Coal Creek
2875 3rd Street SW, Underwood, ND 58576Plant Summary Information
Coal Creek is ranked #2 out of 5 coal plants nationwide in terms of total annual net electricity generation.
Coal Creek is comprised of 4 generators and generated 2.0 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | Coal Creek |
---|---|
Utility Name | Rainbow Energy Center |
Location | McLean County, ND |
Initial Operation Date | June 1979 |
Last Update | Aug 2024 |
Annual Generation | 7.7 TWh |
Annual Consumption | 92.4 M MMBtu |
Ranked #101 out of 11,835 Power Plants Nationwide | |
Ranked #2 out of 5 Refined Coal Power Plants Nationwide | |
Ranked #1 out of 56 North Dakota Power Plants | |
Ranked #1 out of 2 North Dakota Refined Coal Power Plants | |
Fuel Types | Refined Coal : 99.9% |
Previous Operator |
Great River Energy (2013 to 2021) Rainbow Energy Center (2022 to 2023) |
Map of Coal Creek
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Coal Creek.
Monthly Net Generation for Coal Creek
Coal Creek Details
Summary Information | |
---|---|
Plant Name | Coal Creek (6030) |
Plant Address | 2875 3rd Street SW, Underwood, ND 58576 |
Utility | Rainbow Energy Center (65146) |
Latitude, Longitude | 47.37774, -101.15706 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | June 1979 |
Annual Generation | 7.7 TWh |
Fuel Types | Refined Coal : 99.9% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Missouri River |
Ash Impoundment | Yes Lined Operating |
Transmission / Distribution Owner | Nexus Line, LLC (65636) |
Grid Voltage | 410.00 kV |
Energy Storage | No |
Generator 1 Details Operating June 1979
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | GRE,REC.CC1_DC |
RTO ISO Location Designation For Reporting Wholesale Sales Data | GRE.REC.CC1_DC |
Nameplate Capacity | 604.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 568.3 MW |
Winter Capacity | 568.3 MW |
Minimum Load | 285 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1979 |
Combined Heat & Power | Yes |
Sector Name | Electric Utility (1) |
---|---|
Topping Or Bottoming | T |
Energy Source | Refined Coal / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Fluidized Bed Technology | No |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating September 1980
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | GRE.REC.CC2_DC |
RTO ISO Location Designation For Reporting Wholesale Sales Data | GRE.REC.CC2_DC |
Nameplate Capacity | 604.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 573.9 MW |
Winter Capacity | 573.9 MW |
Minimum Load | 285 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1980 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Electric Utility (1) |
Topping Or Bottoming | T |
Energy Source | Refined Coal / Distillate Fuel Oil |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 5 Details Standby January 2016
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | January 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4 Details Standby February 2016
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | February 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Coal Creek Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Refined Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | FirstEnergy Harrison Power Station | Haywood, WV | 11.9 TWh |
#3 | Thomas Hill | Clifton Hill, MO | 6.2 TWh |
#4 | New Madrid | New Madrid, MO | 5.2 TWh |
#5 | Spiritwood Station | Spiritwood, ND | 181.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Coal Creek.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Antelope Valley | Beulah, ND | 5.0 TWh | 31.8 mi |
Baldwin Wind LLC | Wilton, ND | 360.4 GWh | 27.9 mi |
Bison 2 Wind Energy Center | New Salem, ND | 236.8 GWh | 33.2 mi |
Bison 3 Wind Energy Center | New Salem, ND | 242.1 GWh | 33.2 mi |
Bison 4 Wind Energy Center | New Salem, ND | 608.4 GWh | 33.2 mi |
Bison I Wind Energy Center | New Salem, ND | 181.7 GWh | 33.2 mi |
Coyote | Beulah, ND | 2.4 TWh | 32.7 mi |
FPL Energy Burleigh County Wind | Wilton, ND | 175.4 GWh | 26.8 mi |
FPL Energy Oliver Wind I LLC | Center, ND | 171.5 GWh | 15.7 mi |
FPL Energy Oliver Wind II LLC | Center, ND | 179.9 GWh | 15.7 mi |
Garrison | Riverside, ND | 2.1 TWh | 14.4 mi |
Glen Ullin Energy Center | Glen Ullin, ND | 434.9 GWh | 42.1 mi |
Leland Olds | Stanton, ND | 3.3 TWh | 10.2 mi |
Milton R Young | Center, ND | 4.6 TWh | 21.7 mi |
New Frontier Wind | Ruso, ND | 378.2 GWh | 34.8 mi |
Oliver Wind III, LLC | Mandan, ND | 418.6 GWh | 29.1 mi |
Prairie Winds ND1 | Minot, ND | 328.2 GWh | 38.8 mi |
R M Heskett | Mandan, ND | 31.9 GWh | 37.6 mi |
Tesoro Mandan Cogeneration Plant | Mandan, ND | 34.1 GWh | 38.8 mi |
Wilton Wind II LLC | Wilton, ND | 187.0 GWh | 27.2 mi |