Commonwealth Chesapeake is ranked #30 out of 1,262 distillate fuel oil power plants nationwide in terms of total annual net electricity generation.
Commonwealth Chesapeake is comprised of 7 generators and generated 17.2 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Commonwealth Chesapeake |
---|---|
Utility Name | Commonwealth Chesapeake Co LLC |
Location | Accomack County, VA |
Initial Operation Date | August 2000 |
Last Update | Aug 2024 |
Annual Generation | 29.4 GWh |
Annual Consumption | 345.5 k MMBtu |
Ranked #4,566 out of 11,835 Power Plants Nationwide | |
Ranked #30 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #116 out of 211 Virginia Power Plants | |
Ranked #2 out of 64 Virginia Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Commonwealth Chesapeake
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Commonwealth Chesapeake.
Monthly Net Generation for Commonwealth Chesapeake
Commonwealth Chesapeake Details
Summary Information | |
---|---|
Plant Name | Commonwealth Chesapeake (55381) |
Plant Address | 3415 White Oak Way, New Church, VA 23415 |
Utility | Commonwealth Chesapeake Co LLC (4194) |
Latitude, Longitude | 37.9892, -75.54 |
Generation Dates on File | Jan 2002 to Aug 2024 |
Initial Operation Date | August 2000 |
Annual Generation | 29.4 GWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 99-415-001; 99-415-003 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Delmarva Power (5027) DE |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator UNT1 Details Standby August 2000
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 93150 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 93150 |
Nameplate Capacity | 57.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 45.1 MW |
Winter Capacity | 49 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
---|---|
First Operation Date | August 2000 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator UNT2 Details Standby September 2000
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 93151 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 93151 |
Nameplate Capacity | 57.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 43.7 MW |
Winter Capacity | 47.8 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
---|---|
First Operation Date | September 2000 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator UNT3 Details Standby September 2000
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 93152 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 93152 |
Nameplate Capacity | 57.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 45.4 MW |
Winter Capacity | 46.3 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
---|---|
First Operation Date | September 2000 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator UNT4 Details Standby June 2001
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 1048078 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 1048078 |
Nameplate Capacity | 57.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44 MW |
Winter Capacity | 45.6 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
---|---|
First Operation Date | June 2001 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator UNT5 Details Standby June 2001
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 1048079 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 1048079 |
Nameplate Capacity | 57.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 45.4 MW |
Winter Capacity | 47.2 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
---|---|
First Operation Date | June 2001 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator UNT6 Details Standby June 2001
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 104080 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 104080 |
Nameplate Capacity | 57.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 45.1 MW |
Winter Capacity | 46 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
---|---|
First Operation Date | June 2001 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator UNT7 Details Standby August 2001
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | 104081 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 104081 |
Nameplate Capacity | 57.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 45.2 MW |
Winter Capacity | 45.5 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
---|---|
First Operation Date | August 2001 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Commonwealth Chesapeake Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Tyr Energy, Inc | 7500 College Blvd.Suite 400, Overland Park, KS 66210 | Generator UNT1 | 100.00% |
Tyr Energy, Inc | 7500 College Blvd.Suite 400, Overland Park, KS 66210 | Generator UNT2 | 100.00% |
Tyr Energy, Inc | 7500 College Blvd.Suite 400, Overland Park, KS 66210 | Generator UNT3 | 100.00% |
Tyr Energy, Inc | 7500 College Blvd.Suite 400, Overland Park, KS 66210 | Generator UNT4 | 100.00% |
Tyr Energy, Inc | 7500 College Blvd.Suite 400, Overland Park, KS 66210 | Generator UNT5 | 100.00% |
Tyr Energy, Inc | 7500 College Blvd.Suite 400, Overland Park, KS 66210 | Generator UNT6 | 100.00% |
Tyr Energy, Inc | 7500 College Blvd.Suite 400, Overland Park, KS 66210 | Generator UNT7 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#20 | Miki Basin | Lanai City, HI | 35.1 GWh |
#21 | Monroe (MI) | Monroe, MI | 13.0 TWh |
#22 | Palaau Power Hybrid | Kaunakakai, HI | 31.1 GWh |
#23 | Snake River | Nome, AK | 32.7 GWh |
#24 | Fort Myers | Ft. Myers, FL | 8.9 TWh |
#25 | Cross | Cross, SC | 8.6 TWh |
#26 | La Cygne | La Cygne, KS | 5.5 TWh |
#27 | Unisea G 2 | Dutch Harbor, AK | 29.6 GWh |
#28 | Rockport | Rockport, IN | 4.9 TWh |
#29 | Gibson | Owensville, IN | 9.7 TWh |
#31 | Mitchell (WV) | Captina, WV | 3.4 TWh |
#32 | Pebbly Beach Generating Station Hybrid | Avalon, CA | 29.1 GWh |
#33 | Gordonsville Energy LP | Gordonsville, VA | 1.1 TWh |
#34 | Inver Hills | Inver Grove Heights, MN | 78.2 GWh |
#35 | Roxboro | Semora, NC | 6.1 TWh |
#36 | Milton R Young | Center, ND | 4.6 TWh |
#37 | Stony Brook | Ludlow, MA | 26.3 GWh |
#38 | Belle River | China Twp, MI | 6.0 TWh |
#39 | Northeast (MO) | Kansas City, MO | 25.5 GWh |
#40 | Crystal River | Crystal River, FL | 16.5 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Commonwealth Chesapeake.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Belle Haven Diesel Generation Facility | Belle Haven, VA | 121.0 MWh | 33.4 mi |
Crisfield | Crisfield, MD | 2.2 GWh | 16.2 mi |
Eastern Correctional Institute | Westover, MD | 5.7 GWh | 14.7 mi |
Eastern Shore Solar, LLC | Oak Hall, VA | 132.4 GWh | 3.5 mi |
Gateway Solar | Berlin, MD | 10.0 GWh | 30.4 mi |
Gibbons CSG | Snow Hill, MD | 3.7 GWh | 19.7 mi |
Great Bay Solar 1 | Princess Anne, MD | 138.2 GWh | 15.1 mi |
Longview Solar | Hebron, MD | 23.6 GWh | 28.9 mi |
NASA Wallops Flight Facility Solar | Wallops Island, VA | 5.8 GWh | 5.1 mi |
Onancock Diesel Generation Facility | Onancock, VA | 122.0 MWh | 19.5 mi |
Perdue Diesel Generation Facility | Accomack, VA | 131.0 MWh | 18.2 mi |
Perdue Salisbury Photovoltaic | Salisbury, MD | 1.5 GWh | 26.6 mi |
Smith Island | Ewell, MD | 79.0 MWh | 27.2 mi |
Tangier | Tangier, VA | 88.0 MWh | 27 mi |
Tasley | Tasley, VA | 2.3 GWh | 21.5 mi |
UMES (MD) - Princess Anne | Princess Anne, MD | 2.4 GWh | 16.5 mi |
UMMS at Pocomoke | Pocomoke City, MD | 5.1 GWh | 8.5 mi |
Vienna Operations | Vienna, MD | 2.9 GWh | 37.7 mi |
Wicomico | Salisbury, MD | 15.4 GWh | 27.8 mi |
Wor-Wic Community College - Offsite | Hebron, MD | 3.5 GWh | 30.4 mi |