Coldwater Peaking Plant
250 North Filmore Road, Coldwater, MI 49036Plant Summary Information
Coldwater Peaking Plant is ranked #54 out of 72 natural gas power plants in Michigan in terms of total annual net electricity generation.
Coldwater Peaking Plant is comprised of 3 generators and generated 193.2 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Coldwater Peaking Plant |
---|---|
Utility Name | Coldwater Board of Public Util |
Location | Branch County, MI |
Initial Operation Date | July 2015 |
Last Update | Dec 2023 |
Annual Generation | 786.0 MWh |
Annual Consumption | 6.6 k MMBtu |
Ranked #10,868 out of 11,835 Power Plants Nationwide | |
Ranked #1,909 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #226 out of 255 Michigan Power Plants | |
Ranked #54 out of 72 Michigan Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operators |
Michigan South Central Pwr Agy (2014 to 2016) Michigan South Central Power Agency (2017 to 2019) Coldwater Board of Public Util (2020 to 2023) |
Map of Coldwater Peaking Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Coldwater Peaking Plant.
Monthly Net Generation for Coldwater Peaking Plant
Coldwater Peaking Plant Details
Summary Information | |
---|---|
Plant Name | Coldwater Peaking Plant (59467) |
Plant Address | 250 North Filmore Road, Coldwater, MI 49036 |
Utility | Coldwater Board of Public Util (3915) |
Latitude, Longitude | 41.91944, -85.02417 |
Generation Dates on File | Jul 2015 to Dec 2023 |
Initial Operation Date | July 2015 |
Annual Generation | 786.0 MWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | Coldwater Board of Public Util (3915) MI |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | MICHIGAN GAS UTILITIES CO |
Natural Gas Storage | No |
Generator GEN1 Details Operating July 2015
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CONS.MSCP |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONS.MSCP |
Nameplate Capacity | 4.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 4.3 MW |
Winter Capacity | 4.3 MW |
Minimum Load | 4.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2015 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating July 2015
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CONS.MSCP |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONS.MSCP |
Nameplate Capacity | 4.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 4.3 MW |
Winter Capacity | 4.3 MW |
Minimum Load | 4.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2015 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN3 Details Operating July 2015
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CONS.MSCP |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CONS.MSCP |
Nameplate Capacity | 4.3 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 4.3 MW |
Winter Capacity | 4.3 MW |
Minimum Load | 4.3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2015 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Coldwater Peaking Plant Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1899 | Pasco Cnty Solid Waste Resource Recovery | Spring Hill, FL | 183.2 GWh |
#1900 | Red Wing | Red Wing, MN | 121.4 GWh |
#1901 | Bryan (OH) | Bryan, OH | 916.8 MWh |
#1902 | Iola | Iola, KS | 909.0 MWh |
#1903 | Onondaga County Resource Recovery | Jamesville, NY | 208.8 GWh |
#1904 | Regional Waste Systems | Portland, ME | 80.9 GWh |
#1905 | OTHERCitizensHospital | Victoria, TX | 823.0 MWh |
#1906 | MacArthur Waste to Energy Facility | Ronkonkoma, NY | 52.6 GWh |
#1907 | Muscatine Plant #1 | Muscatine, IA | 501.7 GWh |
#1908 | Falling Spring | Chambersburg, PA | 906.0 MWh |
#1910 | Raccoon Creek Energy Center | Flora, IL | 778.1 MWh |
#1911 | Hamilton (OH) | Hamilton, OH | 776.0 MWh |
#1912 | M L Hibbard | Duluth, MN | 70.1 GWh |
#1913 | Rowesville Rd Plant | Orangeburg, SC | 770.0 MWh |
#1914 | McClure | Modesto, CA | 1.3 GWh |
#1915 | Honda Torrance | Torrance, CA | 762.0 MWh |
#1916 | Fort Lupton | Ft. Lupton, CO | 2.2 GWh |
#1917 | Merl Parr | Charles City, IA | 756.0 MWh |
#1918 | Lincoln Combustion | Stanley, NC | 3.4 GWh |
#1919 | Kaukauna Gas Turbine | Kaukauna, WI | 741.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Coldwater Peaking Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
13 Mile Solar, LLC | Battle Creek, MI | 4.0 GWh | 28.2 mi |
Angola Solar, LLC | Coldwater, MI | 3.7 GWh | 5.9 mi |
Battle Creek Mill | Battle Creek, MI | 4.4 GWh | 29.3 mi |
Bullhead Solar, LLC | Fayette, MI | 3.8 GWh | 18.2 mi |
Calhoun Solar | Battle Creek, MI | 346.8 GWh | 29 mi |
Cereal City Solar, LLC | Battle Creek, MI | 149.4 GWh | 26.7 mi |
Constantine | Constantine, MI | 3.8 GWh | 33.6 mi |
Crescent Wind Park | Hillsdale, MI | 363.9 GWh | 28.1 mi |
DG AMP Solar Coldwater | Coldwater, MI | 2.0 GWh | 1.7 mi |
Electric City Solar | Sturgis, MI | 26.9 GWh | 24.9 mi |
Greenstone Solar, LLC | Coldwater, MI | 807.0 MWh | 5.3 mi |
GRS C&C | Marshall, MI | 18.2 GWh | 30.2 mi |
Hillsdale | Hillsdale, MI | 309.0 MWh | 20.2 mi |
Hydro Plant | Three Rivers, MI | 2.7 GWh | 26.7 mi |
Marshall (MI) | Marshall, MI | 611.0 MWh | 24.7 mi |
Montpelier | Montpelier, OH | 323.0 MWh | 32.5 mi |
Shipsterns Solar, LLC | Albion, MI | 1.3 GWh | 29.6 mi |
Sturgis City Diesel Plant | Sturgis, MI | 208.0 MWh | 22.3 mi |
The Andersons Albion Ethanol LLC | Albion, MI | 65.7 GWh | 26.2 mi |
Waterloo Solar, LLC | Waterloo, IN | 560.0 MWh | 33.6 mi |