CSU Fresno Solar Project
5241 North Maple Ave., Fresno, CA 93740Plant Summary Information
CSU Fresno Solar Project is ranked #726 out of 747 solar farms in California in terms of total annual net electricity generation.
CSU Fresno Solar Project generated 158.4 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | CSU Fresno Solar Project |
---|---|
Utility Name | MMA Fresno Power LP |
Location | Fresno County, CA |
Initial Operation Date | December 2007 |
Last Update | Dec 2022 |
Annual Generation | 635.0 MWh |
Annual Consumption | 2.4 k MMBtu |
Ranked #10,436 out of 11,249 Power Plants Nationwide | |
Ranked #5,024 out of 5,158 Solar Power Plants Nationwide | |
Ranked #1,462 out of 1,501 California Power Plants | |
Ranked #726 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Map of CSU Fresno Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CSU Fresno Solar Project.
Monthly Net Generation for CSU Fresno Solar Project
CSU Fresno Solar Project Details
Summary Information | |
---|---|
Plant Name | CSU Fresno Solar Project (56813) |
Plant Address | 5241 North Maple Ave. Fresno, CA 93740 |
Utility | MMA Fresno Power LP (56028) |
Latitude, Longitude | 36.80984, -119.74167 |
Generation Dates on File | Jan 2008 to Dec 2022 |
Initial Operation Date | December 2007 |
Annual Generation | 635.0 MWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 08-92-00 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 1 Details Operating December 2007
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2007 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 0.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 0.5 MW |
Virtual Net Metering Agreement | No |
Generator 2 Details Operating December 2007
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2007 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 2 |
DC Net Capacity | 0.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 0.5 MW |
Virtual Net Metering Agreement | No |
CSU Fresno Solar Project Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5014 | Solar Photovoltaic Project #03 | Rialto, CA | 681.1 MWh |
#5015 | Wild Horse | Ellensburg, WA | 564.1 GWh |
#5016 | Hopewell Valley High School Hybrid | Pennington, NJ | 675.9 MWh |
#5017 | USS Westeros Solar LLC CSG | Belle Plaine, MN | 660.9 MWh |
#5018 | Grand Prix Solar | Mt. Kisco, NY | 660.5 MWh |
#5019 | Jefferson Solar | Hartsville, SC | 658.0 MWh |
#5020 | Coxsackie Solar | Coxsackie, NY | 651.0 MWh |
#5021 | Crown Cooling Facility | Brawley, CA | 650.3 MWh |
#5022 | Arba Solar Energy Storage | Hamlet, NC | 618.0 MWh |
#5023 | Three Creeks | Parrish, FL | 637.0 MWh |
#5025 | NES Rutgers Solar | Lakewood, NJ | 634.1 MWh |
#5026 | Francis Scott Key Mall | Frederick, MD | 633.4 MWh |
#5027 | Van Epps Solar | Fultonville, NY | 619.0 MWh |
#5028 | Mariani Packing Vacaville Solar | Vacaville, CA | 608.6 MWh |
#5029 | Henry Miller RD | Dos Palos, CA | 593.0 MWh |
#5030 | 6685 Santa Barbara Ct | Elkridge, MD | 589.0 MWh |
#5031 | Yolo County Solar Project | Woodland, CA | 585.7 MWh |
#5032 | CSP Los Angeles | Lancaster, CA | 585.0 MWh |
#5033 | KDC Solar TC Little Patuxent WWTP LLC | West Friendship, MD | 572.0 MWh |
#5034 | Staples La Mirada, CA | La Mirada, CA | 571.1 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CSU Fresno Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Algonquin Power Sanger LLC | Sanger, CA | 3.2 GWh | 13.6 mi |
Borden Solar Farm | Madera, CA | 130.8 GWh | 15.1 mi |
CA - Fresno County - Juvenile Hall | Fresno, CA | 6.3 GWh | 10.3 mi |
Clovis East High School | Clovis, CA | 1.6 GWh | 5.6 mi |
Clovis High School | Clovis, CA | 1.5 GWh | 3.3 mi |
Clovis North High School | Fresno, CA | 1.6 GWh | 5.6 mi |
Fresno Bullard High School Hybrid | Fresno, CA | 2.3 GWh | 3.9 mi |
Fresno Hoover High School Hybrid | Fresno, CA | 2.2 GWh | 1.7 mi |
Fresno Sunnyside High School Hybrid | Fresno, CA | 2.6 GWh | 5.4 mi |
Friant Hydro Facility | Friant, CA | 75.7 GWh | 13.1 mi |
Kings River Syphon | Sanger, CA | 1.3 GWh | 16.9 mi |
La Joya Del Sol | Fresno, CA | 127.1 MWh | 9.6 mi |
Malaga Power LLC | Fresno, CA | 10.0 GWh | 8.3 mi |
National Raisin | Fowler, CA | 5.1 GWh | 13.4 mi |
OK Produce Fresno Carport | Fresno, CA | 1.6 GWh | 6.2 mi |
Pacific Ethanol Madera Solar Array | Madera, CA | 1.8 GWh | 14.7 mi |
Rio Bravo Fresno | Fresno, CA | 149.8 GWh | 8.4 mi |
Saint Agnes Medical Center | Fresno, CA | 32.0 GWh | 2.2 mi |
SCCCD - Clovis Community College | Fresno, CA | 2.2 GWh | 5.3 mi |
SCCCD - Fresno Community College | Fresno, CA | 4.0 GWh | 4.3 mi |