Croydon CT Generating Station
955 River Rd., Bristol Twp., PA 19020Plant Summary Information
Croydon CT Generating Station is ranked #1 out of 53 distillate fuel oil power plants in Pennsylvania in terms of total annual net electricity generation.
Croydon CT Generating Station is comprised of 8 generators and generated 19.7 MWh during the 3-month period between August 2023 to November 2023.
Plant Name | Croydon CT Generating Station |
---|---|
Utility Name | Constellation Power, Inc |
Location | Bucks County, PA |
Initial Operation Date | June 1974 |
Last Update | Nov 2023 |
Annual Generation | 15.0 GWh |
Annual Consumption | 198.9 k MMBtu |
Ranked #5,389 out of 11,836 Power Plants Nationwide | |
Ranked #72 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #149 out of 231 Pennsylvania Power Plants | |
Ranked #1 out of 53 Pennsylvania Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Previous Operator |
Exelon Power (2013 to 2021) Constellation Power, Inc (2022 to 2023) |
Map of Croydon CT Generating Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Croydon CT Generating Station.
Monthly Net Generation for Croydon CT Generating Station
Croydon CT Generating Station Details
Summary Information | |
---|---|
Plant Name | Croydon CT Generating Station (8012) |
Plant Address | 955 River Rd., Bristol Twp., PA 19020 |
Utility | Constellation Power, Inc (6035) |
Latitude, Longitude | 40.08, -74.8917 |
Generation Dates on File | Feb 2001 to Nov 2023 |
Initial Operation Date | June 1974 |
Annual Generation | 15.0 GWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | PECO Energy Co (14940) PA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 11 Details Operating June 1974
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CROYDON 13 KV UNIT11 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CROYDON 13 KV UNIT11 |
Nameplate Capacity | 68.3 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 49 MW |
Winter Capacity | 65.7 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1974 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 12 Details Operating June 1974
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CROYDON 13 KV UNIT12 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CROYDON 13 KV UNIT12 |
Nameplate Capacity | 68.3 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 49 MW |
Winter Capacity | 65.4 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1974 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 21 Details Operating June 1974
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CROYDON 13 KV UNIT21 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CROYDON 13 KV UNIT21 |
Nameplate Capacity | 68.3 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 49 MW |
Winter Capacity | 67 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1974 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 22 Details Operating June 1974
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CROYDON 13 KV UNIT22 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CROYDON 13 KV UNIT22 |
Nameplate Capacity | 68.3 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 49 MW |
Winter Capacity | 65.9 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1974 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 41 Details Operating July 1974
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CROYDON 13 KV UNIT41 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CROYDON 13 KV UNIT41 |
Nameplate Capacity | 68.3 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 49 MW |
Winter Capacity | 64.2 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 1974 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 42 Details Operating July 1974
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CROYDON 13 KV UNIT42 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CROYDON 13 KV UNIT42 |
Nameplate Capacity | 68.3 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 49 MW |
Winter Capacity | 65.6 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 1974 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 31 Details Operating August 1974
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CROYDON 13 KV UNIT31 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CROYDON 13 KV UNIT31 |
Nameplate Capacity | 68.3 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 49 MW |
Winter Capacity | 65.5 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 1974 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 32 Details Operating August 1974
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CROYDON 13 KV UNIT32 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CROYDON 13 KV UNIT32 |
Nameplate Capacity | 68.3 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 48 MW |
Winter Capacity | 64.2 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 1974 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Croydon CT Generating Station Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#62 | Wheelabrator Portsmouth | Portsmouth, VA | 35.6 GWh |
#63 | Bowen | Cartersville, GA | 11.0 TWh |
#64 | Sooner | Red Rock, OK | 1.3 TWh |
#65 | Fruita | Grand Junction, CO | 33.9 GWh |
#66 | Wateree | Eastover, SC | 2.1 TWh |
#67 | Jeffrey Energy Center | St. Mary's, KS | 5.4 TWh |
#68 | Darbytown | Richmond, VA | 143.5 GWh |
#69 | Intercession City | Intercession City, FL | 295.1 GWh |
#70 | R W Miller | Palo Pinto, TX | 472.8 GWh |
#71 | Mountaineer | New Haven, WV | 6.1 TWh |
#73 | Schofield Generating Station | Schofield Barracks, HI | 33.6 GWh |
#74 | Sherwood H Smith Jr Energy Complex | Hamlet, NC | 8.8 TWh |
#75 | East Bend | Union, KY | 2.5 TWh |
#76 | White Bluff | Redfield, AR | 2.8 TWh |
#77 | Nearman Creek | Kansas, KS | 646.5 GWh |
#78 | Sherburne County | Becker, MN | 7.5 TWh |
#79 | Intermountain Power Project | Delta, UT | 4.1 TWh |
#80 | James E. Rogers Energy Complex | Cliffside, NC | 6.4 TWh |
#81 | Mayo | Roxboro, NC | 1.2 TWh |
#82 | Colstrip | Colstrip, MT | 9.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Croydon CT Generating Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AC Power | Delanco Township, NJ | 2.2 GWh | 3.1 mi |
American Goldfinch SCS ACY2 NJ, LLC | Burlington, NJ | 6.9 GWh | 2.7 mi |
BJ's Wholesale Club Inc Dist Center | Burlington, NJ | 2.1 GWh | 3.7 mi |
Bordentown Solar | Burlington, NJ | 9.2 GWh | 6.7 mi |
Burlington Coat Factory Solar | Florence, NJ | 4.7 GWh | 4.5 mi |
Campus Drive Solar | Burlington Township, NJ | 6.0 GWh | 1.7 mi |
Christmas Tree Shops DC Burlington NJ | Florence Township, NJ | 2.6 GWh | 4.5 mi |
Cinnaminson Landfill Solar | Cinnaminson, NJ | 17.1 GWh | 6.6 mi |
DCO Burlington | Burlington, NJ | 17.5 GWh | 4 mi |
Delanco | Delanco Township, NJ | 4.2 GWh | 3.1 mi |
Falls | Morrisville, PA | 60.0 MWh | 8.6 mi |
Florence Solar W3-080, LLC | Florence, NJ | 9.4 GWh | 5.6 mi |
IKEA Westhampton 061 | Westampton, NJ | 2.1 GWh | 5 mi |
Jefferson Torresdale Hospital | Philadelphia, PA | 2.5 GWh | 4.9 mi |
MF Mesa Lane LLC | Morrisville, PA | 3.1 GWh | 7.7 mi |
Mill Creek Solar | Burlington, NJ | 5.1 GWh | 4.9 mi |
Mount Laurel Solar | Mt. Laurel, NJ | 3.7 GWh | 7.2 mi |
PSEG Burlington Generating Station | Burlington, NJ | 27.6 GWh | 0.7 mi |
Summit Water Nexus Mt. Holly, LLC Solar | Lumberton, NJ | 1.2 GWh | 8 mi |
Tullytown | Morrisville, PA | 13.2 GWh | 7.7 mi |