Cortez Solar 2, LLC
23999 Road L.4, Cortez, CO 81321Plant Summary Information
Cortez Solar 2, LLC is ranked #50 out of 142 solar farms in Colorado in terms of total annual net electricity generation.
Cortez Solar 2, LLC generated 2.5 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Cortez Solar 2, LLC |
---|---|
Utility Name | Greenbacker Renewable Energy Corporation |
Location | Montezuma County, CO |
Initial Operation Date | July 2023 |
Last Update | Dec 2023 |
Annual Generation | 5.3 GWh |
Annual Consumption | 18.1 k MMBtu |
Ranked #7,561 out of 11,852 Power Plants Nationwide | |
Ranked #2,727 out of 5,655 Solar Power Plants Nationwide | |
Ranked #157 out of 267 Colorado Power Plants | |
Ranked #50 out of 142 Colorado Solar Power Plants | |
Fuel Types | Solar |
Map of Cortez Solar 2, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cortez Solar 2, LLC.
Monthly Net Generation for Cortez Solar 2, LLC
Cortez Solar 2, LLC Details
Summary Information | |
---|---|
Plant Name | Cortez Solar 2, LLC (66169) |
Plant Address | 23999 Road L.4, Cortez, CO 81321 |
Utility | Greenbacker Renewable Energy Corporation (60025) |
Latitude, Longitude | 37.37829, -108.61494 |
Generation Dates on File | Jul 2023 to Dec 2023 |
Initial Operation Date | July 2023 |
Annual Generation | 5.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF23-1006-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Western Area Power Administration - Rocky Mountain Region (WACM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Empire Electric Assn, Inc (5862) CO |
Grid Voltage | 15.00 kV |
Energy Storage | No |
Generator 710 Details Operating July 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Tilt Angle | 60 |
DC Net Capacity | 6.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Cortez Solar 2, LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2717 | Ghent (NY) | Ghent, NY | 5.3 GWh |
#2718 | California City | California City, CA | 5.3 GWh |
#2719 | Columbus Solar Project | Columbus, NM | 5.3 GWh |
#2720 | Brookwood Drive Community Solar | Westport, MA | 5.3 GWh |
#2721 | West Moore Solar II | Sherman, TX | 5.3 GWh |
#2722 | Gratis Road Solar Facility | Monroe, GA | 5.3 GWh |
#2723 | SEPV Imperial Dixieland East | Imperial, CA | 5.3 GWh |
#2724 | DIA 8 | Denver, CO | 5.3 GWh |
#2725 | Lindstrom Solar CSG | Lindstrom, MN | 5.3 GWh |
#2726 | Malech Solar Farm | San Jose, CA | 5.3 GWh |
#2728 | The City of Vineland at North Vineland | Vineland, NJ | 5.3 GWh |
#2729 | Dept of General Services -FTB | Sacramento, CA | 5.3 GWh |
#2730 | Amazon TUS2 | Tucson, AZ | 5.3 GWh |
#2731 | Kearsarge Amesbury Hybrid | Amesbury, MA | 5.1 GWh |
#2732 | EMWD - Moreno Valley RWRF | Moreno Valley, CA | 5.3 GWh |
#2733 | CF Novel Solar CSG Gardens Seven, LLC | Clear Lake, MN | 5.3 GWh |
#2734 | Franklin 2 | Franklin, MA | 5.3 GWh |
#2735 | O'Fallon Renewable Energy Center | O'Fallon, MO | 5.3 GWh |
#2736 | Barnstable Landfill | Marstons Mills, MA | 5.3 GWh |
#2737 | Kenansville Solar Farm, LLC | Kenansville, NC | 5.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cortez Solar 2, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ames Hydro | Ophir, CO | 7.1 GWh | 52.3 mi |
Bluffview | Farmington, NM | 278.9 GWh | 50.8 mi |
Cortez Solar 1, LLC | Cortez, CO | 5.4 GWh | 5.1 mi |
Cortez Solar 3, LLC | Cortez, CO | 3.9 GWh | 5.5 mi |
Drop 5 | Montrose, CO | 8.9 GWh | 83.4 mi |
Four Corners | Fruitland, NM | 8.0 TWh | 48.1 mi |
Latigo Wind Park | Monticello, UT | 149.3 GWh | 54.2 mi |
McPhee | Cortez, CO | 5.4 GWh | 13.8 mi |
Navajo Dam | Farmington, NM | 91.4 GWh | 67.9 mi |
Red Mesa Solar Project | Red Mesa, UT | 192.9 GWh | 47.3 mi |
Shavano Falls Hydro | Montrose, CO | 10.8 GWh | 83.9 mi |
Shavano Falls Hydro Drop 4 | Montrose, CO | 20.4 GWh | 87 mi |
SMPA Solar 1 Community Solar | Bedrock, CO | 1.8 GWh | 62.5 mi |
South Canal Hydro-1 | Montrose, CO | 16.6 GWh | 89.6 mi |
South Canal Hydro-3 | Montrose, CO | 12.3 GWh | 88.4 mi |
Tacoma | Durango, CO | 957.0 MWh | 46.7 mi |
Towaoc | Cortez, CO | 16.8 GWh | 4.2 mi |
Tri-County Water Hydropower Project | Ridgway, CO | 15.5 GWh | 75.7 mi |
Vallecito Hydroelectric | Bayfield, CO | 25.7 GWh | 56.9 mi |
Williams Ignacio Natural Gas Plant | Durango, CO | 47.9 GWh | 48.4 mi |