Cooperative Solar One
4775 Lexington Road, Winchester, KY 40391Plant Summary Information
Cooperative Solar One is ranked #36 out of 54 power plants in Kentucky in terms of total annual net electricity generation.
Cooperative Solar One generated 2.6 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Cooperative Solar One |
---|---|
Utility Name | East Kentucky Power Coop, Inc |
Location | Clark County, KY |
Initial Operation Date | November 2017 |
Last Update | Dec 2023 |
Annual Generation | 13.1 GWh |
Annual Consumption | 46.4 k MMBtu |
Ranked #5,540 out of 11,852 Power Plants Nationwide | |
Ranked #1,358 out of 5,655 Solar Power Plants Nationwide | |
Ranked #36 out of 54 Kentucky Power Plants | |
Ranked #4 out of 11 Kentucky Solar Power Plants | |
Fuel Types | Solar |
Map of Cooperative Solar One
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cooperative Solar One.
Monthly Net Generation for Cooperative Solar One
Cooperative Solar One Details
Summary Information | |
---|---|
Plant Name | Cooperative Solar One (60863) |
Plant Address | 4775 Lexington Road, Winchester, KY 40391 |
Utility | East Kentucky Power Coop, Inc (5580) |
Latitude, Longitude | 38.02724, -84.25473 |
Generation Dates on File | Nov 2017 to Dec 2023 |
Initial Operation Date | November 2017 |
Annual Generation | 13.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Kentucky Utilities Co (10171) KY |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator PV1 Details Operating November 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 8.5 MW |
Summer Capacity | 8.5 MW |
Winter Capacity | 8.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 10.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Cooperative Solar One Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1348 | Delta Solar Power I | Grand Ledge, MI | 13.3 GWh |
#1349 | Richmond Solar Site 2 | Richmond, IN | 13.3 GWh |
#1350 | McCullough Road Solar Farm | Washington Township, NJ | 13.3 GWh |
#1351 | Rancho Seco Solar, LLC | Herald, CA | 13.3 GWh |
#1352 | Quakertown Solar Farm, LLC | Franklin Twp. / Pitts, NJ | 13.2 GWh |
#1353 | Grove Solar | New Bern, NC | 13.2 GWh |
#1354 | GDIM 1, LLC | North Smithfield, RI | 13.2 GWh |
#1355 | Hodag Solar | Rhinelander, WI | 13.2 GWh |
#1356 | Tequesquite Landfill Solar PV Project | Riverside, CA | 13.2 GWh |
#1357 | Carvers Creek Solar | Gloucester, VA | 13.2 GWh |
#1359 | Lake Herman | Benicia, CA | 13.1 GWh |
#1360 | Danville | Danville, VA | 13.1 GWh |
#1361 | Pemberton Road I | Pemberton, NJ | 13.1 GWh |
#1362 | Denmark Solar | Denmark, SC | 13.1 GWh |
#1363 | Connexus Solar Stanford 1STF | St. Francis, MN | 13.0 GWh |
#1364 | Pemberton Road II | Pemberton, NJ | 13.0 GWh |
#1365 | Richmond Solar Park 4 | Richmond, IN | 12.9 GWh |
#1366 | Baker Point | Thurmont, MD | 12.9 GWh |
#1367 | Rock Solid | Howell, NJ | 12.8 GWh |
#1368 | 59 Federal Rd(CSG) | Carver, MA | 12.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cooperative Solar One.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bavarian LFGTE | Walton, KY | 27.9 GWh | 61.5 mi |
Blue Ridge Generating | Irvine, KY | 3.9 GWh | 24.5 mi |
Brown County LFGTE Power Station | Georgetown, OH | 27.0 GWh | 62.9 mi |
Crittenden Solar Facility | Dry Ridge, KY | 4.5 GWh | 53.7 mi |
Dix Dam | Harrodsburg, KY | 44.0 GWh | 29.6 mi |
E W Brown | Harrodsburg, KY | 1.4 TWh | 29.9 mi |
Green City Recovery, LLC | Georgetown, KY | 1.7 GWh | 27.2 mi |
H L Spurlock | Maysville, KY | 7.8 TWh | 52.2 mi |
J K Smith | Winchester, KY | 641.4 GWh | 13 mi |
LGE-KU Solar Share Facility Simpsonville | Simpsonville, KY | 1.0 MWh | 63.2 mi |
Matilda Hamilton Fee Hydroelectric Station | Ravenna, KY | 5.3 GWh | 29.4 mi |
Meldahl Hydroelectric Project | Foster, KY | 539.3 GWh | 53 mi |
Morehead Generating Facility | Morehead, KY | 3.9 GWh | 40.3 mi |
Mother Ann Lee | Harrodsburg, KY | 6.2 GWh | 29 mi |
Nestlewood Solar | Hamersville, OH | 116.0 GWh | 63.4 mi |
Paris (KY) | Paris, KY | 337.1 MWh | 12.3 mi |
Pendleton County LFGTE | Butler, KY | 23.1 GWh | 49.5 mi |
SR Turkey Creek, LLC | Lancaster, KY | 106.7 GWh | 34.5 mi |
Walton 1 Solar Facility | Walton, KY | 2.9 GWh | 59.7 mi |
Walton 2 Solar Facility | Walton, KY | 3.1 GWh | 59.7 mi |