Coolidge Generation Station
859 E. Randolph Rd., Coolidge, AZ 85228Plant Summary Information
Coolidge Generation Station is ranked #31 out of 150 power plants in Arizona in terms of total annual net electricity generation.
Coolidge Generation Station is comprised of 12 generators and generated 84.8 GWh during the 3-month period between November 2023 to February 2024.
Plant Name | Coolidge Generation Station |
---|---|
Utility Name | Salt River Project |
Location | Pinal County, AZ |
Initial Operation Date | May 2011 |
Last Update | Feb 2024 |
Annual Generation | 452.6 GWh |
Annual Consumption | 4.7 M MMBtu |
Ranked #1,442 out of 11,249 Power Plants Nationwide | |
Ranked #574 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #31 out of 150 Arizona Power Plants | |
Ranked #20 out of 33 Arizona Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
Coolidge Power LLC (2013 to 2018) Salt River Project (2019 to 2022) |
Map of Coolidge Generation Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Coolidge Generation Station.
Monthly Net Generation for Coolidge Generation Station
Coolidge Generation Station Details
Summary Information | |
---|---|
Plant Name | Coolidge Generation Station (56948) |
Plant Address | 859 E. Randolph Rd. Coolidge, AZ 85228 |
Utility | Salt River Project (16572) |
Latitude, Longitude | 32.9174, -111.50333 |
Generation Dates on File | May 2011 to Feb 2024 |
Initial Operation Date | May 2011 |
Annual Generation | 452.6 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Salt River Project (SRP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Salt River Project (16572) AZ |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
TRANSWESTERN PIPELINE COMPANY EL PASO NATURAL GAS COMPANY LLC |
Natural Gas Storage | No |
Generator 1 Details OA May 2011
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 43.4 MW |
Winter Capacity | 47.7 MW |
Minimum Load | 22 MW |
Uprate/Derate Completed | No |
Status | OA |
First Operation Date | May 2011 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 10 Details Operating May 2011
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 43.4 MW |
Winter Capacity | 47.7 MW |
Minimum Load | 22 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 11 Details Operating May 2011
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 43.4 MW |
Winter Capacity | 47.7 MW |
Minimum Load | 22 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 12 Details Operating May 2011
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 43.4 MW |
Winter Capacity | 47.7 MW |
Minimum Load | 22 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating May 2011
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 43.4 MW |
Winter Capacity | 47.7 MW |
Minimum Load | 22 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating May 2011
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 43.4 MW |
Winter Capacity | 47.7 MW |
Minimum Load | 22 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4 Details Operating May 2011
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 43.4 MW |
Winter Capacity | 47.7 MW |
Minimum Load | 22 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 5 Details Operating May 2011
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 43.4 MW |
Winter Capacity | 47.7 MW |
Minimum Load | 22 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 6 Details Operating May 2011
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 43.4 MW |
Winter Capacity | 47.7 MW |
Minimum Load | 22 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 7 Details Operating May 2011
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 43.4 MW |
Winter Capacity | 47.7 MW |
Minimum Load | 22 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 8 Details Operating May 2011
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 43.4 MW |
Winter Capacity | 47.7 MW |
Minimum Load | 22 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 9 Details Operating May 2011
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 43.4 MW |
Winter Capacity | 47.7 MW |
Minimum Load | 22 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Coolidge Generation Station Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#564 | South Belridge Cogeneration Facility | McKittrick, CA | 479.9 GWh |
#565 | Pensacola Florida Plant | Cantonment, FL | 478.3 GWh |
#566 | Lake Hubbard | Sunnyvale, TX | 562.9 GWh |
#567 | Nikiski Combined Cycle | Nikiski, AK | 473.1 GWh |
#568 | Bethpage Power Plant | Hicksville, NY | 472.2 GWh |
#569 | R W Miller | Palo Pinto, TX | 486.2 GWh |
#570 | Cheyenne Prairie Generating Station | Cheyenne, WY | 467.0 GWh |
#571 | NAFTA Region Olefins Complex Cogen Fac | Port Arthur, TX | 458.1 GWh |
#572 | Sewell Creek Energy | Cedartown, GA | 455.2 GWh |
#573 | Aurora | Aurora, IL | 452.9 GWh |
#575 | Cherokee County Cogen | Gaffney, SC | 450.0 GWh |
#576 | HO Clarke Generating | Houston, TX | 444.7 GWh |
#577 | West Campus Cogeneration Facility | Madison, WI | 443.0 GWh |
#578 | Fort Churchill | Yerington, NV | 440.9 GWh |
#579 | Bluffview | Farmington, NM | 436.9 GWh |
#580 | Blue Spruce Energy Center | Aurora, CO | 444.2 GWh |
#581 | Androscoggin Energy Center | Jay, ME | 434.5 GWh |
#582 | Beatrice | Beatrice, NE | 427.6 GWh |
#583 | Humboldt Bay | Eureka, CA | 428.6 GWh |
#584 | Walnut Creek Energy Park | Industry, CA | 420.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Coolidge Generation Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bonnybrooke PV | Florence, AZ | 141.1 GWh | 13.3 mi |
Central Line Solar, LLC | Coolidge, AZ | 278.4 GWh | 6.9 mi |
Desert Basin | Casa Grande, AZ | 3.6 TWh | 16.6 mi |
East Line Solar | Coolidge, AZ | 266.5 GWh | 6 mi |
Intel - Ocotillo Campus Solar | Chandler, AZ | 9.6 GWh | 31.8 mi |
Mesa Carport PV | Mesa, AZ | 8.8 GWh | 30.2 mi |
Pinal Central Energy Center Hybrid | Casa Grande, AZ | 57.9 GWh | 4 mi |
Poseidon Solar, LLC | Globe, AZ | 54.7 GWh | 16.8 mi |
Queen Creek Solar Farm | Queen Creek, AZ | 46.3 GWh | 25 mi |
Red Rock | Red Rock, AZ | 41.9 GWh | 28.2 mi |
Saguaro | Red Rock, AZ | 89.1 GWh | 27.9 mi |
Saint Solar | Coolidge, AZ | 285.0 GWh | 3.5 mi |
Sandstone Solar | Florence, AZ | 122.0 GWh | 9.2 mi |
Santan | Gilbert, AZ | 6.5 TWh | 32 mi |
Storey Solar and Storage | Coolidge, AZ | 59.3 GWh | 2 mi |
Sundance | Casa Grande, AZ | 573.7 GWh | 5.1 mi |
Union HS at Casa Grande | Casa Grande, AZ | 3.0 GWh | 13.7 mi |
Vista Grande HS at Casa Grande | Casa Grande, AZ | 2.9 GWh | 12.3 mi |
Walmart Casa Grande | Casa Grande, AZ | 2.5 GWh | 16 mi |
West Line Solar, LLC | City of Eloy, AZ | 294.8 GWh | 11.6 mi |