578.0 MWh | 16.8 mi |
Newgulf Cogen | NewGulf, TX | 32.9 GWh | 14.2 mi |
Old 300 Solar Center, LLC | Needville, TX | 196.7 GWh | 7.6 mi |
Petra Nova Carbon Capture Cogen | Thompsons, TX | 109.0 GWh | 7.5 mi |
Rowland Solar II | Richmond, TX | 208.3 GWh | 3.1 mi |
Second Division Solar | West Columbia, TX | 14.0 GWh | 16.5 mi |
W A Parish | Thompsons, TX | 12.2 TWh | 8 mi |
Wagyu | Damon, TX | 208.3 GWh | 12.4 mi |
WAL2993 | Sugar Land, TX | 319.0 MWh | 15.1 mi |
WAL546 | Richmond, TX | 291.0 MWh | 10.4 mi |