Clif Bar Bakery of Twin Falls
3438 Eldridge Ave, Twin Falls, ID 83301Plant Summary Information
Clif Bar Bakery of Twin Falls is ranked #12 out of 12 solar farms in Idaho in terms of total annual net electricity generation.
Clif Bar Bakery of Twin Falls generated 500.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Clif Bar Bakery of Twin Falls |
---|---|
Utility Name | Clif Bar Bakery of Twin Falls, LLC |
Location | Twin Falls County, ID |
Initial Operation Date | June 2019 |
Last Update | Dec 2023 |
Annual Generation | 2.8 GWh |
Annual Consumption | 9.8 k MMBtu |
Ranked #9,155 out of 11,835 Power Plants Nationwide | |
Ranked #3,997 out of 5,643 Solar Power Plants Nationwide | |
Ranked #138 out of 141 Idaho Power Plants | |
Ranked #12 out of 12 Idaho Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Borrego Solar Systems Inc (2018 to 2019) Clif Bar Bakery of Twin Falls, LLC (2020 to 2023) |
Map of Clif Bar Bakery of Twin Falls
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Clif Bar Bakery of Twin Falls.
Monthly Net Generation for Clif Bar Bakery of Twin Falls
Clif Bar Bakery of Twin Falls Details
Summary Information | |
---|---|
Plant Name | Clif Bar Bakery of Twin Falls (62151) |
Plant Address | 3438 Eldridge Ave, Twin Falls, ID 83301 |
Utility | Clif Bar Bakery of Twin Falls, LLC (61695) |
Latitude, Longitude | 42.54097, -114.41252 |
Generation Dates on File | Jun 2019 to Dec 2023 |
Initial Operation Date | June 2019 |
Annual Generation | 2.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Idaho Power Company (IPCO) |
NAICS Code | Food Manufacturing (311) |
Sector | Industrial Non-CHP (6) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Idaho Power Co (9191) ID |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator PV1 Details Operating June 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2019 |
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Clif Bar Bakery of Twin Falls Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3987 | Greenville CSG | Port Jervis, NY | 2.8 GWh |
#3988 | Lawrence Brook | Morristown, VT | 2.8 GWh |
#3989 | Upper Marlboro 1 CSG | Upper Marlboro, MD | 2.8 GWh |
#3990 | Weston Landfill Solar | Weston, MA | 2.8 GWh |
#3991 | San Diego - NCRC at Vista | Vista, CA | 2.8 GWh |
#3992 | White Plains_RFP-Gedney Way Landfill | White Plains, NY | 2.8 GWh |
#3993 | Columbia Bryson | Grovetown, GA | 2.8 GWh |
#3994 | Panda Solar NC 7, LLC | Faison, NC | 2.8 GWh |
#3995 | Wakefern Food Corp | Keasbey, NJ | 2.8 GWh |
#3996 | Gifford CSG | Schenectady, NY | 2.8 GWh |
#3998 | Washington St Community Solar Farm #3 | Ogden, NY | 2.8 GWh |
#3999 | Citizens Agawam Landfill Solar | Agawam, MA | 2.8 GWh |
#4000 | Temple Solar Arrays | Reading, PA | 2.8 GWh |
#4001 | Source Power Company - Richland | Richland, NY | 2.8 GWh |
#4002 | Kingsburg Solar | Kingsburg, CA | 2.8 GWh |
#4003 | Spencer Solar MA | Spencer, MA | 2.8 GWh |
#4004 | Ayers Village Solar | Methuen, MA | 2.8 GWh |
#4005 | Charlotte Solar LLC VT | Charlotte, VT | 2.8 GWh |
#4006 | Houghton | Houghton, NY | 2.8 GWh |
#4007 | Easthampton Landfill-City of Easthampton | Easthampton, MA | 2.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Clif Bar Bakery of Twin Falls.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amalgamated Sugar Twin Falls | Twin Falls, ID | 36.5 GWh | 1.2 mi |
Bypass | Hazelton, ID | 29.6 GWh | 18.1 mi |
Clear Lake | Buhl, ID | 8.4 GWh | 20.6 mi |
Crystal Springs | Filer, ID | 8.9 GWh | 7.2 mi |
Hazelton B Hydro | Hazelton, ID | 24.8 GWh | 16.9 mi |
Head of U Canal Hydro Project | Jerome, ID | 4.9 GWh | 15.4 mi |
Little Mac Project | Buhl, ID | 4.5 GWh | 14.1 mi |
Low Line Rapids | Kimberly, ID | 8.9 GWh | 4.7 mi |
Marco Ranch | Jerome, ID | 2.6 GWh | 9.9 mi |
Mile 28 Water Power Project | Eden, ID | 4.3 GWh | 18.8 mi |
Milner Butte LFGE | Burley, ID | 18.4 GWh | 21.4 mi |
Milner Dam Wind Park LLC | Burley, ID | 46.6 GWh | 20.9 mi |
Milner Hydro | Murtaugh, ID | 29.0 GWh | 19.1 mi |
Rock Creek I | Twin Falls, ID | 9.6 GWh | 9 mi |
Rock Creek II | Twin Falls, ID | 5.8 GWh | 8.2 mi |
S E Hazelton A | Hazelton, ID | 25.9 GWh | 17.8 mi |
Shoshone Falls | Twin Falls, ID | 42.3 GWh | 3.9 mi |
South Forks Hydro | Hansen, ID | 29.8 GWh | 6.1 mi |
Twin Falls (ID) | Kimberly, ID | 37.1 GWh | 4.4 mi |
Wilson Lake Hydroelectric Project | Eden, ID | 29.2 GWh | 13.5 mi |