Correctional Solar LLC
5500 Mt. Nebo Road, Barhamsville, VA 23011Plant Summary Information
Correctional Solar LLC is ranked #57 out of 94 solar farms in Virginia in terms of total annual net electricity generation.
Correctional Solar LLC generated 5.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Correctional Solar LLC |
---|---|
Utility Name | Dominion Renewable Energy |
Location | New Kent County, VA |
Initial Operation Date | December 2017 |
Last Update | Dec 2023 |
Annual Generation | 30.1 GWh |
Annual Consumption | 107.2 k MMBtu |
Ranked #4,541 out of 11,835 Power Plants Nationwide | |
Ranked #992 out of 5,643 Solar Power Plants Nationwide | |
Ranked #113 out of 211 Virginia Power Plants | |
Ranked #57 out of 94 Virginia Solar Power Plants | |
Fuel Types | Solar |
Map of Correctional Solar LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Correctional Solar LLC.
Monthly Net Generation for Correctional Solar LLC
Correctional Solar LLC Details
Summary Information | |
---|---|
Plant Name | Correctional Solar LLC (60915) |
Plant Address | 5500 Mt. Nebo Road, Barhamsville, VA 23011 |
Utility | Dominion Renewable Energy (58468) |
Latitude, Longitude | 37.47146, -76.84461 |
Generation Dates on File | Dec 2017 to Dec 2023 |
Initial Operation Date | December 2017 |
Annual Generation | 30.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 17-1376-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator PV1 Details Operating December 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 20 MW |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 22.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Correctional Solar LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#982 | Woodmere Solar Farm | Edison, CA | 31.0 GWh |
#983 | North Stonington Solar Center, LLC | North Stonington, CT | 30.9 GWh |
#984 | Williamston Speight Solar, LLC | Williamston, NC | 30.9 GWh |
#985 | Saddle Mountain Solar I | Tonopah, AZ | 30.9 GWh |
#986 | Hecate Energy Cherrydale LLC | Cape Charles, VA | 30.6 GWh |
#987 | Maryland Solar | Hagerstown, MD | 30.6 GWh |
#988 | Caden Energix Pamplin LLC | Appomattox, VA | 30.6 GWh |
#989 | Riverhead Solar Farm | Calverton, NY | 30.4 GWh |
#990 | Apple Data Center PV3 | Conover, NC | 30.3 GWh |
#991 | Hyder II Hybrid | Hyder, AZ | 30.3 GWh |
#993 | Woodland Solar Farm | Smithfield, VA | 30.0 GWh |
#994 | Desert Star Hybrid | Buckeye, AZ | 30.0 GWh |
#995 | North 301 Solar | Enfield, NC | 30.0 GWh |
#996 | Tropico Solar PV Plant | Delano, CA | 30.0 GWh |
#997 | RE Adams East, LLC | Fresno, CA | 29.9 GWh |
#998 | Hollyfield | Manquin, VA | 29.8 GWh |
#999 | Wister Solar | Niland, CA | 29.7 GWh |
#1000 | Lanikuhana Solar LLC | Mililani, HI | 29.6 GWh |
#1001 | Morelos del Sol | Lost Hills, CA | 29.5 GWh |
#1002 | Baker City Solar | Baker City, OR | 29.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Correctional Solar LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Briel Solar Farm | Standston, VA | 41.8 GWh | 23.2 mi |
Carvers Creek Solar | Gloucester, VA | 6.9 GWh | 14.5 mi |
Charles City | Providence Forge, VA | 54.0 GWh | 15.7 mi |
Colonial Trail West | Spring Grove, VA | 282.3 GWh | 23.2 mi |
Energix Hollyfield, LLC | Manquin, VA | 25.5 GWh | 22.5 mi |
Essex Solar Center | Dunnsville, VA | 35.2 GWh | 25.2 mi |
Fort Powhatan Solar | Disputanta, VA | 320.2 GWh | 19.5 mi |
Gloucester Solar | Gloucester, VA | 37.5 GWh | 21.7 mi |
Gravel Neck | Surry, VA | 89.3 GWh | 23.3 mi |
Hollyfield | Manquin, VA | 29.8 GWh | 22.6 mi |
King & Queen | Little Plymouth, VA | 53.8 GWh | 14.6 mi |
Mechanicsville Solar | Mechanicsville, VA | 53.1 GWh | 24 mi |
Norge Solar Farm | Williamsburg, VA | 1.9 GWh | 8.2 mi |
Puller Solar | Topping, VA | 27.7 GWh | 21.8 mi |
Rochambeau Solar | Williamsburg, VA | 33.6 GWh | 9.6 mi |
Skipjack Solar Center | Wayside, VA | 353.6 GWh | 17.4 mi |
Spring Grove I | Spring Grove, VA | 155.4 GWh | 21 mi |
Surry | Surry, VA | 13.8 TWh | 22.6 mi |
Waste Management Middle Peninsula LFGTE | Glenns, VA | 50.0 GWh | 12.5 mi |
WestRock-West Point Mill | West Point, VA | 525.4 GWh | 5.2 mi |