Clyde Solar Array
749 West McPherson Hwy, Clyde, OH 43410Plant Summary Information
Clyde Solar Array is ranked #31 out of 59 solar farms in Ohio in terms of total annual net electricity generation.
Clyde Solar Array generated 367.0 MWh during the 3-month period between November 2024 to February 2025.
Plant Name | Clyde Solar Array |
---|---|
Utility Name | AEP Onsite Partners, LLC |
Location | Sandusky County, OH |
Initial Operation Date | June 2016 |
Last Update | Feb 2025 |
Annual Generation | 4.2 GWh |
Annual Consumption | 15.1 k MMBtu |
Ranked #8,184 out of 11,993 Power Plants Nationwide | |
Ranked #3,178 out of 5,778 Solar Power Plants Nationwide | |
Ranked #109 out of 189 Ohio Power Plants | |
Ranked #31 out of 59 Ohio Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
AEP Onsite Partners (2016 to 2019) AEP Onsite Partners, LLC (2020 to 2023) |
Map of Clyde Solar Array
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Clyde Solar Array.
Monthly Net Generation for Clyde Solar Array
Clyde Solar Array Details
Summary Information | |
---|---|
Plant Name | Clyde Solar Array (60923) |
Plant Address | 749 West McPherson Hwy, Clyde, OH 43410 |
Utility | AEP Onsite Partners, LLC (60571) |
Latitude, Longitude | 41.31935, -82.98433 |
Generation Dates on File | Jun 2016 to Feb 2025 |
Initial Operation Date | June 2016 |
Annual Generation | 4.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 16-1069-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Clyde Light & Power (3824) OH |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator PV1 Details Operating June 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2.8 MW |
Summer Capacity | 2.8 MW |
Winter Capacity | 0.7 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Fixed Tilt | No |
DC Net Capacity | 3.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Clyde Solar Array Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3168 | Conejos 1 Community Solar Array | La Jara, CO | 4.2 GWh |
#3169 | Morgan Solar 2, LLC CSG | Murrayville, IL | 4.2 GWh |
#3170 | Waterford Holdco CSG | Waterford, MN | 4.2 GWh |
#3171 | OER Patuxent CSG | Lothian, MD | 4.2 GWh |
#3172 | Ridge Farm | Ridge Farm, IL | 4.2 GWh |
#3173 | Ajax Solar, LLC (MA) | West Bridgewater, MA | 4.2 GWh |
#3174 | Dow Jones South Brunswick Solar | Monmouth Junction, NJ | 4.2 GWh |
#3175 | Ma | Lancaster, CA | 4.2 GWh |
#3176 | CED Hilltop Solar | Rockford, IL | 4.2 GWh |
#3177 | Estrella Mountain PV | Avondale, AZ | 4.2 GWh |
#3179 | Chambers 4 - Sacramento SMF1 | Sacramento, CA | 4.2 GWh |
#3180 | Wolfcastle | Dekalb, IL | 4.2 GWh |
#3181 | Kearsarge Haverhill | Haverhill, MA | 3.8 GWh |
#3182 | Ware Avra II | Waycross, GA | 4.2 GWh |
#3183 | Marietta | Marietta, OK | 4.2 GWh |
#3184 | Marathon Solar Farm II LLC North | Canastota, NY | 4.2 GWh |
#3185 | OE IL Solar 3 | Oregon, IL | 4.1 GWh |
#3186 | Augusta Solar | Greenwood, SC | 4.1 GWh |
#3187 | Whitt Solar | Piedmont, SC | 4.1 GWh |
#3188 | Titusville Solar | Titusville, NJ | 4.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Clyde Solar Array.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bowling Green Generating Station | Bowling Green, OH | 2.1 GWh | 34.5 mi |
Bowling Green Peaking | Bowling Green, OH | 1.5 GWh | 34.3 mi |
Clyde Peaking Engine | Clyde, OH | 540.0 MWh | 2.1 mi |
Davis Besse | Oak Harbor, OH | 7.3 TWh | 19.9 mi |
DG AMP Solar Bowling Green | Bowling Green, OH | 39.4 GWh | 31.4 mi |
Energy Developments, Hancock | Findlay, OH | 21.4 GWh | 28.2 mi |
Fremont Energy Center | Fremont, OH | 4.2 TWh | 10 mi |
Genoa Diesel Generating Station | Genoa, OH | 130.0 MWh | 23.5 mi |
IGS PCW1 | Rossford, OH | 906.0 MWh | 34.6 mi |
Monroeville RTO BTM | Monroeville, OH | 83.0 MWh | 15.2 mi |
Monroeville Solar | Monroeville, OH | 4.0 GWh | 15.4 mi |
Oregon Clean Energy Center | Oregon, OH | 6.3 TWh | 33.8 mi |
POET Biorefining - Fostoria | Fostoria, OH | 21.5 GWh | 22.8 mi |
Renewable Energy Services of Ohio | Milan, OH | 11.1 GWh | 19.9 mi |
Shelby North | Shelby, OH | 23.0 MWh | 33.7 mi |
Shelby Solar Array | Shelby, OH | 1.8 GWh | 33.5 mi |
Shelby South | Shelby, OH | 37.0 MWh | 33.2 mi |
Toledo Ref Power Recovery Train | Oregon, OH | 572.3 MWh | 34.5 mi |
Troy Energy LLC | Luckey, OH | 821.7 GWh | 27 mi |
Woodville RTO BTM | Woodville, OH | 75.0 MWh | 22.1 mi |