Crystal Lake 3 LLC
804 310th Street, Britt, IA 50423Plant Summary Information
Crystal Lake 3 LLC is ranked #62 out of 124 wind farms in Iowa in terms of total annual net electricity generation.
Crystal Lake 3 LLC generated 51.5 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Crystal Lake 3 LLC |
---|---|
Utility Name | Crystal Lake 3 LLC |
Location | Winnebago County, IA |
Initial Operation Date | December 2009 |
Last Update | Oct 2024 |
Annual Generation | 249.0 GWh |
Annual Consumption | 917.9 k MMBtu |
Ranked #2,055 out of 11,866 Power Plants Nationwide | |
Ranked #624 out of 1,345 Wind Power Plants Nationwide | |
Ranked #76 out of 273 Iowa Power Plants | |
Ranked #62 out of 124 Iowa Wind Power Plants | |
Fuel Types | Wind |
Map of Crystal Lake 3 LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Crystal Lake 3 LLC.
Monthly Net Generation for Crystal Lake 3 LLC
Crystal Lake 3 LLC Details
Summary Information | |
---|---|
Plant Name | Crystal Lake 3 LLC (57468) |
Plant Address | 804 310th Street, Britt, IA 50423 |
Utility | Crystal Lake 3 LLC (56786) |
Latitude, Longitude | 43.3192, -93.8836 |
Generation Dates on File | Jan 2010 to Oct 2024 |
Initial Operation Date | December 2009 |
Annual Generation | 249.0 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | ITC Midwest LLC (56161) |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator GE1.5 Details Operating December 2009
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 66 MW |
Summer Capacity | 66 MW |
Winter Capacity | 66 MW |
Minimum Load | 3.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2009 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 44 |
Turbine Details | |
Number Of Turbines | 44 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 XLE |
Design Wind Speed | 16.8 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.5 |
Crystal Lake 3 LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#614 | Charles City Wind Farm | Charles City, IA | 258.3 GWh |
#615 | Kibby Wind Facility | Chain of Ponds, ME | 256.7 GWh |
#616 | Rail Splitter Wind Farm | Hopedale, IL | 255.9 GWh |
#617 | Reloj del Sol Wind Farm | San Ygnacio, TX | 255.1 GWh |
#618 | Sagebrush Power Partners | Ellensburg, WA | 255.0 GWh |
#619 | Leaning Juniper | Arlington, OR | 254.7 GWh |
#620 | Keenan II Renewable Energy Co LLC | Woodward, OK | 252.8 GWh |
#621 | Caprock Wind Farm | San Jon, NM | 251.5 GWh |
#622 | Elm Creek Wind II LLC | Trimont, MN | 251.1 GWh |
#623 | Borderlands Wind, LLC | Quemado, NM | 249.1 GWh |
#625 | Hatchet Ridge Wind Project | Burney, CA | 248.5 GWh |
#626 | Pinyon Pine I | Mojave, CA | 248.3 GWh |
#627 | Mustang Hills LLC | Mojave, CA | 248.1 GWh |
#628 | Golden Hills Wind | Livermore, CA | 247.8 GWh |
#629 | Alta Wind XI | Mojave, CA | 247.6 GWh |
#630 | Goat Wind LP | Sterling City, TX | 245.7 GWh |
#631 | Notrees Windpower Hybrid | Goldsmith, TX | 242.3 GWh |
#632 | Mendota Hills, LLC | Paw Paw, IL | 243.1 GWh |
#633 | Apple Blossom Wind Farm | Pigeon, MI | 242.3 GWh |
#634 | Bison 3 Wind Energy Center | New Salem, ND | 242.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Crystal Lake 3 LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Algona | Algona, IA | 1.4 GWh | 24.7 mi |
Bancroft | Bancroft, IA | 320.0 MWh | 16.9 mi |
Big Blue | Blue Earth, MN | 74.6 GWh | 25.5 mi |
Blue Earth | Blue Earth, MN | 31.0 MWh | 24.6 mi |
Forest City Light Plant | Forest City, IA | 120.0 MWh | 13.1 mi |
Forest City Solar | Forest City, IA | 5.0 GWh | 13.1 mi |
FPL Energy Crystal Lake Wind II LLC | Britt, IA | 741.7 GWh | 5.2 mi |
FPL Energy Crystal Lake Wind LLC | Britt, IA | 572.2 GWh | 7.8 mi |
Golden Plains | Buffalo Center, IA | 760.6 GWh | 10.2 mi |
Hancock County Wind Energy Center | Garner, IA | 268.7 GWh | 22.4 mi |
Iowa Distributed Wind Generation Project | Algona, IA | 4.3 GWh | 23.5 mi |
Kossuth | Lu Verne, IA | 541.7 GWh | 25.6 mi |
Kossuth County Wind | Lu Verne, IA | 296.1 GWh | 26.2 mi |
Lake Mills | Lake Mills, IA | 32.0 MWh | 18.9 mi |
Lake Mills Gas Recovery | Lake Mills, IA | 19.2 GWh | 17 mi |
Lakota Wind Wind Farm | Lakota, IA | 32.2 GWh | 14 mi |
Ledyard Windpower, LLC | Lakota, IA | 810.2 GWh | 13.6 mi |
Old Gold Energy Center, LLC | Joice, IA | 106.8 GWh | 23.9 mi |
POET Biorefining-Hanlontown, LLC | Hanlontown, IA | 16.1 GWh | 24.7 mi |
Winnebago Wind Power Project | Forest City, IA | 52.4 GWh | 5.7 mi |