Concho Valley Solar, LLC
467 W Ratliff Dr, San Angelo, TX 76904Plant Summary Information
Concho Valley Solar, LLC is ranked #50 out of 161 solar farms in Texas in terms of total annual net electricity generation.
Concho Valley Solar, LLC generated 98.8 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Concho Valley Solar, LLC |
---|---|
Utility Name | Concho Valley Solar, LLC |
Location | Tom Green County, TX |
Initial Operation Date | May 2023 |
Last Update | Aug 2024 |
Annual Generation | 293.4 GWh |
Annual Consumption | 1.2 M MMBtu |
Ranked #1,852 out of 11,835 Power Plants Nationwide | |
Ranked #162 out of 5,643 Solar Power Plants Nationwide | |
Ranked #341 out of 749 Texas Power Plants | |
Ranked #50 out of 161 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Concho Valley Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Concho Valley Solar, LLC.
Monthly Net Generation for Concho Valley Solar, LLC
Concho Valley Solar, LLC Details
Summary Information | |
---|---|
Plant Name | Concho Valley Solar, LLC (65793) |
Plant Address | 467 W Ratliff Dr, San Angelo, TX 76904 |
Utility | Concho Valley Solar, LLC (65055) |
Latitude, Longitude | 31.214, -100.255 |
Generation Dates on File | Sep 2022 to Aug 2024 |
Initial Operation Date | May 2023 |
Annual Generation | 293.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | AEP Texas North Company (20404) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator CVS Details Operating May 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 172.8 MW |
Summer Capacity | 159.8 MW |
Winter Capacity | 159.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | No |
---|---|
Dish Engine | No |
Bifacial | Yes |
Other Solar Technology | Yes |
DC Net Capacity | 214.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Concho Valley Solar, LLC Plant Owners
Owner Name | Address | Ownership |
---|---|---|
CVS Energy Holdings, LLC | 1489 W Warm Springs RD 110, Henderson, NV 89014 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#152 | Pike Solar Hybrid | Fountain, CO | 307.9 GWh |
#153 | Highlander Solar Energy Station 1 | Spotsylvania, VA | 304.1 GWh |
#154 | Drew Solar LLC | Calexico, CA | 304.0 GWh |
#155 | Midway Solar - TX | Fort Stockton, TX | 302.3 GWh |
#156 | Samson Solar Energy III LLC | Cunningham, TX | 301.8 GWh |
#157 | BigBeau Solar, LLC | Rosamond, CA | 299.9 GWh |
#158 | Panoche Valley Solar Farm | Paicines, CA | 298.3 GWh |
#159 | Victory Pass | Desert Center, CA | 296.2 GWh |
#160 | Hudson - High Desert Hybrid | Victorville, CA | 288.5 GWh |
#161 | Wistaria Ranch Solar | Calexico, CA | 295.2 GWh |
#163 | Blythe Solar IV, LLC | Blythe, CA | 284.6 GWh |
#164 | Montague Solar | Arlington, OR | 292.3 GWh |
#165 | Springbok Solar Farm 1 | Cantil, CA | 291.6 GWh |
#166 | Ganado Solar | Gail, TX | 288.0 GWh |
#167 | Umbriel Solar | Livington, TX | 289.8 GWh |
#168 | Harry Allen Solar Energy LLC | Apex, NV | 287.9 GWh |
#169 | Upton County Solar | McCamey, TX | 287.4 GWh |
#170 | Elm Branch Solar 1 | Bardwell, TX | 287.2 GWh |
#171 | Arlington Energy Center III | Blythe, CA | 263.6 GWh |
#172 | Hardin Solar Energy LLC | Alger, OH | 285.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Concho Valley Solar, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aviator Wind | Robert Lee, TX | 1.8 TWh | 47.7 mi |
Bluebell Solar | Sterling City, TX | 72.0 GWh | 56.5 mi |
Bluebell Solar II | Sterling, TX | 267.0 GWh | 57.4 mi |
Cactus Flats Wind Energy Project | Eden, TX | 441.9 GWh | 15.1 mi |
Galloway 1 Solar Farm | Paint Rock, TX | 496.6 GWh | 31.1 mi |
Galloway 2 Solar Farm | Paint Rock, TX | 206.0 GWh | 26.3 mi |
Goat Wind LP | Sterling City, TX | 245.7 GWh | 60 mi |
Heart of Texas Wind Project | Brady, TX | 606.0 GWh | 49.3 mi |
Holstein 1 Solar Farm | Wingate, TX | 389.6 GWh | 61.7 mi |
IP Radian, LLC | Brookesmith, TX | 687.2 GWh | 67.1 mi |
Jameson Gas Processing Plant | Silver, TX | 12.9 GWh | 63.2 mi |
Lampwick | Hext, TX | 12.3 GWh | 48.6 mi |
Langford Wind Power | Christoval, TX | 587.5 GWh | 26.6 mi |
Live Oak Wind Project | Eldorado, TX | 750.3 GWh | 24.6 mi |
Maverick Creek Wind | Eden, TX | 1.4 TWh | 24.5 mi |
Rambler | San Angelo, TX | 441.1 GWh | 29.2 mi |
Rattlesnake Power, LLC | Brady, TX | 548.9 GWh | 42.8 mi |
Santa Rita East | Barnhart, TX | 1.1 TWh | 50.6 mi |
Santa Rita Wind Energy | Big Lake, TX | 1.2 TWh | 62.9 mi |
White Mesa Wind | Ozona, TX | 1.8 TWh | 63.2 mi |