Crystal River
15760 West Powerline Street, Crystal River, FL 34428Plant Summary Information
Crystal River is ranked #24 out of 11,835 power plants nationwide in terms of total annual net electricity generation.
Crystal River is comprised of 8 generators and generated 4.8 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | Crystal River |
---|---|
Utility Name | Duke Energy Florida, LLC |
Location | Citrus County, FL |
Initial Operation Date | October 1966 |
Last Update | Aug 2024 |
Annual Generation | 16.5 TWh |
Annual Consumption | 141.0 M MMBtu |
Ranked #24 out of 11,835 Power Plants Nationwide | |
Ranked #3 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #3 out of 279 Florida Power Plants | |
Ranked #2 out of 85 Florida Natural Gas Power Plants | |
Fuel Types | Natural Gas : 76.4% Bituminous Coal : 23.5% |
Previous Operator |
Duke Energy Florida, Inc (2013 to 2015) Duke Energy Florida, LLC (2016 to 2023) |
Map of Crystal River
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Crystal River.
Monthly Net Generation for Crystal River
Crystal River Details
Summary Information | |
---|---|
Plant Name | Crystal River (628) |
Plant Address | 15760 West Powerline Street, Crystal River, FL 34428 |
Utility | Duke Energy Florida, LLC (6455) |
Latitude, Longitude | 28.9656, -82.6977 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | October 1966 |
Annual Generation | 16.5 TWh |
Fuel Types | Natural Gas : 76.4% Bituminous Coal : 23.5% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Progress Energy Florida (FPC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Gulf of Mexico |
Ash Impoundment | Yes Not Lined Operating |
Transmission / Distribution Owner | Duke Energy Florida, Inc (6455) FL |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | Other - Please explain in pipeline notes below. |
Pipeline Notes | Sabal Trail Pipeline. The Crystal River site is not connected to a LDC. Sabal Trail pipeline provides a direct NG connection to the Crystal River site, which includes Citrus County Combined Cycle. |
Generator ST4 Details Operating December 1982
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 739.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 712 MW |
Winter Capacity | 721 MW |
Minimum Load | 175 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1982 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
Generator 5 Details Operating October 1984
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 739.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 698 MW |
Winter Capacity | 721 MW |
Minimum Load | 250 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1984 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
Generator 1GTA Details Operating October 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 310.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 243 MW |
Winter Capacity | 295 MW |
Minimum Load | 243 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 1GTB Details Operating October 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 310.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 242 MW |
Winter Capacity | 295 MW |
Minimum Load | 242 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CC1ST Details Operating October 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 364.7 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 322 MW |
Winter Capacity | 335 MW |
Minimum Load | 322 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2GTA Details Operating November 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 310.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 245 MW |
Winter Capacity | 296 MW |
Minimum Load | 241 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2GTB Details Operating November 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 310.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 245 MW |
Winter Capacity | 297 MW |
Minimum Load | 242 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CC2ST Details Operating November 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC2 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 364.7 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 320 MW |
Winter Capacity | 336 MW |
Minimum Load | 320 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Crystal River Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Duke Energy Florida, LLC | P O Box 14042, St. Petersburg, FL 33733 | Generator 3 | 91.78% |
Orlando Utilities Comm | P O Box 3193, Orlando, FL 32802 | Generator 3 | 1.60% |
Seminole Electric Cooperative Inc | 16313 North Dale Mabry Highway, Tampa, FL 33618 | Generator 3 | 1.70% |
Several Municipals and Coops | , , | Generator 3 | 4.92% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | West County Energy Center | Loxahatchee, FL | 21.1 TWh |
#2 | Jack McDonough | Smyrna, GA | 18.3 TWh |
#4 | H Allen Franklin Combined Cycle | Smiths, AL | 12.3 TWh |
#5 | Greensville County Power Station | Emporia, VA | 12.0 TWh |
#6 | Barry | Bucks, AL | 12.4 TWh |
#7 | Union Power Station | El Dorado, AR | 11.6 TWh |
#8 | Guernsey Power Station | Byesville, OH | 11.5 TWh |
#9 | Hines Energy Complex | Bartow, FL | 11.3 TWh |
#10 | Okeechobee Clean Energy Center | Okeechobee, FL | 11.1 TWh |
#11 | Midland Cogeneration Venture | Midland, MI | 10.8 TWh |
#12 | Lackawanna Energy Center | Jessup, PA | 10.3 TWh |
#13 | Forney Energy Center | Forney, TX | 9.9 TWh |
#14 | Hanging Rock Energy Facility | Ironton, OH | 9.6 TWh |
#15 | Warren County | Front Royal, VA | 9.2 TWh |
#16 | Nine Mile Point | Westwego, LA | 8.9 TWh |
#17 | Fort Myers | Ft. Myers, FL | 8.9 TWh |
#18 | Lawrenceburg Power, LLC | Lawrenceburg, IN | 8.9 TWh |
#19 | York Energy Center | Delta, PA | 8.8 TWh |
#20 | Sherwood H Smith Jr Energy Complex | Hamlet, NC | 8.8 TWh |
#21 | South Field Energy | Wellsville, OH | 8.5 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Crystal River.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Anclote | Holiday, FL | 1.5 TWh | 54.3 mi |
Bay Trail Solar Power Plant | Crystal River, FL | 140.6 GWh | 2.8 mi |
Bell Ridge Solar | Trenton, FL | 189.3 GWh | 52 mi |
Butler Plaza | Gainesville, FL | 2.0 GWh | 49.3 mi |
Covanta Lake County Energy | Okahumpka, FL | 81.3 GWh | 51.3 mi |
Cutrale Citrus Juices USA I | Leesburg, FL | 24.5 GWh | 51.5 mi |
Deerhaven Generating Station | Gainesville, FL | 673.3 GWh | 57.9 mi |
Deerhaven Renewable | Gainesville, FL | 299.9 GWh | 58.3 mi |
G2 Energy Marion LLC | Ocala, FL | 8.7 GWh | 40.3 mi |
Hardeetown Solar Power Plant | Chiefland, FL | 154.6 GWh | 37 mi |
Hernando | Brooksville, FL | 9.7 GWh | 24.2 mi |
John R Kelly | Gainesville, FL | 603.3 GWh | 52.2 mi |
Mountain View Solar (FL) | Dade City, FL | 102.9 GWh | 48.7 mi |
Pasco Cnty Solid Waste Resource Recovery | Spring Hill, FL | 183.2 GWh | 42.1 mi |
Santa Fe Solar Power Plant | Archer, FL | 146.3 GWh | 41.6 mi |
Shady Hills Generating Station | Shady Hills, FL | 306.4 GWh | 42.2 mi |
Solar Park Gainesville, LLC | Gainesville, FL | 1.5 GWh | 55.2 mi |
South Energy Center | Gainesville, FL | 44.0 GWh | 51.2 mi |
Trenton Solar Power Plant | Trenton, FL | 140.6 GWh | 47.1 mi |
University of Florida | Gainesville, FL | 377.2 GWh | 51.1 mi |