Crisfield
4079 Crisfield Highway, Crisfield, MD 21817Plant Summary Information
Crisfield is ranked #7 out of 18 distillate fuel oil power plants in Maryland in terms of total annual net electricity generation.
Crisfield is comprised of 4 generators and generated 891.9 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Crisfield |
---|---|
Utility Name | Calpine Mid-Atlantic Generation LLC |
Location | Somerset County, MD |
Initial Operation Date | May 1968 |
Last Update | Dec 2023 |
Annual Generation | 2.2 GWh |
Annual Consumption | 27.6 k MMBtu |
Ranked #9,732 out of 11,852 Power Plants Nationwide | |
Ranked #289 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #134 out of 179 Maryland Power Plants | |
Ranked #7 out of 18 Maryland Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Crisfield
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Crisfield.
Monthly Net Generation for Crisfield
Crisfield Details
Summary Information | |
---|---|
Plant Name | Crisfield (1563) |
Plant Address | 4079 Crisfield Highway, Crisfield, MD 21817 |
Utility | Calpine Mid-Atlantic Generation LLC (56609) |
Latitude, Longitude | 37.99413, -75.83768 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | May 1968 |
Annual Generation | 2.2 GWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 03-84 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Delmarva Power (5027) MD |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator CRIS Details Standby May 1968
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 50881 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 50881 |
Nameplate Capacity | 2.9 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.6 MW |
Winter Capacity | 2.6 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | Yes |
First Operation Date | May 1968 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator CRS2 Details Standby May 1968
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 50882 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 50882 |
Nameplate Capacity | 2.9 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.6 MW |
Winter Capacity | 2.6 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | Yes |
First Operation Date | May 1968 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator CRS3 Details Standby May 1968
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 50883 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 50883 |
Nameplate Capacity | 2.9 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.6 MW |
Winter Capacity | 2.6 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | Yes |
First Operation Date | May 1968 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator CRS4 Details Standby May 1968
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 50884 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 50884 |
Nameplate Capacity | 2.9 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.6 MW |
Winter Capacity | 2.6 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Standby |
---|---|
Synchronized To Transmission Grid | Yes |
First Operation Date | May 1968 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Crisfield Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#279 | TalenEnergy Montour | Washingtonville, PA | 2.3 TWh |
#280 | Possum Point | Dumfries, VA | 2.3 TWh |
#281 | Elizabeth River Power Station | Chesapeake, VA | 109.2 GWh |
#282 | Ray D Nixon | Fountain, CO | 930.7 GWh |
#283 | New Hampton | New Hampton, IA | 2.4 GWh |
#284 | Cleary Flood Hybrid | Taunton, MA | 49.6 GWh |
#285 | Brandywine Power Facility | Brandywine, MD | 545.5 GWh |
#286 | Covanta Southeastern Connecticut Company | Preston, CT | 116.0 GWh |
#287 | Noorvik | Noorvik, AK | 2.2 GWh |
#288 | Butler-Warner Generation Plant | Fayetteville, NC | 38.2 GWh |
#290 | Hilton Head | Hilton Head Island, SC | 2.1 GWh |
#291 | McCook | McCook, NE | 2.1 GWh |
#292 | DeCordova Steam Electric Station | Granbury, TX | 95.5 GWh |
#293 | Moreau | Moreau, MO | 2.1 GWh |
#294 | Skagway | Skagway, AK | 4.0 GWh |
#295 | Turkey Point | Homestead, FL | 21.4 TWh |
#296 | Wyodak | Gillette, WY | 1.9 TWh |
#297 | Kennedy International Airport Cogen | Jamaica, NY | 521.7 GWh |
#298 | Kotlik | Kotlik, AK | 2.0 GWh |
#299 | Webster City | Webster City, IA | 2.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Crisfield.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Belle Haven Diesel Generation Facility | Belle Haven, VA | 121.0 MWh | 30.9 mi |
CNE at Cambridge MD | Cambridge, MD | 5.9 GWh | 37.4 mi |
Commonwealth Chesapeake | New Church, VA | 30.4 GWh | 16.2 mi |
Eastern Correctional Institute | Westover, MD | 5.7 GWh | 13.5 mi |
Eastern Shore Solar, LLC | Oak Hall, VA | 133.7 GWh | 15 mi |
Gibbons CSG | Snow Hill, MD | 3.7 GWh | 34.9 mi |
Great Bay Solar 1 | Princess Anne, MD | 138.1 GWh | 14.3 mi |
Longview Solar | Hebron, MD | 23.3 GWh | 29.1 mi |
NASA Wallops Flight Facility Solar | Wallops Island, VA | 5.8 GWh | 20.2 mi |
Onancock Diesel Generation Facility | Onancock, VA | 122.0 MWh | 18.3 mi |
Perdue Diesel Generation Facility | Accomack, VA | 131.0 MWh | 20 mi |
Perdue Salisbury Photovoltaic | Salisbury, MD | 1.5 GWh | 30.9 mi |
Smith Island | Ewell, MD | 79.0 MWh | 11 mi |
Tangier | Tangier, VA | 88.0 MWh | 14.2 mi |
Tasley | Tasley, VA | 2.3 GWh | 21.2 mi |
UMES (MD) - Princess Anne | Princess Anne, MD | 2.4 GWh | 16.9 mi |
UMMS at Pocomoke | Pocomoke City, MD | 5.1 GWh | 14.3 mi |
Vienna Operations | Vienna, MD | 2.9 GWh | 34.1 mi |
Wicomico | Salisbury, MD | 15.4 GWh | 29.2 mi |
Wor-Wic Community College - Offsite | Hebron, MD | 3.5 GWh | 30 mi |