Craven County Wood Energy LP
201 Executive Parkway, New Bern, NC 28562Plant Summary Information
Craven County Wood Energy LP is ranked #22 out of 165 wood/wood waste solids power plants nationwide in terms of total annual net electricity generation.
Craven County Wood Energy LP is comprised of 1 generator and generated 102.9 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Craven County Wood Energy LP |
---|---|
Utility Name | CMS Generation Operating Co II |
Location | Craven County, NC |
Initial Operation Date | November 1990 |
Last Update | Mar 2024 |
Annual Generation | 332.9 GWh |
Annual Consumption | 5.2 M MMBtu |
Ranked #1,782 out of 11,249 Power Plants Nationwide | |
Ranked #22 out of 165 Wood/Wood Waste Solids Power Plants Nationwide | |
Ranked #28 out of 858 North Carolina Power Plants | |
Ranked #1 out of 5 North Carolina Wood/Wood Waste Solids Power Plants | |
Fuel Types | Wood/Wood Waste Solids : 65.3% Other Biomass Solids : 34.7% |
Map of Craven County Wood Energy LP
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Craven County Wood Energy LP.
Monthly Net Generation for Craven County Wood Energy LP
Craven County Wood Energy LP Details
Summary Information | |
---|---|
Plant Name | Craven County Wood Energy LP (10525) |
Plant Address | 201 Executive Parkway New Bern, NC 28562 |
Utility | CMS Generation Operating Co II (3837) |
Latitude, Longitude | 35.13019, -77.16788 |
Generation Dates on File | Jan 2001 to Mar 2024 |
Initial Operation Date | November 1990 |
Annual Generation | 332.9 GWh |
Fuel Types | Wood/Wood Waste Solids : 65.3% Other Biomass Solids : 34.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Wells and Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) NC |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 1UNI Details Operating November 1990
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Jointly Owned |
Nameplate Capacity | 50 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 47 MW |
Winter Capacity | 47 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1990 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Wood/Wood Waste Solids / Other Biomass Solids / Waste/Other Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Stoker Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | WDS / OBS / WO |
---|
Craven County Wood Energy LP Plant Owners
Owner Name | Address | Ownership |
---|---|---|
CMS Generation MI Power LLC | 2400 Miller Road, Dearborn, MI 48121 | 50.00% |
Atlantic Power Corporation | 3 Allied Drive, Suite 220, Dedham, MA 2026 | 50.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wood/Wood Waste Solids.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#12 | Deerhaven Renewable | Gainesville, FL | 297.5 GWh |
#13 | ReEnergy Livermore Falls | Livermore Falls, ME | 295.0 GWh |
#14 | ReEnergy Stratton LLC | Stratton, ME | 288.2 GWh |
#15 | Albany Green Energy | Albany, GA | 279.8 GWh |
#16 | Nacogdoches Power | Cushing, TX | 275.6 GWh |
#17 | Mead Coated Board | Mahrt, AL | 770.6 GWh |
#18 | ReEnergy Black River | Fort Drum, NY | 259.3 GWh |
#19 | Burney Forest Products | Burney, CA | 242.3 GWh |
#20 | Kapstone | Charleston, SC | 407.5 GWh |
#21 | Grayling Generating Station | Grayling, MI | 232.6 GWh |
#23 | Somerset Plant | Skowhegan, ME | 529.4 GWh |
#24 | International Paper Pine Hill Mill | Pine Hill, AL | 468.8 GWh |
#25 | Biomass One LP | White City, OR | 204.9 GWh |
#26 | Novo BioPower Plant | Snowflake, AZ | 203.0 GWh |
#27 | Woodland Biomass Power Ltd | Woodland, CA | 200.4 GWh |
#28 | J C McNeil | Burlington, VT | 188.5 GWh |
#29 | HL Power | Wendel, CA | 189.7 GWh |
#30 | Rio Bravo Rocklin | Lincoln, CA | 188.8 GWh |
#31 | Sierra Pacific Quincy Facility | Quincy, CA | 184.7 GWh |
#32 | Bay Front | Ashland, WI | 190.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Craven County Wood Energy LP.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Andrew Solar | New Bern, NC | 9.5 GWh | 3.9 mi |
Badger | Maysville, NC | 11.0 GWh | 20.4 mi |
Bayboro Solar Farm | Alliance, NC | 9.8 GWh | 20.2 mi |
Coogee Solar | Grantsboro, NC | 11.1 GWh | 19.5 mi |
Daystar Solar | Pollocksville, NC | 10.1 GWh | 6.8 mi |
Grove Solar | New Bern, NC | 13.8 GWh | 3.9 mi |
Hood Farm Solar, LLC | Trenton, NC | 9.7 GWh | 19.3 mi |
International Paper Co. - New Bern Mill | New Bern, NC | 219.7 GWh | 6.4 mi |
Lang Solar Farm | La Grange, NC | 10.1 GWh | 19.5 mi |
New Bern | New Bern, NC | 24.9 GWh | 4.2 mi |
New Bern Farm | Ernul, NC | 9.1 GWh | 8.3 mi |
Pecan Grove Solar, LLC | New Bern, NC | 9.3 GWh | 4.4 mi |
Plott Hound Solar | New Bern, NC | 8.0 GWh | 4.3 mi |
Pollocksville Solar | Pollocksville, NC | 9.3 GWh | 9.6 mi |
Porter Solar | New Bern, NC | 8.6 GWh | 8 mi |
Sweet Tea Solar, LLC | New Bern, NC | 6.7 GWh | 2.9 mi |
Trent River Farm | New Bern, NC | 9.6 GWh | 5 mi |
Trent River Solar, LLC | Pollocksville, NC | 149.9 GWh | 10.7 mi |
TWE New Bern Solar Project, LLC | New Bern, NC | 6.1 GWh | 2.5 mi |
Wyse Fork Solar Farm, LLC | Dover, NC | 3.4 GWh | 19.8 mi |