286 Sand Road, Morrisonville, NY 12962Plant Summary Information
Clinton LFGTE Facility is ranked #35 out of 299 landfill gas power plants nationwide in terms of total annual net electricity generation.
Clinton LFGTE Facility is comprised of 4 generators and generated 12.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Clinton LFGTE Facility |
---|---|
Utility Name | Innovative Energy Systems Inc |
Location | Clinton County, NY |
Initial Operation Date | October 2008 |
Last Update | Dec 2023 |
Annual Generation | 47.3 GWh |
Annual Consumption | 566.0 k MMBtu |
Ranked #3,926 out of 11,835 Power Plants Nationwide | |
Ranked #35 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #134 out of 832 New York Power Plants | |
Ranked #5 out of 16 New York Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Clinton LFGTE Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Clinton LFGTE Facility.
Monthly Net Generation for Clinton LFGTE Facility
Clinton LFGTE Facility Details
Summary Information | |
---|---|
Plant Name | Clinton LFGTE Facility (56986) |
Plant Address | 286 Sand Road, Morrisonville, NY 12962 |
Utility | Innovative Energy Systems Inc (50158) |
Latitude, Longitude | 44.6917, -73.5944 |
Generation Dates on File | Jan 2009 to Dec 2023 |
Initial Operation Date | October 2008 |
Annual Generation | 47.3 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 09-35-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | New York State Elec & Gas Corp (13511) NY |
Grid Voltage | 46.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating October 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2008 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating October 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2008 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN3 Details Operating October 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2008 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN4 Details Operating August 2009
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2009 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Clinton LFGTE Facility Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Casella Waste Systems | 25 Greens Hill Ln, Rutland, VT 5701 | Generator GEN1 | 100.00% |
Casella Waste Systems | 25 Greens Hill Ln, Rutland, VT 5701 | Generator GEN2 | 100.00% |
Casella Waste Systems | 25 Greens Hill Ln, Rutland, VT 5701 | Generator GEN3 | 100.00% |
Casella Waste Systems | 25 Greens Hill Ln, Rutland, VT 5701 | Generator GEN4 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#25 | Wake County LFG Facility | Apex, NC | 57.9 GWh |
#26 | Mill Seat Renewable Energy Facility | Bergen, NY | 52.9 GWh |
#27 | Coventry Clean Energy Corporation | Coventry, VT | 51.9 GWh |
#28 | Grand Blanc Generating Station | Grand Blanc, MI | 51.4 GWh |
#29 | King & Queen | Little Plymouth, VA | 53.8 GWh |
#30 | Charles City | Providence Forge, VA | 54.0 GWh |
#31 | Waste Management Middle Peninsula LFGTE | Glenns, VA | 50.0 GWh |
#32 | Elk City Station | Bennington, NE | 48.7 GWh |
#33 | Dart Container Corp | Leola, PA | 47.9 GWh |
#34 | Calabasas Gas to Energy Facility | Agoura, CA | 47.4 GWh |
#36 | Superior Landfill Gas Recovery | Savannah, GA | 46.9 GWh |
#37 | Blue Ridge Landfill | Chambersburg, PA | 45.9 GWh |
#38 | Cumberland County PA LFG Recovery | Shippensburg, PA | 45.8 GWh |
#39 | Zimmerman Energy | Argos, IN | 45.7 GWh |
#40 | Waste Management Rolling Meadows LFGTE | Topeka, KS | 45.4 GWh |
#41 | Turnkey Landfill Gas Recovery | Rochester, NH | 44.8 GWh |
#42 | Green Knight Energy Center | Pen Argyl, PA | 44.0 GWh |
#43 | Metro Gas Recovery | Franklin, WI | 43.9 GWh |
#44 | Brent Run Generating Station | Montrose, MI | 43.4 GWh |
#45 | MM Prince William Energy | Manassas, VA | 43.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Clinton LFGTE Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adirondack Solar | Ellenburg Center, NY | 1.6 GWh | 18.5 mi |
Alice Falls Hydro Project | Keeseville, NY | 5.0 GWh | 13.5 mi |
Altona | Altona, NY | 120.2 GWh | 9.4 mi |
Boas Rd #1 Community Solar Farm | Mooers, NY | 3.0 GWh | 17.2 mi |
Boas Rd #2 Community Solar Farm | Mooers, NY | 3.0 GWh | 17.1 mi |
Boas Rd #3 Community Solar Farm | Mooers, NY | 2.7 GWh | 17.1 mi |
Boas Rd #4 Community Solar Farm | Mooers, NY | 2.6 GWh | 16.8 mi |
Burlington GT | Burlington, VT | 472.0 MWh | 23.3 mi |
Cadyville | Town ofSchuyler Falls, NY | 26.3 GWh | 1.4 mi |
Clark Falls | Milton, VT | 19.8 GWh | 23.6 mi |
County Route 11 Community Solar Farm | Mooers, NY | 5.9 GWh | 17.3 mi |
High Falls - Saranac NY | Town of Saranac, NY | 88.5 GWh | 8.4 mi |
J C McNeil | Burlington, VT | 155.5 GWh | 23.5 mi |
Lower Saranac Hydroelectric Facility | Plattsburgh, NY | 32.7 GWh | 4.5 mi |
Mill C | Town of Plattsburgh, NY | 29.1 GWh | 0.9 mi |
Peterson | Milton, VT | 36.3 GWh | 21.5 mi |
Rainbow Falls Auscble | Town of Auscble, NY | 9.8 GWh | 13.3 mi |
Route 22 Community Solar Farm CSG | Plattsburgh, NY | 5.9 GWh | 6.7 mi |
Saranac Facility | Plattsburgh, NY | 234.4 GWh | 7 mi |
Union Falls | Au Sable Forks, NY | 9.8 GWh | 20.1 mi |