Cross
553 Cross Station Road, Cross, SC 29436Plant Summary Information
Cross is ranked #9 out of 129 coal plants nationwide in terms of total annual net electricity generation.
Cross is comprised of 4 generators and generated 2.7 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | Cross |
---|---|
Utility Name | South Carolina Public Service Authority |
Location | Berkeley County, SC |
Initial Operation Date | May 1984 |
Last Update | Aug 2024 |
Annual Generation | 8.6 TWh |
Annual Consumption | 100.2 M MMBtu |
Ranked #86 out of 11,835 Power Plants Nationwide | |
Ranked #9 out of 129 Bituminous Coal Power Plants Nationwide | |
Ranked #4 out of 190 South Carolina Power Plants | |
Ranked #1 out of 8 South Carolina Bituminous Coal Power Plants | |
Fuel Types | Bituminous Coal : 99.6% |
Map of Cross
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cross.
Monthly Net Generation for Cross
Cross Details
Summary Information | |
---|---|
Plant Name | Cross (130) |
Plant Address | 553 Cross Station Road, Cross, SC 29436 |
Utility | South Carolina Public Service Authority (17543) |
Latitude, Longitude | 33.37151, -80.11324 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | May 1984 |
Annual Generation | 8.6 TWh |
Fuel Types | Bituminous Coal : 99.6% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | South Carolina Public Service Authority (SC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Diversion Canal |
Ash Impoundment | Yes Lined Out of Service |
Transmission / Distribution Owner | South Carolina Public Service Authority (17543) SC |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 2 Details Operating May 1984
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 556.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 565 MW |
Winter Capacity | 570 MW |
Minimum Load | 250 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1984 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 1 Details Operating May 1995
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 590.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 580 MW |
Winter Capacity | 585 MW |
Minimum Load | 260 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1995 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating January 2007
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 591 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 580 MW |
Winter Capacity | 610 MW |
Minimum Load | 250 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2007 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4 Details Operating October 2008
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 652 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 605 MW |
Winter Capacity | 615 MW |
Minimum Load | 250 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2008 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Bituminous Coal / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Cross Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Bituminous Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Gavin Power, LLC | Cheshire, OH | 13.0 TWh |
#2 | Prairie State Generating Station | Marissa, IL | 12.5 TWh |
#3 | Bowen | Cartersville, GA | 11.0 TWh |
#4 | Cardinal | Brillant, OH | 10.0 TWh |
#5 | Ghent | Ghent, KY | 9.8 TWh |
#6 | Gibson | Owensville, IN | 9.7 TWh |
#7 | Cumberland (TN) | Cumberland City, TN | 9.6 TWh |
#8 | John E Amos | St Albans, WV | 8.8 TWh |
#10 | H L Spurlock | Maysville, KY | 8.0 TWh |
#11 | Four Corners | Fruitland, NM | 8.0 TWh |
#12 | Mill Creek (KY) | Louisville, KY | 7.3 TWh |
#13 | Trimble County | Bedford, KY | 9.0 TWh |
#14 | Mountaineer | New Haven, WV | 6.1 TWh |
#15 | Roxboro | Semora, NC | 6.1 TWh |
#16 | Miami Fort | North Bend, OH | 4.8 TWh |
#17 | Clifty Creek | Madison, IN | 5.0 TWh |
#18 | Cayuga | Cayuga, IN | 4.5 TWh |
#19 | Kyger Creek | Cheshire, OH | 4.6 TWh |
#20 | Longview Power Plant | Maidsville, WV | 4.3 TWh |
#21 | FirstEnergy Fort Martin Power Station | Maidsville, WV | 4.3 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cross.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Abbot Solar | Manning, SC | 3.9 GWh | 22.4 mi |
Bani Solar | Olanta, SC | 4.3 GWh | 41.5 mi |
Berkeley County Landfill | Moncks Corner, SC | 2.5 GWh | 18 mi |
Bloom Solar | Summerton, SC | 3.7 GWh | 20.9 mi |
Bond Solar | Summerton, SC | 3.6 GWh | 22.3 mi |
Bonefish Solar | Manning, SC | 3.6 GWh | 24.6 mi |
Cameron Solar | Cameron, SC | 44.3 GWh | 37 mi |
Cameron Solar II | Cameron, SC | 7.9 GWh | 36.4 mi |
Dorchester Biomass | Harleyville, SC | 152.3 GWh | 21.5 mi |
Hagood | Charleston Heights, SC | 23.3 GWh | 38.6 mi |
Huntley | Bowman, SC | 157.8 GWh | 30.2 mi |
Jefferies | Moncks Corner, SC | 247.6 GWh | 11.3 mi |
Kapstone | Charleston, SC | 372.9 GWh | 33.7 mi |
Omtanke Solar | Ridgeville, SC | 10.4 GWh | 18.3 mi |
Palmetto Plains | Bowman, SC | 120.3 GWh | 33.8 mi |
Sapphire Solar | Lake City, SC | 3.7 GWh | 40.4 mi |
Spillway | Pineville, SC | 11.8 GWh | 6.4 mi |
St Stephen | St. Stephen, SC | 205.8 GWh | 11.2 mi |
TWE Bowman Solar Project | Bowman, SC | 124.4 GWh | 33.1 mi |
Williams | Goose Creek, SC | 1.6 TWh | 26.8 mi |