Corazon Energy LLC
TBD, Rachito Las Lomas, TX 78043Plant Summary Information
Corazon Energy LLC is ranked #56 out of 170 solar farms in Texas in terms of total annual net electricity generation.
Corazon Energy LLC generated 111.9 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Corazon Energy LLC |
---|---|
Utility Name | Corazon Energy LLC |
Location | Webb County, TX |
Initial Operation Date | August 2021 |
Last Update | Oct 2024 |
Annual Generation | 277.3 GWh |
Annual Consumption | 1.0 M MMBtu |
Ranked #1,927 out of 11,866 Power Plants Nationwide | |
Ranked #187 out of 5,672 Solar Power Plants Nationwide | |
Ranked #349 out of 758 Texas Power Plants | |
Ranked #56 out of 170 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Corazon Energy LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Corazon Energy LLC.
Monthly Net Generation for Corazon Energy LLC
Corazon Energy LLC Details
Summary Information | |
---|---|
Plant Name | Corazon Energy LLC (64538) |
Plant Address | TBD, Rachito Las Lomas, TX 78043 |
Utility | Corazon Energy LLC (64167) |
Latitude, Longitude | 27.63468, -99.25833 |
Generation Dates on File | Jun 2021 to Oct 2024 |
Initial Operation Date | August 2021 |
Annual Generation | 277.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator KOV4A Details Operating August 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Lenses Mirrors | No |
---|---|
Single Axis Tracking | Yes |
Dual Axis Tracking | No |
Tilt Angle | 52 |
DC Net Capacity | 265 MW |
Crystalline Silicon | Yes |
Thin Film CDTE | No |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Corazon Energy LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#177 | Wistaria Ranch Solar | Calexico, CA | 291.0 GWh |
#178 | Valentine Solar, LLC | Rosamond, CA | 289.8 GWh |
#179 | Harry Allen Solar Energy LLC | Apex, NV | 289.6 GWh |
#180 | BPL Files Solar | Itasca, TX | 284.8 GWh |
#181 | ANSON Solar Center, LLC | Anson, TX | 282.5 GWh |
#182 | Colonial Trail West | Spring Grove, VA | 282.1 GWh |
#183 | Rancho Seco Solar II, LLC | Twin Cities, CA | 281.3 GWh |
#184 | Emerald Grove | Crane, TX | 280.4 GWh |
#185 | Panoche Valley Solar Farm | Paicines, CA | 277.5 GWh |
#186 | Wood County | Nekoosa, WI | 277.4 GWh |
#188 | Imperial Solar Energy Center South | Calexico, CA | 277.2 GWh |
#189 | Upton County Solar | McCamey, TX | 276.0 GWh |
#190 | Mesquite Solar 2, LLC | Tonopah, AZ | 275.1 GWh |
#191 | East Blackland Solar Project 1 | Manor, TX | 275.1 GWh |
#192 | West Line Solar, LLC | City of Eloy, AZ | 273.5 GWh |
#193 | Boulder Solar Power, LLC | Boulder City, NV | 270.7 GWh |
#194 | Elm Branch Solar 1 | Bardwell, TX | 270.3 GWh |
#195 | Oberon IA | Odessa, TX | 269.9 GWh |
#196 | Bellflower Solar 1 | Lewisville, IN | 266.9 GWh |
#197 | Hunter Solar LLC (UT) | Clawson, UT | 266.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Corazon Energy LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alexis Solar, LLC | Encino, TX | 17.4 GWh | 81.3 mi |
Cedro Hill Wind LLC | Bruni, TX | 451.1 GWh | 22 mi |
Elara Solar | Pearsall, TX | 239.1 GWh | 86.4 mi |
Falcon Dam & Power | Falcon Heights, TX | 30.6 GWh | 74.7 mi |
HEB00095 | Laredo, TX | 432.0 MWh | 13.3 mi |
Javelina Wind Energy II, LLC | MIRANDO, TX | 727.9 GWh | 25.2 mi |
Javelina Wind Energy, LLC | Mirando City, TX | 794.1 GWh | 26.9 mi |
Laredo | Laredo, TX | 42.1 GWh | 16 mi |
Las Lomas Wind Project | Falcon, TX | 502.9 GWh | 65.9 mi |
Mars Solar | Bruni, TX | 23.0 GWh | 29.8 mi |
Mesteno | Rio Grande City, TX | 422.4 GWh | 83 mi |
Reloj del Sol Wind Farm | San Ygnacio, TX | 255.1 GWh | 42.5 mi |
Rio Bravo Windpower, LLC | Roma, TX | 326.8 GWh | 69.4 mi |
Sendero | Hebbronville, TX | 272.5 GWh | 37.8 mi |
Shakes Solar | Carrizo Springs, TX | 404.0 GWh | 63.5 mi |
Torrecillas Wind Energy, LLC | Bruni, TX | 868.3 GWh | 28.4 mi |
WAL3518 | Laredo, TX | 393.0 MWh | 13.2 mi |
WAL5713 | Laredo, TX | 409.0 MWh | 12.6 mi |
WAL791 | Alice, TX | 409.0 MWh | 74.9 mi |
Whitetail | Oilton, TX | 166.7 GWh | 18.5 mi |