Cleveland Works is ranked #6 out of 8 blast furnace gas power plants nationwide in terms of total annual net electricity generation.
Cleveland Works is comprised of 3 generators and generated 71.3 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Cleveland Works |
---|---|
Utility Name | Cleveland Cliffs |
Location | Cuyahoga County, OH |
Initial Operation Date | January 1950 |
Last Update | Sep 2024 |
Annual Generation | 232.6 GWh |
Annual Consumption | 6.0 M MMBtu |
Ranked #2,142 out of 11,852 Power Plants Nationwide | |
Ranked #6 out of 8 Blast Furnace Gas Power Plants Nationwide | |
Ranked #45 out of 183 Ohio Power Plants | |
Ranked #1 out of 1 Ohio Blast Furnace Gas Power Plants | |
Fuel Types | Blast Furnace Gas : 66.5% Natural Gas : 33.5% |
Previous Operator |
ArcelorMittal Cleveland Inc (2013 to 2022) Cleveland Cliffs (2023 to 2023) |
Map of Cleveland Works
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cleveland Works.
Monthly Net Generation for Cleveland Works
Cleveland Works Details
Summary Information | |
---|---|
Plant Name | Cleveland Works (10398) |
Plant Address | 3060 Eggers Road, Cleveland, OH 44105 |
Utility | Cleveland Cliffs (9454) |
Latitude, Longitude | 41.4739, -81.6728 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | January 1950 |
Annual Generation | 232.6 GWh |
Fuel Types | Blast Furnace Gas : 66.5% Natural Gas : 33.5% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Iron and Steel Mills and Ferroalloy Manufacturing (3311) |
Sector | Industrial CHP (7) |
Water Source | Cuyahoga River |
Ash Impoundment | No |
Transmission / Distribution Owner | Cleveland Electric Illum Co (3755) OH |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | EAST OHIO GAS COMP DOMINION EAST OH |
Natural Gas Storage | No |
Generator GENB Details Operating January 1965
Technology | Other Gases |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ATSI |
Nameplate Capacity | 10 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 8 MW |
Winter Capacity | 9 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1965 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Blast Furnace Gas / Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | BFG / NG |
---|---|
Other Limits | Yes |
Generator GENC Details Operating February 2010
Technology | Other Gases |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ATSI |
Nameplate Capacity | 22 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 22 MW |
Winter Capacity | 22 MW |
Minimum Load | 4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2010 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Blast Furnace Gas / Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Pulverized Coal Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | BFG / NG |
---|---|
Air Permit Limits | Yes |
Other Limits | Yes |
Generator GENG Details Operating March 2022
Technology | Other Gases |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | ATSI |
Nameplate Capacity | 70 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 69.3 MW |
Winter Capacity | 60 MW |
Minimum Load | 14 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2022 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Blast Furnace Gas |
Startup Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Cleveland Works Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Blast Furnace Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Dearborn Industrial Generation | Dearborn, MI | 5.7 TWh |
#2 | Indiana Harbor E 5 AC Station | East Chicago, IN | 663.0 GWh |
#3 | Gary Works | Gary, IN | 1.1 TWh |
#4 | Mon Valley Works | Dravosburg, PA | 473.7 GWh |
#5 | ArcelorMittal Burns Harbor | Burns Harbor, IN | 820.3 GWh |
#7 | Expander Turbine | East Chicago, IN | 67.6 GWh |
#8 | Borger Plant | Borger, TX | 45.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cleveland Works.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Akron WRF | Akron, OH | 7.9 GWh | 22.8 mi |
Cleveland Peaking | Cleveland, OH | 187.0 MWh | 7.2 mi |
Cleveland Thermal | Cleveland, OH | 1.8 GWh | 2.5 mi |
Collinwood BioEnergy Facility | Cleveland, OH | 2.1 GWh | 7.1 mi |
Cuyahoga County Landfill | Brooklyn, OH | 4.3 GWh | 4.6 mi |
Cuyahoga Falls 1 | Cuyahoga Falls, OH | 707.0 MWh | 25.1 mi |
DG AMP 1048 Wadsworth | Wadsworth, OH | 11.2 GWh | 32.2 mi |
Euclid Farm, Stamco N-54 | Euclid, OH | 607.9 MWh | 12.7 mi |
IGS AKC1 | Akron, OH | 2.3 GWh | 29.7 mi |
LE Wind Turbine 1 | Euclid, OH | 4.2 GWh | 10.8 mi |
Loraine County Project | Oberlin, OH | 101.3 GWh | 28.9 mi |
MCCo Solar Generating Facility | Cleveland, OH | 478.0 MWh | 4.9 mi |
Oberlin (OH) | Oberlin, OH | 292.0 MWh | 31.2 mi |
Oberlin Spear Point Solar One | Oberlin, OH | 2.1 GWh | 31.1 mi |
Painesville | Painesville, OH | 749.0 MWh | 27.8 mi |
Seville | Seville, OH | 153.0 MWh | 32.2 mi |
Summit Street Power Plant | Kent, OH | 31.3 GWh | 28.6 mi |
Wadsworth HBS RTO BTM | Wadsworth, OH | 383.0 MWh | 30.6 mi |
Wadsworth IPS RTO BTM | Wadsworth, OH | 373.0 MWh | 26.9 mi |
West Lorain | Lorain, OH | 1.1 TWh | 30.8 mi |