Colbert
900 Steam Plant Rd., Tuscumbia, AL 35674Plant Summary Information
Colbert is ranked #25 out of 36 natural gas power plants in Alabama in terms of total annual net electricity generation.
Colbert is comprised of 11 generators and generated 19.2 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Colbert |
---|---|
Utility Name | Tennessee Valley Authority |
Location | Colbert County, AL |
Initial Operation Date | January 1955 |
Last Update | Dec 2023 |
Annual Generation | 78.7 GWh |
Annual Consumption | 4.0 M MMBtu |
Ranked #3,446 out of 11,835 Power Plants Nationwide | |
Ranked #966 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #60 out of 75 Alabama Power Plants | |
Ranked #25 out of 36 Alabama Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Colbert
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Colbert.
Monthly Net Generation for Colbert
Colbert Details
Summary Information | |
---|---|
Plant Name | Colbert (47) |
Plant Address | 900 Steam Plant Rd., Tuscumbia, AL 35674 |
Utility | Tennessee Valley Authority (18642) |
Latitude, Longitude | 34.7439, -87.8486 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | January 1955 |
Annual Generation | 78.7 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tennessee Valley Authority (TVA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Tennessee River |
Ash Impoundment | Yes Not Lined Operating |
Transmission / Distribution Owner | Tennessee Valley Authority (18642) AL |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | American Midstream Bamagas LLC |
Natural Gas Storage | No |
Generator GT1 Details Operating September 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 59.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 45.4 MW |
Winter Capacity | 60.8 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 45.4 MW |
Net Winter Capacity With Natural Gas | 60.8 MW |
Net Summer Capacity With Oil | 47.5 MW |
Net Winter Capacity With Oil | 59.1 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT2 Details Operating September 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 59.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 45.4 MW |
Winter Capacity | 60.8 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 45.4 MW |
Net Winter Capacity With Natural Gas | 60.8 MW |
Net Summer Capacity With Oil | 47.5 MW |
Net Winter Capacity With Oil | 59.1 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT3 Details Operating September 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 59.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 45.4 MW |
Winter Capacity | 60.8 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 45.4 MW |
Net Winter Capacity With Natural Gas | 60.8 MW |
Net Summer Capacity With Oil | 47.5 MW |
Net Winter Capacity With Oil | 59.1 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT4 Details Operating September 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 59.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 45.4 MW |
Winter Capacity | 60.8 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 45.4 MW |
Net Winter Capacity With Natural Gas | 60.8 MW |
Net Summer Capacity With Oil | 47.5 MW |
Net Winter Capacity With Oil | 59.1 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT5 Details Operating September 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 59.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 45.4 MW |
Winter Capacity | 60.8 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 45.4 MW |
Net Winter Capacity With Natural Gas | 60.8 MW |
Net Summer Capacity With Oil | 47.5 MW |
Net Winter Capacity With Oil | 59.1 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT6 Details Operating September 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 59.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 45.4 MW |
Winter Capacity | 60.8 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 45.4 MW |
Net Winter Capacity With Natural Gas | 60.8 MW |
Net Summer Capacity With Oil | 47.5 MW |
