Copper Mountain Solar 3
15301 Hwy US 95 South, Boulder City, NV 89006Plant Summary Information
Copper Mountain Solar 3 is ranked #24 out of 5,158 solar farms nationwide in terms of total annual net electricity generation.
Copper Mountain Solar 3 generated 157.8 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Copper Mountain Solar 3 |
---|---|
Utility Name | Consolidated Edison Development Inc. |
Location | Clark County, NV |
Initial Operation Date | May 2014 |
Last Update | Mar 2024 |
Annual Generation | 647.5 GWh |
Annual Consumption | 2.2 M MMBtu |
Ranked #1,087 out of 11,249 Power Plants Nationwide | |
Ranked #24 out of 5,158 Solar Power Plants Nationwide | |
Ranked #16 out of 104 Nevada Power Plants | |
Ranked #5 out of 54 Nevada Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Copper Mountain Solar 3, LLC (2013 to 2017) Consolidated Edison Development Inc. (2018 to 2022) |
Map of Copper Mountain Solar 3
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Copper Mountain Solar 3.
Monthly Net Generation for Copper Mountain Solar 3
Copper Mountain Solar 3 Details
Summary Information | |
---|---|
Plant Name | Copper Mountain Solar 3 (58915) |
Plant Address | 15301 Hwy US 95 South Boulder City, NV 89006 |
Utility | Consolidated Edison Development Inc. (56769) |
Latitude, Longitude | 35.88942, -114.95791 |
Generation Dates on File | May 2014 to Mar 2024 |
Initial Operation Date | May 2014 |
Annual Generation | 647.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 14-32 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
Grid Voltage | 525.00 kV |
Energy Storage | No |
Generator 6 Details Operating October 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 26 MW |
Summer Capacity | 26 MW |
Winter Capacity | 26 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 16 |
DC Net Capacity | 32 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 7 Details Operating October 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 26 MW |
Summer Capacity | 26 MW |
Winter Capacity | 26 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 16 |
DC Net Capacity | 32 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 8 Details Operating December 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 26 MW |
Summer Capacity | 26 MW |
Winter Capacity | 26 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 16 |
DC Net Capacity | 32 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 1 Details Operating May 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 26 MW |
Summer Capacity | 26 MW |
Winter Capacity | 26 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 16 |
DC Net Capacity | 31.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 2 Details Operating June 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 27 MW |
Summer Capacity | 27 MW |
Winter Capacity | 27 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 16 |
DC Net Capacity | 32.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 3 Details Operating July 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 26 MW |
Summer Capacity | 26 MW |
Winter Capacity | 26 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 16 |
DC Net Capacity | 31.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 4 Details Operating August 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 28 MW |
Summer Capacity | 28 MW |
Winter Capacity | 28 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 16 |
DC Net Capacity | 34 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 5 Details Operating September 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 25 MW |
Summer Capacity | 25 MW |
Winter Capacity | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2014 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 16 |
DC Net Capacity | 30.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 10 Details Operating January 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 21 MW |
Summer Capacity | 21 MW |
Winter Capacity | 21 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2015 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 16 |
DC Net Capacity | 25.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 9 Details Operating January 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 24 MW |
Summer Capacity | 24 MW |
Winter Capacity | 24 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2015 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 16 |
DC Net Capacity | 29.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Copper Mountain Solar 3 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#14 | Athos Solar Project | Desert Center, CA | 705.9 GWh |
#15 | Titan Solar Project | Van Horn, TX | 703.1 GWh |
#16 | Silver State Solar Power South | Primm Valley, NV | 700.7 GWh |
#17 | McCoy Solar Energy Project Hybrid | Blythe, CA | 669.5 GWh |
#18 | IP Radian, LLC | Brookesmith, TX | 682.5 GWh |
#19 | Arrow Canyon Solar Hybrid | Moapa, NV | 673.6 GWh |
#20 | Mount Signal Solar Farm V | Calexico, CA | 668.7 GWh |
#21 | Genesis Solar Energy Project | Blythe, CA | 653.5 GWh |
#22 | Mojave Solar Project | Hinkley, CA | 651.4 GWh |
#23 | Stateline Solar | Nipton, CA | 649.1 GWh |
#25 | Noble Solar | Krum, TX | 636.9 GWh |
#26 | Moapa Southern Paiute | Moapa, NV | 634.9 GWh |
#27 | Aktina Solar | El Campo, TX | 625.8 GWh |
#28 | Blythe Mesa Solar II | Blythe, CA | 604.9 GWh |
#29 | AV Solar Ranch One | Lancaster, CA | 618.2 GWh |
#30 | Galloway 1 Solar Farm | Paint Rock, TX | 611.0 GWh |
#31 | Sun Valley Solar Project | Abbott, TX | 597.6 GWh |
#32 | Bighorn Solar 1 | Pueblo, CO | 594.3 GWh |
#33 | Great Valley Solar Portfolio Holdings, LLC | Cantua Creek, CA | 593.0 GWh |
#34 | Azure Sky Solar | Haskell, TX | 586.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Copper Mountain Solar 3.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Boulder Solar II, LLC | Boulder City, NV | 135.6 GWh | 2.8 mi |
Clark (NVE) | Las Vegas, NV | 643.7 GWh | 14.6 mi |
CM10 | Boulder City, NV | 19.8 GWh | 7.3 mi |
CM48 | Boulder City, NV | 102.4 GWh | 7.7 mi |
Copper Mountain Solar 2 | Boulder City, NV | 381.0 GWh | 7.1 mi |
Copper Mountain Solar 4, LLC | Boulder City, NV | 249.7 GWh | 7.5 mi |
Copper Mountain Solar 5, LLC | Boulder City, NV | 721.6 GWh | 7.9 mi |
Desert Star Energy Center | Boulder City, NV | 1.9 TWh | 7.2 mi |
Dignity - Siena Campus | Henderson, NV | 3.0 GWh | 11.9 mi |
Hoover Dam (AZ) | Boulder City, AZ | 1.6 TWh | 15.1 mi |
Hoover Dam (NV) | Boulder City, NV | 1.3 TWh | 15.1 mi |
Nevada Solar One | Boulder City, NV | 98.0 GWh | 6.3 mi |
River Mountains Solar | Henderson, NV | 24.6 GWh | 10 mi |
Saguaro Power | Henderson, NV | 209.1 GWh | 10.9 mi |
Techren Solar I LLC | Boulder, NV | 208.9 GWh | 2.8 mi |
Techren Solar II LLC | Boulder, NV | 574.3 GWh | 1.5 mi |
Techren Solar III LLC | Boulder, NV | 60.4 GWh | 3.2 mi |
Techren Solar IV LLC | Boulder, NV | 64.7 GWh | 1.2 mi |
Techren Solar V | Boulder, NV | 131.7 GWh | 1.9 mi |
Townsite Solar Project Hybrid | Boulder City, NV | 455.1 GWh | 5.3 mi |