Cove Mountain Solar 2
TBD, Beryl, UT 84714Plant Summary Information
Cove Mountain Solar 2 is ranked #13 out of 121 power plants in Utah in terms of total annual net electricity generation.
Cove Mountain Solar 2 generated 93.6 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Cove Mountain Solar 2 |
---|---|
Utility Name | Cove Mountain Solar 2 LLC |
Location | Iron County, UT |
Initial Operation Date | October 2020 |
Last Update | Sep 2024 |
Annual Generation | 316.9 GWh |
Annual Consumption | 1.2 M MMBtu |
Ranked #1,785 out of 11,852 Power Plants Nationwide | |
Ranked #149 out of 5,655 Solar Power Plants Nationwide | |
Ranked #13 out of 121 Utah Power Plants | |
Ranked #1 out of 51 Utah Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
First Solar Project Development (2018 to 2018) Cove Mountain Solar 2 LLC (2019 to 2023) |
Map of Cove Mountain Solar 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cove Mountain Solar 2.
Monthly Net Generation for Cove Mountain Solar 2
Cove Mountain Solar 2 Details
Summary Information | |
---|---|
Plant Name | Cove Mountain Solar 2 (62470) |
Plant Address | TBD, Beryl, UT 84714 |
Utility | Cove Mountain Solar 2 LLC (62803) |
Latitude, Longitude | 37.6386, -113.6371 |
Generation Dates on File | Jul 2020 to Sep 2024 |
Initial Operation Date | October 2020 |
Annual Generation | 316.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | PacifiCorp (14354) UT |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator GEN01 Details Operating October 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 122 MW |
Summer Capacity | 122 MW |
Winter Capacity | 122 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 2 |
DC Net Capacity | 156.3 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Cove Mountain Solar 2 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#139 | Campo Verde Solar | El Centro, CA | 328.6 GWh |
#140 | Newport Solar Project | Newport, AR | 328.2 GWh |
#141 | CA Flats Solar 150, LLC | Shandon, CA | 327.6 GWh |
#142 | Sparta Solar | Pawnee, TX | 325.6 GWh |
#143 | American Kings Solar, LLC | Lemoore, CA | 325.3 GWh |
#144 | Umbriel Solar | Livington, TX | 320.8 GWh |
#145 | Ganado Solar | Gail, TX | 316.8 GWh |
#146 | Tres Bahias | Port Lavaca, TX | 319.3 GWh |
#147 | Fort Powhatan Solar | Disputanta, VA | 318.0 GWh |
#148 | Chestnut | Lemoore, CA | 322.2 GWh |
#150 | Fighting Jays Solar Project | Needville, TX | 316.4 GWh |
#151 | Lily Solar Hybrid | Scurry, TX | 314.2 GWh |
#152 | BigBeau Solar, LLC | Rosamond, CA | 311.5 GWh |
#153 | Edwards Sanborn E2 | Mojave, CA | 296.4 GWh |
#154 | Sun Streams 2 | Hassayampa, AZ | 311.6 GWh |
#155 | Blythe Solar IV, LLC | Blythe, CA | 302.6 GWh |
#156 | Quitman II Solar | Quitman, GA | 311.0 GWh |
#157 | Maverick Solar 7, LLC | Desert Center, CA | 310.3 GWh |
#158 | Madison Fields Solar Project, LLC | Irwin, OH | 310.1 GWh |
#159 | Drew Solar LLC | Calexico, CA | 307.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cove Mountain Solar 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Appaloosa Solar I | Cedar City, UT | 132.2 GWh | 30.7 mi |
Beryl Solar Plant | Beryl, UT | 6.1 GWh | 0.5 mi |
Cedar Valley Solar Plant | Cedar City, UT | 5.9 GWh | 32.1 mi |
Cove Mountain Solar | Beryl, UT | 156.7 GWh | 1.4 mi |
Enterprise Solar, LLC | Newcastle, UT | 232.7 GWh | 1.4 mi |
Fiddler's Canyon #1 | Cedar City, UT | 6.9 GWh | 22.3 mi |
Fiddler's Canyon #2 | Cedar City, UT | 6.9 GWh | 22.1 mi |
Fiddler's Canyon 3 | Cedar City, UT | 7.3 GWh | 23.9 mi |
Granite Mountain Solar East, LLC | Cedar City, UT | 211.8 GWh | 24.4 mi |
Granite Mountain Solar West, LLC | Cedar City, UT | 128.0 GWh | 20.5 mi |
Hurricane City Power | Hurricane, UT | 3.5 GWh | 36.4 mi |
Iron Springs Solar, LLC | Cedar City, UT | 214.2 GWh | 27.2 mi |
Quail Creek Hydro Plant #1 | Hurricane, UT | 10.2 GWh | 34.9 mi |
Quichapa 1 | Cedar City, UT | 7.6 GWh | 23 mi |
Quichapa 2 | Cedar City, UT | 7.4 GWh | 24.6 mi |
Quichapa 3 | Cedar City, UT | 7.5 GWh | 21.9 mi |
St George Red Rock | St George, UT | 675.0 MWh | 36.5 mi |
Three Peaks Power | Cedar City, UT | 189.5 GWh | 30.3 mi |
Veyo Heat Recovery Project | Gunlock, UT | 45.8 GWh | 21.3 mi |
Washington City Electric Generation | Washington, UT | 4.1 GWh | 35.1 mi |