Clifty Creek
1335 Clifty Hollow Road, Madison, IN 47250Plant Summary Information
Clifty Creek is ranked #17 out of 129 coal plants nationwide in terms of total annual net electricity generation.
Clifty Creek is comprised of 6 generators and generated 1.2 TWh during the 3-month period between June 2024 to September 2024.
Plant Name | Clifty Creek |
---|---|
Utility Name | Indiana-Kentucky Electric Corp |
Location | Jefferson County, IN |
Initial Operation Date | February 1955 |
Last Update | Sep 2024 |
Annual Generation | 5.1 TWh |
Annual Consumption | 57.5 M MMBtu |
Ranked #210 out of 11,852 Power Plants Nationwide | |
Ranked #17 out of 129 Bituminous Coal Power Plants Nationwide | |
Ranked #5 out of 198 Indiana Power Plants | |
Ranked #2 out of 14 Indiana Bituminous Coal Power Plants | |
Fuel Types | Bituminous Coal : 91.2% Subbituminous Coal : 8.7% |
Map of Clifty Creek
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Clifty Creek.
Monthly Net Generation for Clifty Creek
Clifty Creek Details
Summary Information | |
---|---|
Plant Name | Clifty Creek (983) |
Plant Address | 1335 Clifty Hollow Road, Madison, IN 47250 |
Utility | Indiana-Kentucky Electric Corp (9269) |
Latitude, Longitude | 38.7378, -85.4206 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | February 1955 |
Annual Generation | 5.1 TWh |
Fuel Types | Bituminous Coal : 91.2% Subbituminous Coal : 8.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Ohio River |
Ash Impoundment | Yes Not Lined Operating |
Transmission / Distribution Owner | Indiana-Kentucky Electric Corp (9269) |
Grid Voltage | 345.00 kV / 138.00 kV |
Energy Storage | No |
Generator 4 Details Operating October 1955
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 217.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 195.5 MW |
Winter Capacity | 199.7 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1955 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Bituminous Coal / Subbituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 5 Details Operating November 1955
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 217.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 195.5 MW |
Winter Capacity | 199.7 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1955 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Bituminous Coal / Subbituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 1 Details Operating February 1955
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 217.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 195.5 MW |
Winter Capacity | 199.7 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 1955 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Bituminous Coal / Subbituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating May 1955
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 217.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 195.5 MW |
Winter Capacity | 199.7 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1955 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Bituminous Coal / Subbituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating July 1955
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 217.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 195.5 MW |
Winter Capacity | 199.7 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1955 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Bituminous Coal / Subbituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 6 Details Operating March 1956
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 217.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 195.5 MW |
Winter Capacity | 199.7 MW |
Minimum Load | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 1956 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Bituminous Coal / Subbituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Clifty Creek Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Bituminous Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#7 | Cumberland (TN) | Cumberland City, TN | 9.4 TWh |
#8 | John E Amos | St Albans, WV | 9.1 TWh |
#9 | Cross | Cross, SC | 8.5 TWh |
#10 | Four Corners | Fruitland, NM | 8.0 TWh |
#11 | H L Spurlock | Maysville, KY | 7.8 TWh |
#12 | Mill Creek (KY) | Louisville, KY | 7.2 TWh |
#13 | Trimble County | Bedford, KY | 8.9 TWh |
#14 | Roxboro | Semora, NC | 5.9 TWh |
#15 | Mountaineer | New Haven, WV | 5.6 TWh |
#16 | Miami Fort | North Bend, OH | 5.1 TWh |
#18 | Cayuga | Cayuga, IN | 4.5 TWh |
#19 | Longview Power Plant | Maidsville, WV | 4.4 TWh |
#20 | Kyger Creek | Cheshire, OH | 4.7 TWh |
#21 | FirstEnergy Fort Martin Power Station | Maidsville, WV | 4.3 TWh |
#22 | Crystal River | Crystal River, FL | 16.3 TWh |
#23 | Intermountain Power Project | Delta, UT | 4.4 TWh |
#24 | Marshall (NC) | Terrell, NC | 7.3 TWh |
#25 | Warrick | Newburgh, IN | 3.6 TWh |
#26 | Mt Storm | Mount Storm, WV | 3.6 TWh |
#27 | Hunter | Castle Dale, UT | 3.5 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Clifty Creek.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aero Solar Facility | Burlington, KY | 2.6 GWh | 45.7 mi |
Bavarian LFGTE | Walton, KY | 27.9 GWh | 42.1 mi |
Bluegrass Generating Station | LaGrange, KY | 36.5 GWh | 24 mi |
Crittenden Solar Facility | Dry Ridge, KY | 4.5 GWh | 43.5 mi |
Decatur Co. Solar RES (IN) | Greensburg, IN | 1.7 GWh | 41.7 mi |
East Bend | Union, KY | 2.4 TWh | 32.7 mi |
Ghent | Ghent, KY | 10.0 TWh | 20.8 mi |
Henryville Solar RES | Underwood, IN | 1.7 GWh | 21.6 mi |
Jackson Co. Solar RES | Columbus, IN | 1.6 GWh | 34.4 mi |
Lanesville Solar RES | Lanesville, IN | 1.6 GWh | 44.4 mi |
Lawrenceburg Power, LLC | Lawrenceburg, IN | 8.7 TWh | 38.5 mi |
LGE-KU Solar Share Facility Simpsonville | Simpsonville, KY | 1.0 MWh | 36.1 mi |
Markland | Florence, IN | 394.7 GWh | 24.8 mi |
Miami Fort | North Bend, OH | 5.1 TWh | 42.1 mi |
Ohio Falls | Shippingport Island, KY | 272.0 GWh | 36.9 mi |
Paddys Run | Louisville, KY | 83.0 GWh | 42.2 mi |
Scottsburg Solar Park | Scottsburg, IN | 12.3 GWh | 20.4 mi |
Trimble County | Bedford, KY | 8.9 TWh | 10.6 mi |
Walton 1 Solar Facility | Walton, KY | 2.9 GWh | 45.3 mi |
Walton 2 Solar Facility | Walton, KY | 3.1 GWh | 45.3 mi |