Copper Mountain Solar 4, LLC
659 Eldorado Valley Drive, Boulder City, NV 89005Plant Summary Information
Copper Mountain Solar 4, LLC is ranked #42 out of 109 power plants in Nevada in terms of total annual net electricity generation.
Copper Mountain Solar 4, LLC generated 51.5 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Copper Mountain Solar 4, LLC |
---|---|
Utility Name | Consolidated Edison Development Inc. |
Location | Clark County, NV |
Initial Operation Date | September 2016 |
Last Update | Dec 2023 |
Annual Generation | 214.2 GWh |
Annual Consumption | 766.2 k MMBtu |
Ranked #2,227 out of 11,835 Power Plants Nationwide | |
Ranked #243 out of 5,643 Solar Power Plants Nationwide | |
Ranked #42 out of 109 Nevada Power Plants | |
Ranked #19 out of 60 Nevada Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Copper Mountain Solar 4, LLC (2014 to 2017) Consolidated Edison Development Inc. (2018 to 2023) |
Map of Copper Mountain Solar 4, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Copper Mountain Solar 4, LLC.
Monthly Net Generation for Copper Mountain Solar 4, LLC
Copper Mountain Solar 4, LLC Details
Summary Information | |
---|---|
Plant Name | Copper Mountain Solar 4, LLC (59814) |
Plant Address | 659 Eldorado Valley Drive, Boulder City, NV 89005 |
Utility | Consolidated Edison Development Inc. (56769) |
Latitude, Longitude | 35.78222, -114.97538 |
Generation Dates on File | Sep 2016 to Dec 2023 |
Initial Operation Date | September 2016 |
Annual Generation | 214.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 16-76 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator PV01 Details Operating October 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 51.8 MW |
Summer Capacity | 51.8 MW |
Winter Capacity | 51.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Tilt Angle | 52 |
DC Net Capacity | 69.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator PV02 Details Operating September 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 41.8 MW |
Summer Capacity | 41.8 MW |
Winter Capacity | 41.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Tilt Angle | 52 |
DC Net Capacity | 56 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Copper Mountain Solar 4, LLC Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#233 | SR Lumpkin | Lumpkin, GA | 232.0 GWh |
#234 | Maverick Solar 4, LLC | Desert Center, CA | 231.3 GWh |
#235 | CA Flats Solar 130, LLC | Shandon, CA | 230.4 GWh |
#236 | Dressor Plains Solar, LLC | Herrick, IL | 230.4 GWh |
#237 | Enterprise Solar, LLC | Newcastle, UT | 230.1 GWh |
#238 | Lockhart Solar PV, LLC | Hinkley, CA | 219.8 GWh |
#239 | Ivanpah 1 | Nipton, CA | 230.3 GWh |
#240 | Wapello Solar LLC | Wapello, IA | 219.2 GWh |
#241 | Black Bear Solar 1 | Montgomery, AL | 218.6 GWh |
#242 | Albemarle Beach Solar | Roper, NC | 217.5 GWh |
#244 | Iron Springs Solar, LLC | Cedar City, UT | 214.0 GWh |
#245 | Butler Solar Project 103 | Butler, GA | 213.9 GWh |
#246 | Quinto Solar PV Project | Gustine, CA | 213.5 GWh |
#247 | Escalante Solar II, LLC | Milford, UT | 212.9 GWh |
#248 | Assembly Solar II LLC | Lennon, MI | 212.7 GWh |
#249 | Escalante Solar I, LLC | Milford, UT | 212.6 GWh |
#250 | Granite Mountain Solar East, LLC | Cedar City, UT | 211.2 GWh |
#251 | Chicot Solar | Lake Village, AR | 210.7 GWh |
#252 | Escalante Solar III, LLC | Milford, UT | 209.7 GWh |
#253 | Cutlass Solar 1 LLC | Richmond, TX | 209.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Copper Mountain Solar 4, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Boulder Solar II, LLC | Boulder City, NV | 124.4 GWh | 5 mi |
CM10 | Boulder City, NV | 19.2 GWh | 1.1 mi |
CM48 | Boulder City, NV | 93.3 GWh | 1 mi |
Copper Mountain Solar 2 | Boulder City, NV | 348.7 GWh | 0.8 mi |
Copper Mountain Solar 3 | Boulder City, NV | 610.5 GWh | 7.5 mi |
Copper Mountain Solar 5, LLC | Boulder City, NV | 685.2 GWh | 0.4 mi |
Desert Star Energy Center | Boulder City, NV | 1.2 TWh | 1.1 mi |
Dignity - Siena Campus | Henderson, NV | 2.9 GWh | 17.2 mi |
Hoover Dam (AZ) | Boulder City, AZ | 1.5 TWh | 20.9 mi |
Hoover Dam (NV) | Boulder City, NV | 1.4 TWh | 20.9 mi |
IGS LAS1 | Henderson, NV | 1.0 GWh | 16 mi |
Nevada Solar One | Boulder City, NV | 94.1 GWh | 1.3 mi |
River Mountains Solar | Henderson, NV | 28.9 GWh | 17.4 mi |
Saguaro Power | Henderson, NV | 210.4 GWh | 18 mi |
Techren Solar I LLC | Boulder, NV | 196.8 GWh | 4.8 mi |
Techren Solar II LLC | Boulder, NV | 515.8 GWh | 6 mi |
Techren Solar III LLC | Boulder, NV | 59.4 GWh | 4.3 mi |
Techren Solar IV LLC | Boulder, NV | 58.5 GWh | 7.9 mi |
Techren Solar V | Boulder, NV | 118.5 GWh | 8.6 mi |
Townsite Solar Project Hybrid | Boulder City, NV | 444.2 GWh | 11.9 mi |