Connecticut College
5 Resorvoir St, New London, CT 6320Plant Summary Information
Connecticut College is ranked #47 out of 55 natural gas power plants in Connecticut in terms of total annual net electricity generation.
Connecticut College is comprised of 1 generator and generated 8.1 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Connecticut College |
---|---|
Utility Name | Bloom Energy |
Location | Southeastern Connecticut Planning Region, CT |
Initial Operation Date | September 2019 |
Last Update | Dec 2023 |
Annual Generation | 8.1 GWh |
Annual Consumption | 60.6 k MMBtu |
Ranked #6,603 out of 11,852 Power Plants Nationwide | |
Ranked #1,628 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #74 out of 156 Connecticut Power Plants | |
Ranked #47 out of 55 Connecticut Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Connecticut College
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Connecticut College.
Monthly Net Generation for Connecticut College
Connecticut College Details
Summary Information | |
---|---|
Plant Name | Connecticut College (66152) |
Plant Address | 5 Resorvoir St, New London, CT 6320 |
Utility | Bloom Energy (57128) |
Latitude, Longitude | 41.38151, -72.10321 |
Generation Dates on File | Jan 2022 to Dec 2023 |
Initial Operation Date | September 2019 |
Annual Generation | 8.1 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | NSTAR Electric Company (54913) MA |
Grid Voltage | 13.20 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | SOUTHERN CONNECTICUT GAS COMPANY |
Natural Gas Storage | No |
Generator CNC00 Details Operating September 2019
Technology | Other Natural Gas |
---|---|
Prime Mover | Fuel Cell |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Minimum Load | 1.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Connecticut College Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1618 | Algonquin Power Sanger LLC | Sanger, CA | 8.3 GWh |
#1619 | CST001 McCarthy Fuel Cell | Milpitas, CA | 8.3 GWh |
#1620 | AT&T Anaheim | Anaheim, CA | 8.3 GWh |
#1621 | Sonoco Products Co | Hartsville, SC | 61.5 GWh |
#1622 | TLR000 Hansen Fuel Cell | Salinas, CA | 8.3 GWh |
#1623 | CalTech - Pasadena Wilson Ave | Pasadena, CA | 8.3 GWh |
#1624 | E F Oxnard Energy Facility | Oxnard, CA | 8.2 GWh |
#1625 | Creed Energy Center | Suisun, CA | 8.2 GWh |
#1626 | Derby Fuel Cell | Derby, CT | 8.2 GWh |
#1627 | Fredericktown Energy Center | Fredericktown, MO | 8.1 GWh |
#1629 | Spring House | Spring House, PA | 8.1 GWh |
#1630 | Equinix Douglas St. Fuel Cell | El Segundo, CA | 8.1 GWh |
#1631 | Island Street Peaking Plant | Kaukauna, WI | 8.0 GWh |
#1632 | Life Technologies - Pleasanton | Pleasanton, CA | 8.0 GWh |
#1633 | Wolfskill Energy Center | Fairfield, CA | 8.0 GWh |
#1634 | Pirkey | Hallsville, TX | 3.4 TWh |
#1635 | Red Shield Envir Old Town Facility | Old Town, ME | 66.3 GWh |
#1636 | MER Queens | Elmhurst, NY | 7.8 GWh |
#1637 | Ratkovich Alhambra | Alhambra, CA | 7.8 GWh |
#1638 | SEMASS Resource Recovery | West Wareham, MA | 568.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Connecticut College.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Antares-GRE 314 East Lyme LLC | East Lyme, CT | 4.1 GWh | 7.2 mi |
Bridge Street 1 & 2 | Groton, CT | 562.0 MWh | 1.7 mi |
CMEEC - Navy NE Trident | Groton, CT | 1.4 GWh | 1.6 mi |
CMEEC - Polaris Park Solar Hybrid | Gordon, CT | 4.9 GWh | 1.4 mi |
Covanta Southeastern Connecticut Company | Preston, CT | 116.0 GWh | 6.7 mi |
Fishers Island 1 | Fisher's Island, NY | 119.0 MWh | 9.2 mi |
Fort Hill 1, 2, 3 & 4 | Uncasville, CT | 701.0 MWh | 6.2 mi |
Foxwoods CoGen | Mashantucket, CT | 10.8 GWh | 9.7 mi |
Gary Court 1 & 2 | Groton, CT | 466.0 MWh | 5.3 mi |
Millstone | Waterford, CT | 16.0 TWh | 5.9 mi |
Montville Station | Uncasville, CT | 36.2 GWh | 3.2 mi |
Naval Sub Base New London Fuel Cell | Groton, CT | 34.2 GWh | 1.6 mi |
North Main Street | Norwich, CT | 138.5 MWh | 10.2 mi |
Norwich WWTP | Norwich, CT | 1.0 MWh | 10 mi |
Pfizer Groton Fuel Cell | Groton, CT | 42.1 GWh | 3.7 mi |
Pfizer Groton Plant | Groton, CT | 70.3 GWh | 3.7 mi |
Rand Whitney CHP Plant | Montville, CT | 133.7 GWh | 5.2 mi |
Subase Microgrid Project | Groton, CT | 34.2 GWh | 1.6 mi |
Water Treatment 1 & 2 | Groton, CT | 375.0 MWh | 4 mi |
Yale New Haven - New London | New London, CT | 14.6 GWh | 3.1 mi |