1501 Business Loop 70 E, Columbia, MO 65205Plant Summary Information
Columbia (MO) is ranked #3 out of 5 landfill gas power plants in Missouri in terms of total annual net electricity generation.
Columbia (MO) is comprised of 12 generators and generated 4.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Columbia (MO) |
---|---|
Utility Name | City of Columbia - (MO) |
Location | Boone County, MO |
Initial Operation Date | January 1957 |
Last Update | Dec 2023 |
Annual Generation | 16.6 GWh |
Annual Consumption | 261.5 k MMBtu |
Ranked #5,285 out of 11,852 Power Plants Nationwide | |
Ranked #207 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #56 out of 120 Missouri Power Plants | |
Ranked #3 out of 5 Missouri Landfill Gas Power Plants | |
Fuel Types | Landfill Gas : 73.4% Natural Gas : 26.6% |
Map of Columbia (MO)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Columbia (MO).
Monthly Net Generation for Columbia (MO)
Columbia (MO) Details
Summary Information | |
---|---|
Plant Name | Columbia (MO) (2123) |
Plant Address | 1501 Business Loop 70 E, Columbia, MO 65205 |
Utility | City of Columbia - (MO) (4045) |
Latitude, Longitude | 38.96465, -92.31677 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | January 1957 |
Annual Generation | 16.6 GWh |
Fuel Types | Landfill Gas : 73.4% Natural Gas : 26.6% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Wells |
Ash Impoundment | Yes Not Lined Out of Service |
Transmission / Distribution Owner | City of Columbia - (MO) (4045) MO |
Grid Voltage | 82.80 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | PANHANDLE EASTERN PIPELINE COMPANY |
Natural Gas Storage | No |
Generator 6 Details Operating August 1963
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CWLD.CWLD |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CWLD.CWLD |
Nameplate Capacity | 12.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 12.5 MW |
Winter Capacity | 12.5 MW |
Minimum Load | 9 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1963 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 8 Details Operating January 1970
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CWLD.CWLD |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CWLD.CWLD |
Nameplate Capacity | 35 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 35 MW |
Winter Capacity | 35 MW |
Minimum Load | 12 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1970 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator SH1 Details Operating April 2002
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.3 MW |
Winter Capacity | 1.3 MW |
Minimum Load | 1.3 MW |
Status | Operating |
---|---|
First Operation Date | April 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator SH2 Details Operating April 2002
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.3 MW |
Winter Capacity | 1.3 MW |
Minimum Load | 1.3 MW |
Status | Operating |
First Operation Date | April 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Subcritical Technology | No |
Multiple Fuels | No |
Generator DAN1 Details Operating August 2004
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2004 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator WTP1 Details Operating August 2004
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2004 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator WTP2 Details Operating August 2004
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2004 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Subcritical Technology | No |
Multiple Fuels | No |
Generator SF1 Details Operating November 2008
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2008 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator SF2 Details Operating November 2008
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2008 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator LF1 Details Operating June 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2008 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator LF2 Details Operating June 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2008 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Landfill Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator LF3 Details Operating August 2013
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2013 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Landfill Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Columbia (MO) Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Shelter Insurance Companies | 1817 W. Broadway, Columbia, MO 65203 | Generator SH1 | 100.00% |
Shelter Insurance Companies | 1817 W. Broadway, Columbia, MO 65203 | Generator SH2 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#197 | Ameresco Chicopee Energy | Chicopee, MA | 14.1 GWh |
#198 | Nashua Plant | Nashua, NH | 13.8 GWh |
#199 | Dry Creek LFG to Energy Project | Eagle Point, OR | 13.5 GWh |
#200 | CG PS Portfolio 1, LLC | Kathleen, GA | 13.3 GWh |
#201 | Croda Atlas Point CHP | New Castle, DE | 13.2 GWh |
#202 | Tullytown | Morrisville, PA | 13.2 GWh |
#203 | New River | Dublin, VA | 13.7 GWh |
#204 | Bannock County LFG to Energy | Pocatello, ID | 12.8 GWh |
#205 | MMSD Jones Island Wastewater | Milwaukee, WI | 61.0 GWh |
#206 | Davidson Gas Producers LLC | Lexington, NC | 12.3 GWh |
#208 | Richland County Landfill | Lugoff, SC | 12.1 GWh |
#209 | Autumn Hills Generating Facility | Zeeland, MI | 11.8 GWh |
#210 | Lake Gas Recovery | Northbrook, IL | 11.8 GWh |
#211 | Southbridge Landfill Gas-to-Energy | Southbridge, MA | 11.7 GWh |
#212 | Winnebago County Landfill Gas | Oshkosh, WI | 11.4 GWh |
#213 | Venice Resources Gas Recovery | Lennon, MI | 11.2 GWh |
#214 | Bi-County Gas Producers | Woodlawn, TN | 11.2 GWh |
#215 | Renewable Energy Services of Ohio | Milan, OH | 11.1 GWh |
#216 | Berlin Landfill Gas | Berlin, WI | 11.1 GWh |
#217 | Glades Pike Generation Plant | Somerset, PA | 11.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Columbia (MO).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Altona Solar, LLC | Centralia, MO | 7.8 GWh | 23.9 mi |
Ameresco Jefferson City | Jefferson City, MO | 22.4 GWh | 32 mi |
Audrain Generating Station | Vandalia, MO | 197.1 GWh | 48.1 mi |
Callaway | Fulton, MO | 9.4 TWh | 32.2 mi |
Columbia Energy Center | Columbia, MO | 20.1 GWh | 4.8 mi |
Fairgrounds | Jefferson City, MO | 1.5 GWh | 26.2 mi |
Fulton (MO) | Fulton, MO | 206.0 MWh | 20.9 mi |
Marshall (MO) | Marshall, MO | 1.7 GWh | 49 mi |
Marshall Solar Farm (MO) | Marshall, MO | 4.2 GWh | 48.8 mi |
Mexico | Mexico, MO | 12.7 MWh | 29 mi |
MJMEUC Generating Station #1 | Laddonia, MO | 110.4 GWh | 41.3 mi |
Moberly | Moberly, MO | 30.0 MWh | 33 mi |
Montgomery County Community Solar Center | New Florence, MO | 11.2 GWh | 48.3 mi |
Moreau | Moreau, MO | 2.1 GWh | 30.5 mi |
MU Combined Heat and Power Plant | Columbia, MO | 191.9 GWh | 1.5 mi |
Shelbina Power #1 | Shelbina, MO | 7.0 MWh | 52.5 mi |
Shelbina Power #2 | Shelbina, MO | 31.0 MWh | 52.5 mi |
Shelbina Power #3 | Shelbina, MO | 8.0 MWh | 52.6 mi |
Thomas Hill | Clifton Hill, MO | 6.4 TWh | 44.1 mi |
Truman Solar | Colombia, MO | 22.7 GWh | 4 mi |