CSU Long Beach Lots 7 & 14
1250 Bellflower Blvd, Long Beach, CA 90840Plant Summary Information
CSU Long Beach Lots 7 & 14 is ranked #348 out of 799 solar farms in California in terms of total annual net electricity generation.
CSU Long Beach Lots 7 & 14 generated 1.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | CSU Long Beach Lots 7 & 14 |
---|---|
Utility Name | MN8 Energy LLC |
Location | Los Angeles County, CA |
Initial Operation Date | December 2017 |
Last Update | Dec 2023 |
Annual Generation | 6.9 GWh |
Annual Consumption | 24.6 k MMBtu |
Ranked #6,982 out of 11,835 Power Plants Nationwide | |
Ranked #2,323 out of 5,643 Solar Power Plants Nationwide | |
Ranked #969 out of 1,569 California Power Plants | |
Ranked #348 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Solar Star California XLVII, LLC (2018 to 2019) Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2023) |
Map of CSU Long Beach Lots 7 & 14
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CSU Long Beach Lots 7 & 14.
Monthly Net Generation for CSU Long Beach Lots 7 & 14
CSU Long Beach Lots 7 & 14 Details
Summary Information | |
---|---|
Plant Name | CSU Long Beach Lots 7 & 14 (62028) |
Plant Address | 1250 Bellflower Blvd, Long Beach, CA 90840 |
Utility | MN8 Energy LLC (61944) |
Latitude, Longitude | 33.78104, -118.11357 |
Generation Dates on File | Jan 2018 to Dec 2023 |
Initial Operation Date | December 2017 |
Annual Generation | 6.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 18-341 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator CSULB Details Operating December 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 4.5 MW |
Summer Capacity | 3.3 MW |
Winter Capacity | 1.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 10 |
DC Net Capacity | 4.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
CSU Long Beach Lots 7 & 14 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2313 | Bradford Solar | Haverhill, MA | 6.9 GWh |
#2314 | Old Wardour Solar | East Brookfield, MA | 6.9 GWh |
#2315 | Vuelta Solar | East Brookfield, MA | 6.9 GWh |
#2316 | Nash 64 Farm | Spring Hope, NC | 6.9 GWh |
#2317 | Townline Community Solar | Batavia, NY | 6.9 GWh |
#2318 | American Goldfinch SCS ACY2 NJ, LLC | Burlington, NJ | 6.9 GWh |
#2319 | Solar Photovoltaic Project #42 | Tulare, CA | 6.9 GWh |
#2320 | PopeSun CSG, LLC | Starbuck, MN | 6.9 GWh |
#2321 | Fiddler's Canyon #1 | Cedar City, UT | 6.9 GWh |
#2322 | Carvers Creek Solar | Gloucester, VA | 6.9 GWh |
#2324 | 71 Charlotte Furnace Rd Hybrid(CSG) | Wareham, MA | 6.8 GWh |
#2325 | Blackjack Solar | King City, CA | 6.9 GWh |
#2326 | Sweden 1 | Sweden, NY | 6.9 GWh |
#2327 | Ravenbrook | Carver, MA | 6.9 GWh |
#2328 | Hemings Solar | Warsaw, VA | 6.9 GWh |
#2329 | True North | Salisbury, MA | 6.9 GWh |
#2330 | Pine Tree Solar Project | Owenyo, CA | 6.9 GWh |
#2331 | Upper Blackstone (MA) Treasure Valley | Rutland, MA | 6.9 GWh |
#2332 | Montrose Solar | Montrose, MN | 6.9 GWh |
#2333 | South Goshen Community Solar | Goshen, NY | 6.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CSU Long Beach Lots 7 & 14.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AES Alamitos Energy Center | Long Beach, CA | 2.5 TWh | 1.2 mi |
AES Alamitos LLC | Long Beach, CA | 201.8 GWh | 1.1 mi |
Barre Peaker | Stanton, CA | 21.5 GWh | 7.7 mi |
BCE Los Alamitos 1 | Los Alamitos, CA | 3.6 GWh | 2.9 mi |
BCE Los Alamitos 2 | Los Alamitos, CA | 3.4 GWh | 3.6 mi |
Colon PV | Wilmington, CA | 1.4 GWh | 8 mi |
Dominguez Plant | Long Beach, CA | 13.7 GWh | 8.2 mi |
Equilon Los Angeles Refining | Wilmington, CA | 320.1 GWh | 7 mi |
Harbor | Wilmington, CA | 163.1 GWh | 8.8 mi |
Harbor Cogen | Wilmington, CA | 25.6 GWh | 6.7 mi |
Haynes | Long Beach, CA | 2.5 TWh | 1.4 mi |
Long Beach Generation LLC | Long Beach, CA | 10.1 GWh | 6.5 mi |
Signal Hill West Unit | Signal Hill, CA | 35.3 GWh | 4.1 mi |
Southeast Resource Recovery | Long Beach, CA | 89.9 GWh | 7.4 mi |
Stanton Energy Reliability Center Hybrid | Stanton, CA | 1.6 GWh | 7.6 mi |
THUMS | Long Beach, CA | 342.8 GWh | 5.8 mi |
Toyota Long Beach Trigen | Long Beach, CA | 5.1 GWh | 6.3 mi |
Valero Wilmington Cogeneration Plant | Wilmington, CA | 236.7 GWh | 7.2 mi |
Watson Cogeneration | Carson, CA | 2.4 TWh | 7.9 mi |
Wilmington Hydrogen Plant | Wilmington, CA | 179.9 GWh | 7.3 mi |