Cumberland County Solid Waste Complex
169 Jesse Bridge Road, Millville, NJ 8332Plant Summary Information
Cumberland County Solid Waste Complex is ranked #3 out of 5 landfill gas power plants in New Jersey in terms of total annual net electricity generation.
Cumberland County Solid Waste Complex is comprised of 3 generators and generated 5.5 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Cumberland County Solid Waste Complex |
---|---|
Utility Name | EPP Renewable Energy |
Location | Cumberland County, NJ |
Initial Operation Date | November 2008 |
Last Update | Dec 2023 |
Annual Generation | 21.4 GWh |
Annual Consumption | 293.3 k MMBtu |
Ranked #4,978 out of 11,835 Power Plants Nationwide | |
Ranked #148 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #53 out of 378 New Jersey Power Plants | |
Ranked #3 out of 5 New Jersey Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Previous Operators |
PPL Renewable Energy LLC (2013 to 2013) Talen Renewable Energy (2014 to 2014) EPP Renewable Energy (2015 to 2023) |
Map of Cumberland County Solid Waste Complex
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cumberland County Solid Waste Complex.
Monthly Net Generation for Cumberland County Solid Waste Complex
Cumberland County Solid Waste Complex Details
Summary Information | |
---|---|
Plant Name | Cumberland County Solid Waste Complex (56884) |
Plant Address | 169 Jesse Bridge Road, Millville, NJ 8332 |
Utility | EPP Renewable Energy (57249) |
Latitude, Longitude | 39.4494, -75.0928 |
Generation Dates on File | Nov 2008 to Dec 2023 |
Initial Operation Date | November 2008 |
Annual Generation | 21.4 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Atlantic City Electric Co (963) NJ |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator GEN 2 Details Operating November 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator GEN 3 Details Operating November 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator GEN1 Details Operating November 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cumberland County Solid Waste Complex Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
PPL New Jersey Biogas LLC | Two North Ninth Street, Allentown, PA 18104 | Generator GEN 2 | 100.00% |
PPL New Jersey Biogas LLC | Two North Ninth Street, Allentown, PA 18104 | Generator GEN 3 | 100.00% |
PPL New Jersey Biogas LLC | Two North Ninth Street, Allentown, PA 18104 | Generator GEN1 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#138 | Ameresco Jefferson City | Jefferson City, MO | 22.4 GWh |
#139 | Reventure Park | Charlotte, NC | 22.4 GWh |
#140 | Chestnut Ridge Gas Recovery | Heiskell, TN | 22.3 GWh |
#141 | Short Mountain | Eugene, OR | 22.2 GWh |
#142 | Millersville LFG | Severn, MD | 22.1 GWh |
#143 | Westside Landfill Gas Recovery | Aledo, TX | 22.0 GWh |
#144 | Five Oaks Gas Recovery | Taylorville, IL | 21.9 GWh |
#145 | Oak Ridge LFGTE | Logansport, IN | 21.7 GWh |
#146 | Eagle Valley (MI) | Orion, MI | 21.6 GWh |
#147 | Energy Developments, Hancock | Findlay, OH | 21.4 GWh |
#149 | Mesquite Creek LFGTE Project | New Braunfels, TX | 21.4 GWh |
#150 | Terry Bundy Generating Station | Lincoln, NE | 118.5 GWh |
#151 | Union Renewable Energy Facility | Enoree, SC | 21.1 GWh |
#152 | Gaston County Renewable Energy Center | Dallas, NC | 21.0 GWh |
#153 | Covel Gardens Gas Recovery | San Antonio, TX | 20.6 GWh |
#154 | DADS Gas Recovery | Aurora, CO | 20.6 GWh |
#155 | Oak Grove Power Producers | Arcadia, KS | 20.2 GWh |
#156 | Spruce Ridge Gas Recovery | Glencoe, MN | 20.2 GWh |
#157 | Greater New Bedford LFG Utiliz. Facility | New Bedford, MA | 19.9 GWh |
#158 | BMW Manufacturing Co | Greer, SC | 31.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cumberland County Solid Waste Complex.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Atlantic Coast Freezers Solar Facility | Vineland, NJ | 2.2 GWh | 5.9 mi |
Calpine Vineland Solar LLC | Vineland, NJ | 5.6 GWh | 1.7 mi |
Carlls Corner | Upper Deerfield Twp, NJ | 4.5 GWh | 5.8 mi |
CCUA Solar | Bridgeton, NJ | 2.6 GWh | 8 mi |
Cedar Branch | Buena Vista Township, NJ | 9.7 GWh | 7.8 mi |
Clayville | Vineland, NJ | 87.4 GWh | 4.3 mi |
Cornerstone Power Vineland I LLC | Vineland, NJ | 3.9 GWh | 2.7 mi |
Corning Pharmaceutical Glass | Vineland, NJ | 2.9 GWh | 5.1 mi |
Howard Down | Vineland, NJ | 87.2 GWh | 4.1 mi |
KDC Solar ASGM | Bridgeton, NJ | 6.2 GWh | 7.2 mi |
Maple Solar | Vineland, NJ | 3.3 GWh | 6.5 mi |
Millville City Sewer Auth WTP | Millville, NJ | 1.5 GWh | 6 mi |
NJ Oak Solar Plant | Bridgetown, NJ | 15.4 GWh | 7 mi |
Pittsgrove Solar | Elmer, NJ | 2.3 GWh | 7.7 mi |
Seabrook Solar Plant | Seabrook, NJ | 8.9 GWh | 7 mi |
Sherman Avenue | Vineland, NJ | 32.9 GWh | 1.9 mi |
The City of Vineland at North Vineland | Vineland, NJ | 5.3 GWh | 6.4 mi |
The City of Vineland at West Vineland | Vineland, NJ | 3.5 GWh | 1.5 mi |
Vineland Headquarters | Vineland, NJ | 1.2 GWh | 4.1 mi |
Vineland Mays Landing Solar | Millville, NJ | 6.7 GWh | 6.7 mi |