Net Winter Capacity With Oil | 59.1 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT7 Details Operating September 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 59.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 45.4 MW |
Winter Capacity | 60.8 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 45.4 MW |
Net Winter Capacity With Natural Gas | 60.8 MW |
Net Summer Capacity With Oil | 47.5 MW |
Net Winter Capacity With Oil | 59.1 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT8 Details Operating September 1972
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 59.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 45.4 MW |
Winter Capacity | 60.8 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1972 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 45.4 MW |
Net Winter Capacity With Natural Gas | 60.8 MW |
Net Summer Capacity With Oil | 47.5 MW |
Net Winter Capacity With Oil | 59.1 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT10 Details Operating July 2023
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 231.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 221 MW |
Winter Capacity | 231 MW |
Minimum Load | 60 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator GT11 Details Operating July 2023
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 231.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 221 MW |
Winter Capacity | 231 MW |
Minimum Load | 60 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator GT9 Details Operating July 2023
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 231.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 221 MW |
Winter Capacity | 231 MW |
Minimum Load | 60 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Colbert Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#956 | Canyon Power Plant | Anaheim, CA | 81.6 GWh |
#957 | Clearwater Paper IPP Lewiston | Lewiston, ID | 372.7 GWh |
#958 | Elk Hills Cogen | Tupman, CA | 80.7 GWh |
#959 | Trigen St. Louis | St Louis, MO | 80.0 GWh |
#960 | Garden City | Garden City, KS | 79.5 GWh |
#961 | Phillips 66 Rodeo Refinery | Rodeo, CA | 291.0 GWh |
#962 | Chino Mines | Hurley, NM | 79.2 GWh |
#963 | Chanute 2 | Chanute, KS | 79.2 GWh |
#964 | Lakefield Junction | Trimont, MN | 79.0 GWh |
#965 | Androscoggin Energy Center | Jay, ME | 82.0 GWh |
#967 | Rokeby | Lincoln, NE | 80.3 GWh |
#968 | DeRidder Mill | DeRidder, LA | 389.0 GWh |
#969 | Sowega Power | Baconton, GA | 77.2 GWh |
#970 | Wolf Hills Energy | Bristol, VA | 77.1 GWh |
#971 | Cargill Corn Milling Division | Eddyville, IA | 76.3 GWh |
#972 | Camden Plant Holding LLC | Camden, NJ | 76.0 GWh |
#973 | Gibson City Energy Center LLC | Gibson City, IL | 75.8 GWh |
#974 | River Valley | Panama, OK | 541.9 GWh |
#975 | NCSU Cates Cogeneration Plant | Raleigh, NC | 76.4 GWh |
#976 | Ford Utilities Center | Albuquerque, NM | 75.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Colbert.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Browns Ferry | Decatur, AL | 30.5 TWh | 41.5 mi |
Cumblerland Land Holdings, LLC | Elkmont, AL | 28.6 GWh | 57.4 mi |
Decatur Energy Center | Decatur, AL | 3.0 TWh | 47.7 mi |
Decatur-Morgan Co LFG Recovery Project | Trinity, AL | 10.7 GWh | 43.3 mi |
Lewis Smith Dam | Jasper, AL | 233.4 GWh | 69.8 mi |
Magnolia Power Plant | Ashland, MS | 6.4 TWh | 77.1 mi |
Morgan Energy Center | Decatur, AL | 4.5 TWh | 45.2 mi |
Mulberry Farm LLC | Selmer, TN | 25.1 GWh | 49.7 mi |
Muscle Shoals | Cherokee, AL | 437.0 GWh | 3.6 mi |
Packaging Corp of America | Counce, TN | 409.7 GWh | 31.6 mi |
Pickwick Landing Dam | Pickwick Dam, TN | 1.1 TWh | 31.9 mi |
Redstone Arsenal Hybrid | Huntsville, AL | 15.5 GWh | 70.9 mi |
River Bend Solar, LLC | Florence, AL | 151.5 GWh | 6.1 mi |
Selmer Farm LLC | Selmer, TN | 24.9 GWh | 48.9 mi |
Selmer I | Selmer, TN | 22.8 GWh | 48.3 mi |
Selmer II | Selmer, TN | 10.9 GWh | 53.8 mi |
SR Bolivar | Bolivar, TN | 6.5 GWh | 75.2 mi |
TAI Huntsville Solar Hybrid | Huntsville, AL | 13.3 GWh | 69.4 mi |
Wheeler Dam | Town Creek, AL | 1.1 TWh | 26.8 mi |
Wilson Dam | Muscle Shoals, AL | 2.2 TWh | 13.2 mi |