Covanta Bristol Energy

170 Enterprise Dr, Bristol, CT 6010

Plant Summary Information

Covanta Bristol Energy is ranked #38 out of 59 non-biogenic municipal solid waste power plants nationwide in terms of total annual net electricity generation.

Covanta Bristol Energy is comprised of 1 generator and generated 26.7 GWh during the 3-month period between May 2024 to August 2024.

Plant NameCovanta Bristol Energy
Utility NameCovanta Bristol Inc
LocationNaugatuck Valley Planning Region, CT
Initial Operation DateDecember 1987
Last Update Aug 2024
Annual Generation 109.3 GWh
Annual Consumption 2.4 M MMBtu
Ranked #3,073 out of 11,835 Power Plants Nationwide
Ranked #38 out of 59 NON-Biogenic Municipal Solid Waste Power Plants Nationwide
Ranked #20 out of 156 Connecticut Power Plants
Ranked #3 out of 4 Connecticut NON-Biogenic Municipal Solid Waste Power Plants
Fuel Types Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0%

Map of Covanta Bristol Energy

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Covanta Bristol Energy.

Create Your Account Today

Monthly Net Generation for Covanta Bristol Energy

Covanta Bristol Energy Details

Summary Information
Plant NameCovanta Bristol Energy (50648)
Plant Address170 Enterprise Dr, Bristol, CT 6010
UtilityCovanta Bristol Inc (4474)
Latitude, Longitude41.6492, -72.9153
Generation Dates on FileJan 2001 to Aug 2024
Initial Operation DateDecember 1987
Annual Generation 109.3 GWh
Fuel Types Non-biogenic Municipal Solid Waste : 55.0% Biogenic Municipal Solid Waste : 45.0%
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number85-582-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionNPCC
Balancing AuthorityISO New England Inc. (ISNE)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water SourceMunicipality
Ash Impoundment No
Transmission / Distribution OwnerConnecticut Light & Power Co (4176) CT
Grid Voltage 13.80 kV
Energy StorageNo
 
Natural Gas Information
Pipeline Name Algonquin Gas Transmission Company
Natural Gas StorageNo
Liquefied Natural Gas StorageNo

Generator GEN1 Details Operating December 1987

TechnologyMunicipal Solid Waste
Prime MoverSteam Turbine
OwnershipSingle Owner
Nameplate Capacity16.3 MW
Nameplate Power Factor0.9
Summer Capacity13.2 MW
Winter Capacity13.2 MW
Minimum Load0.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 1987
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceMunicipal Solid Waste / Natural Gas
Startup SourceNatural Gas
Time From Cold Shutdown To Full LoadOVER
Other Planned ModificationsNo
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Covanta Bristol Energy Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Non-biogenic Municipal Solid Waste.

RankPlant NamePlant LocationAnnual Generation
#28Covanta Niagara I, LLCNiagara Falls, NY201.8 GWh
#29Lancaster County Resource RecoveryBrainbridge, PA185.5 GWh
#30Pasco Cnty Solid Waste Resource RecoverySpring Hill, FL183.2 GWh
#31Hillsborough County Resource RecoveryTampa, FL178.9 GWh
#32Camden Resource Recovery FacilityCamden, NJ172.3 GWh
#33Covanta Alexandria/Arlington EnergyAlexandria, VA141.0 GWh
#34Spokane Waste to EnergySpokane, WA130.9 GWh
#35Covanta Babylon IncWest Babylon, NY121.5 GWh
#36Red WingRed Wing, MN121.4 GWh
#37Covanta Southeastern Connecticut CompanyPreston, CT116.9 GWh
#39WilmarthMankato, MN105.6 GWh
#40Wheelabrator LisbonLisbon, CT99.4 GWh
#41Kent County Waste to Energy FacilityGrand Rapids, MI96.5 GWh
#42Wheelabrator Concord FacilityConcord, NH93.6 GWh
#43Harrisburg FacilityHarrisburg, PA93.2 GWh
#44Southeast Resource RecoveryLong Beach, CA89.9 GWh
#45Covanta Stanislaus EnergyCrows Landing, CA89.6 GWh
#46Wheelabrator Gloucester LPWestville, NJ81.5 GWh
#47Covanta Lake County EnergyOkahumpka, FL81.3 GWh
#48Regional Waste SystemsPortland, ME80.9 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Covanta Bristol Energy.

Plant NamePlant LocationAnnual GenerationDistance
Amazon BDL3 Solar ProjectNew Haven, CT1.1 GWh14.2 mi
Bristol Solar One, LLCBristol, CT2.9 GWh4.4 mi
Burlington Solar 1Burlington, CT5.1 GWh5.5 mi
CCSU Co-Gen-STBY GenNew Britain, CT88.2 MWh8.1 mi
CCSU Fuel Cell ProjectNew Britain, CT10.2 GWh8.5 mi
Corbin Russwin Phase 3 BerlinBerlin, CT1.7 GWh9 mi
CP Middletown Solar I LLCMiddletown, CT1.7 GWh12.8 mi
CP Middletown Solar II LLCMiddletown, CT1.7 GWh12.8 mi
FDX010.0 FedEx Fuel CellMiddletown, CT7.1 GWh11.1 mi
Franklin DriveTorrington, CT100.0 MWh14.6 mi
Hartford Hospital CogenerationHartford, CT43.8 GWh14.8 mi
HSCo CHPHartford, CT26.6 GWh14.9 mi
Torrington TerminalTorrington, CT67.0 MWh13.8 mi
Town of Rocky Hill PV CSGRocky Hill, CT4.6 GWh14.6 mi
Trinity College Fuel CellHartford, CT8.9 GWh13.4 mi
Wallingford EnergyWallingford, CT161.3 GWh14.5 mi
Wallingford SolarWallingford, CT21.7 GWh14.9 mi
Waterbury GenerationWaterbury, CT40.1 GWh9.8 mi
Watertown Solar One, LLCWatertown, CT3.0 GWh12.2 mi
Wesleyan University Cogen 1Middletown, CT10.5 GWh15 mi