Conowingo
2569 Shures Landing Rd., Darlington, MD 21034Plant Summary Information
Conowingo is ranked #21 out of 1,371 hydroelectric power plants nationwide in terms of total annual net electricity generation.
Conowingo is comprised of 11 generators and generated 257.5 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Conowingo |
---|---|
Utility Name | Constellation Power, Inc |
Location | Harford County, MD |
Initial Operation Date | March 1928 |
Last Update | Sep 2024 |
Annual Generation | 2.0 TWh |
Annual Consumption | 7.3 M MMBtu |
Ranked #514 out of 11,852 Power Plants Nationwide | |
Ranked #21 out of 1,371 Water Power Plants Nationwide | |
Ranked #5 out of 179 Maryland Power Plants | |
Ranked #1 out of 2 Maryland Water Power Plants | |
Fuel Types | Water |
Previous Operator |
Exelon Power (2013 to 2021) Constellation Power, Inc (2022 to 2023) |
Map of Conowingo
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Conowingo.
Monthly Net Generation for Conowingo
Conowingo Details
Summary Information | |
---|---|
Plant Name | Conowingo (1574) |
Plant Address | 2569 Shures Landing Rd., Darlington, MD 21034 |
Utility | Constellation Power, Inc (6035) |
Latitude, Longitude | 39.6572, -76.1752 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | March 1928 |
Annual Generation | 2.0 TWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Susquehanna River |
Ash Impoundment | No |
Transmission / Distribution Owner | PECO Energy Co (14940) PA |
Grid Voltage | 220.00 kV |
Energy Storage | No |
Generator 1 Details Operating March 1928
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CONOWING13 KV GEN1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONOWING13 KV GEN1 |
Nameplate Capacity | 45 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 41 MW |
Winter Capacity | 48 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 1928 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 2 Details Operating March 1928
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CONOWING13 KV GEN2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONOWING13 KV GEN2 |
Nameplate Capacity | 36 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 32.7 MW |
Winter Capacity | 36 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 1928 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 3 Details Operating March 1928
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CONOWING13 KV GEN3 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONOWING13 KV GEN3 |
Nameplate Capacity | 48 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 41.9 MW |
Winter Capacity | 48 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 1928 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 4 Details Operating April 1928
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CONOWING13 KV GEN4 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONOWING13 KV GEN4 |
Nameplate Capacity | 47.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 41.9 MW |
Winter Capacity | 48 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 1928 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 5 Details Operating June 1928
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CONOWING13 KV GEN5 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONOWING13 KV GEN5 |
Nameplate Capacity | 36 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 32.7 MW |
Winter Capacity | 36 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1928 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 7 Details Operating June 1928
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CONOWING13 KV UNIT07 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONOWING13 KV UNIT07 |
Nameplate Capacity | 48 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 42.3 MW |
Winter Capacity | 48 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1928 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 6 Details Operating July 1928
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CONOWING13 KV GEN6 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONOWING13 KV GEN6 |
Nameplate Capacity | 47.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 42.3 MW |
Winter Capacity | 48 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 1928 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 8 Details Operating March 1964
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CONOWING13 KV GEN8 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONOWING13 KV GEN8 |
Nameplate Capacity | 55.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 56.7 MW |
Winter Capacity | 65 MW |
Minimum Load | 30 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 1964 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 9 Details Operating March 1964
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CONOWING13 KV GEN9 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONOWING13 KV GEN9 |
Nameplate Capacity | 55.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 57.3 MW |
Winter Capacity | 65 MW |
Minimum Load | 30 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 1964 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 10 Details Operating May 1964
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CONOWING13 KV G10 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONOWING13 KV G10 |
Nameplate Capacity | 55.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 56.1 MW |
Winter Capacity | 65 MW |
Minimum Load | 30 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 1964 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 11 Details Operating May 1964
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CONOWING13 KV G11 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONOWING13 KV G11 |
Nameplate Capacity | 55.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 52 MW |
Winter Capacity | 65 MW |
Minimum Load | 30 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 1964 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Conowingo Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#11 | Bonneville | Cascade Locks, OR | 3.5 TWh |
#12 | Wells | Pateros, WA | 3.4 TWh |
#13 | Boundary | Metaline, WA | 3.1 TWh |
#14 | Glen Canyon Dam | Page, AZ | 2.8 TWh |
#15 | Edward C Hyatt | Oroville, CA | 2.4 TWh |
#16 | Shasta | Redding, CA | 2.4 TWh |
#17 | Wilson Dam | Muscle Shoals, AL | 2.2 TWh |
#18 | Garrison | Riverside, ND | 2.1 TWh |
#19 | Brownlee | Cambridge, ID | 2.1 TWh |
#20 | Oahe | Pierre, SD | 2.1 TWh |
#22 | Rock Island | Wenatchee, WA | 2.0 TWh |
#23 | Hells Canyon | Oxbow, OR | 1.8 TWh |
#24 | Libby | Libby, MT | 1.6 TWh |
#25 | Hoover Dam (AZ) | Boulder City, AZ | 1.5 TWh |
#26 | Little Goose | Dayton, WA | 1.5 TWh |
#27 | Fort Randall | Pickstown, SD | 1.5 TWh |
#28 | Dworshak | Ahsahka, ID | 1.4 TWh |
#29 | Hoover Dam (NV) | Boulder City, NV | 1.4 TWh |
#30 | Ice Harbor | Burbank, WA | 1.4 TWh |
#31 | Lower Monumental | Kahlotus, WA | 1.3 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Conowingo.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
APG New Chesapeake | Aberdeen, MD | 4.0 GWh | 11.4 mi |
APG Old Bayside | Aberdeen, MD | 3.0 GWh | 11 mi |
Archdiocese of Baltimore J | Perryman, MD | 3.4 GWh | 14.8 mi |
Archdiocese of Baltimore L | Perryman, MD | 3.4 GWh | 14.8 mi |
Baltimore City D | Perryman, MD | 3.1 GWh | 15.5 mi |
Baltimore City G | Perryman, MD | 3.0 GWh | 15.5 mi |
City of Havre De Grace C | Perryman, MD | 3.4 GWh | 15.5 mi |
Essential Power Rock Springs LLC | Rising Sun, MD | 213.7 GWh | 4.3 mi |
Holtwood | Holtwood, PA | 949.8 GWh | 14.4 mi |
IKEA Perryville 460 | Perryville, MD | 5.1 GWh | 9.2 mi |
Keystone Solar | Quarryville, PA | 7.2 GWh | 14.3 mi |
Mason Solar One LLC | Elkton, MD | 2.0 GWh | 13.9 mi |
McCormick & Co. Inc. at Belcamp | Belcamp, MD | 2.4 GWh | 12.3 mi |
Meeting House | North East, MD | 1.3 GWh | 12.7 mi |
Peach Bottom | Delta, PA | 21.9 TWh | 8.6 mi |
Perryman | Harford County, MD | 196.0 GWh | 15 mi |
Sod Run WTP A | Perryman, MD | 3.4 GWh | 15.5 mi |
The Clorox Company | Aberdeen, MD | 2.6 GWh | 12.9 mi |
Wildcat Point Generation Facility | Conowingo, MD | 3.2 TWh | 4.4 mi |
York Energy Center | Delta, PA | 9.0 TWh | 8.9 mi |