Coso Power Developers
PO Box 1690, Inyokern, CA 93527Plant Summary Information
Coso Power Developers is ranked #8 out of 63 geothermal power plants nationwide in terms of total annual net electricity generation.
Coso Power Developers is comprised of 3 generators and generated 110.5 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Coso Power Developers |
---|---|
Utility Name | Coso Operating Co LLC |
Location | Inyo County, CA |
Initial Operation Date | November 1989 |
Last Update | Mar 2024 |
Annual Generation | 384.6 GWh |
Annual Consumption | 1.3 M MMBtu |
Ranked #1,630 out of 11,249 Power Plants Nationwide | |
Ranked #8 out of 63 Geothermal Power Plants Nationwide | |
Ranked #125 out of 1,501 California Power Plants | |
Ranked #5 out of 30 California Geothermal Power Plants | |
Fuel Types | Geothermal |
Map of Coso Power Developers
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Coso Power Developers.
Monthly Net Generation for Coso Power Developers
Coso Power Developers Details
Summary Information | |
---|---|
Plant Name | Coso Power Developers (10874) |
Plant Address | PO Box 1690 Inyokern, CA 93527 |
Utility | Coso Operating Co LLC (4397) |
Latitude, Longitude | 36.0192, -117.7917 |
Generation Dates on File | Jan 2001 to Mar 2024 |
Initial Operation Date | November 1989 |
Annual Generation | 384.6 GWh |
Fuel Types | Geothermal |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF86-591-003 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Wells |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator GEN4 Details Operating November 1989
Technology | Geothermal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 30 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 30 MW |
Winter Capacity | 30 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1989 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Geothermal |
Startup Source | Geothermal |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN5 Details Operating December 1989
Technology | Geothermal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 30 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 23.4 MW |
Winter Capacity | 27 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1989 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Geothermal |
Startup Source | Geothermal |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN6 Details Operating December 1989
Technology | Geothermal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 30 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 26.9 MW |
Winter Capacity | 29 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 1989 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Geothermal |
Startup Source | Geothermal |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Coso Power Developers Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Geothermal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Geysers Unit 5-20 | Middletown, CA | 4.8 TWh |
#2 | McGinness Hills | Austin, NV | 733.4 GWh |
#3 | McGinness Hills 3 | Austin, NV | 607.8 GWh |
#4 | Dixie Valley | Fallon, NV | 512.5 GWh |
#5 | Calistoga Power Plant | Middletown, CA | 501.4 GWh |
#6 | Coso Finance Partners | Inyokern, CA | 448.2 GWh |
#7 | John L. Featherstone Plant | Calipatria, CA | 401.7 GWh |
#9 | Elmore Company | Calipatria, CA | 383.8 GWh |
#10 | CE Leathers | Calipatria, CA | 376.5 GWh |
#11 | Del Ranch Company | Calipatria, CA | 374.6 GWh |
#12 | Tungsten Mountain | Fallon, NV | 394.9 GWh |
#13 | Salton Sea Power Gen Co - Unit 4 | Calipatria, CA | 348.1 GWh |
#14 | Salton Sea Power Gen Co - Unit 3 | Calipatria, CA | 326.5 GWh |
#15 | Coso Energy Developers | Inyokern, CA | 313.0 GWh |
#16 | Salton Sea Power LLC - Unit 5 | Calipatria, CA | 305.9 GWh |
#17 | Sonoma California Geothermal | Middletown, CA | 291.4 GWh |
#18 | Geothermal 2 | Middletown, CA | 284.6 GWh |
#19 | Blundell | Milford, UT | 283.5 GWh |
#20 | Vulcan-BN Geothermal Power Company | Calipatria, CA | 273.9 GWh |
#21 | Steamboat Hills LP | Reno, NV | 252.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Coso Power Developers.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Argus Cogen Plant | Trona, CA | 260.4 GWh | 28.8 mi |
Beacon Solar Plant Site 2 | Cantil, CA | 124.7 GWh | 53.3 mi |
Beacon Solar Plant Site 5 | Cantil, CA | 100.9 GWh | 54.9 mi |
Coso Energy Developers | Inyokern, CA | 313.0 GWh | 1.2 mi |
Coso Finance Partners | Inyokern, CA | 448.2 GWh | 1.3 mi |
Cottonwood | Lone Pine, CA | 1.1 GWh | 32.5 mi |
Hecate Energy Beacon Solar 1 | Cantil, CA | 141.9 GWh | 53.3 mi |
Hecate Energy Beacon Solar 3 | Cantil, CA | 145.4 GWh | 54.4 mi |
Hecate Energy Beacon Solar 4 | Cantil, CA | 124.6 GWh | 54.5 mi |
Isabella Hydro Project | Lake Isabella, CA | 2.4 GWh | 46.5 mi |
Kern River 3 | Kernville, CA | 78.9 GWh | 39.8 mi |
Munro Valley Solar | Olancha, CA | 10.3 GWh | 20.4 mi |
Naval Air Weapons Station China Lake | Ridgecrest, CA | 24.6 GWh | 23.7 mi |
North Sky River Energy LLC | Weldon, CA | 424.7 GWh | 51.4 mi |
Owens Valley Solar Project 11 | Olancha, CA | 2.7 GWh | 21.5 mi |
Pine Tree Wind Power Project | Cantil, CA | 133.7 GWh | 57.5 mi |
RE Barren Ridge 1 | Mojave, CA | 176.3 GWh | 58.4 mi |
Sky River Wind Energy Center | Tehachapi, CA | 193.0 GWh | 58.3 mi |
Springbok Solar Farm 1 | Cantil, CA | 319.0 GWh | 54 mi |
Springbok Solar Farm 2 | Cantil, CA | 444.6 GWh | 54.2 mi |