CSU Fresno Solar Project
5241 North Maple Ave., Fresno, CA 93740Plant Summary Information
CSU Fresno Solar Project is ranked #746 out of 799 solar farms in California in terms of total annual net electricity generation.
CSU Fresno Solar Project generated 130.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | CSU Fresno Solar Project |
---|---|
Utility Name | MMA Fresno Power LP |
Location | Fresno County, CA |
Initial Operation Date | December 2007 |
Last Update | Dec 2023 |
Annual Generation | 1.1 GWh |
Annual Consumption | 3.8 k MMBtu |
Ranked #10,757 out of 11,852 Power Plants Nationwide | |
Ranked #5,369 out of 5,655 Solar Power Plants Nationwide | |
Ranked #1,490 out of 1,570 California Power Plants | |
Ranked #746 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of CSU Fresno Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CSU Fresno Solar Project.
Monthly Net Generation for CSU Fresno Solar Project
CSU Fresno Solar Project Details
Summary Information | |
---|---|
Plant Name | CSU Fresno Solar Project (56813) |
Plant Address | 5241 North Maple Ave., Fresno, CA 93740 |
Utility | MMA Fresno Power LP (56028) |
Latitude, Longitude | 36.80984, -119.74167 |
Generation Dates on File | Jan 2008 to Dec 2023 |
Initial Operation Date | December 2007 |
Annual Generation | 1.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 08-92-00 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 1 Details Operating December 2007
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2007 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 0.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 0.5 MW |
Virtual Net Metering Agreement | No |
Generator 2 Details Operating December 2007
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2007 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 2 |
DC Net Capacity | 0.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 0.5 MW |
Virtual Net Metering Agreement | No |
CSU Fresno Solar Project Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5359 | Garden 1 Solar Park | Garden Township, MI | 1.1 GWh |
#5360 | Monterey Regional Water Pollution Control Agency | Marina, CA | 1.1 GWh |
#5361 | Amazon BDL3 Solar Project | New Haven, CT | 1.1 GWh |
#5362 | FECC Solar Benton | Benton, AR | 1.1 GWh |
#5363 | Shelby Solar Energy Generation Facility | Shelby, NC | 1.1 GWh |
#5364 | SunE- E Philadelphia Ontario | Ontario, CA | 1.1 GWh |
#5365 | CA-DGS RFP-Salinas Valley State Prison | Soledad, CA | 1.1 GWh |
#5366 | Town of East Bridgewater CSG | East Bridgewater, MA | 1.1 GWh |
#5367 | Willford Solar, LLC | Gladwin, MI | 1.1 GWh |
#5368 | Upson Rocky Creek Solar Plant | Thomaston, GA | 1.1 GWh |
#5370 | Solar Photovoltaic Project #18 | Fontana, CA | 1.1 GWh |
#5371 | Westside Avenue | North Bergen, NJ | 1.1 GWh |
#5372 | Western Branch High School | Chesapeake, VA | 1.1 GWh |
#5373 | USS Wolf Solar LLC | Wood Lake, MN | 1.1 GWh |
#5374 | Lowndes Cowart | Valdosta, GA | 1.1 GWh |
#5375 | Summit - Lysander (CSG) | Lysander, NY | 1.1 GWh |
#5376 | FTF-PackingShed | Reedley, CA | 1.1 GWh |
#5377 | KDC Solar TC Blandair Park LLC | West Friendship, MD | 1.1 GWh |
#5378 | Atlanta Falcons Solar | Atlanta, GA | 1.1 GWh |
#5379 | Hewlett-Packard (HP) - Andover, MA | Andover, MA | 1.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CSU Fresno Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Algonquin Power Sanger LLC | Sanger, CA | 8.3 GWh | 13.6 mi |
CA - Fresno County - Juvenile Hall | Fresno, CA | 5.4 GWh | 10.3 mi |
Clovis East High School | Clovis, CA | 1.4 GWh | 5.6 mi |
Clovis High School | Clovis, CA | 1.3 GWh | 3.3 mi |
Clovis North High School | Fresno, CA | 1.4 GWh | 5.6 mi |
Fresno Bullard High School Hybrid | Fresno, CA | 2.2 GWh | 3.9 mi |
Fresno Hoover High School Hybrid | Fresno, CA | 2.1 GWh | 1.7 mi |
Fresno Sunnyside High School Hybrid | Fresno, CA | 2.5 GWh | 5.4 mi |
Friant Hydro Facility | Friant, CA | 106.2 GWh | 13.1 mi |
La Joya Del Sol | Fresno, CA | 89.3 MWh | 9.6 mi |
Malaga Power LLC | Fresno, CA | 10.8 GWh | 8.3 mi |
National Raisin | Fowler, CA | 4.8 GWh | 13.4 mi |
OK Produce Fresno Carport | Fresno, CA | 3.1 GWh | 6.2 mi |
Pacific Ethanol Madera Solar Array | Madera, CA | 1.4 GWh | 14.7 mi |
POM Plant 1 | Del Rey, CA | 2.1 GWh | 13.6 mi |
POM Plant 2 | Del Rey, CA | 292.0 MWh | 13.4 mi |
Rio Bravo Fresno | Fresno, CA | 145.1 GWh | 8.4 mi |
Saint Agnes Medical Center | Fresno, CA | 25.5 GWh | 2.2 mi |
SCCCD - Clovis Community College | Fresno, CA | 2.0 GWh | 5.3 mi |
SCCCD - Fresno Community College | Fresno, CA | 3.8 GWh | 4.3 mi |