Cleveland Peaking
13611 Aspinwall Ave., Cleveland, OH 44114Plant Summary Information
Cleveland Peaking is ranked #39 out of 55 distillate fuel oil power plants in Ohio in terms of total annual net electricity generation.
Cleveland Peaking is comprised of 6 generators and generated 24.8 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Cleveland Peaking |
---|---|
Utility Name | American Mun Power-Ohio, Inc |
Location | Cuyahoga County, OH |
Initial Operation Date | July 2000 |
Last Update | Dec 2022 |
Annual Generation | 106.0 MWh |
Annual Consumption | 1.4 k MMBtu |
Ranked #10,892 out of 11,249 Power Plants Nationwide | |
Ranked #866 out of 1,267 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #156 out of 170 Ohio Power Plants | |
Ranked #39 out of 55 Ohio Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Cleveland Peaking
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cleveland Peaking.
Monthly Net Generation for Cleveland Peaking
Cleveland Peaking Details
Summary Information | |
---|---|
Plant Name | Cleveland Peaking (7774) |
Plant Address | 13611 Aspinwall Ave. Cleveland, OH 44114 |
Utility | American Mun Power-Ohio, Inc (40577) |
Latitude, Longitude | 41.55671, -81.58823 |
Generation Dates on File | Jan 2004 to Dec 2022 |
Initial Operation Date | July 2000 |
Annual Generation | 106.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Cleveland - (OH) (3762) OH |
Grid Voltage | 11.00 kV |
Energy Storage | No |
Generator 1 Details Operating July 2000
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 1.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2000 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating July 2000
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 1.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2000 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating July 2000
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 1.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2000 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4 Details Operating July 2000
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 1.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2000 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 5 Details Operating July 2000
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 1.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2000 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 6 Details Operating July 2000
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Minimum Load | 1.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2000 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cleveland Peaking Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#856 | NYU Luthern Medical Center | New York City, NY | 109.5 MWh |
#857 | Knoxville Industrial | Knoxville, IA | 109.2 MWh |
#858 | E C Gaston | Wilsonville, AL | 3.9 TWh |
#859 | French Island | La Cross, WI | 64.8 GWh |
#860 | Butler Municipal Power Plant | Butler, MO | 108.5 MWh |
#861 | Westside WWTP | Thomasville, NC | 107.7 MWh |
#862 | Graettinger | Graettinger, IA | 106.5 MWh |
#863 | Shelbina Power #2 | Shelbina, MO | 106.3 MWh |
#864 | Water Street Station | Bay City, MI | 1.3 GWh |
#865 | Mountain Home Energy Center | Mountain Home, TN | 5.7 GWh |
#867 | NCAH Central Utility Plant | Ames, IA | 13.1 GWh |
#868 | Shelby North | Shelby, OH | 105.2 MWh |
#869 | West Group Data Center | Eagan, MN | 104.0 MWh |
#870 | Carmi | Carmi, IL | 103.5 MWh |
#871 | Cornell University Central Heat | Ithaca, NY | 224.8 GWh |
#872 | Midulla Generating Station | Bowling Green, FL | 2.8 TWh |
#873 | Ephrata PA BTM | Lancaster, PA | 102.0 MWh |
#874 | Fort Greely Power Plant | Delta Jct, AK | 100.9 MWh |
#875 | Ft. Pierre | Fort Pierre, SD | 99.3 MWh |
#876 | Block Island | Block Island, RI | 99.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cleveland Peaking.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Akron WRF | Akron, OH | 8.6 GWh | 27.9 mi |
Arcelormittal Cleveland Inc | Cleveland, OH | 186.9 GWh | 7.2 mi |
Cleveland Thermal | Cleveland, OH | 1.5 GWh | 5.9 mi |
Collinwood BioEnergy Facility | Cleveland, OH | 2.9 GWh | 0.1 mi |
Cuyahoga County Landfill | Brooklyn, OH | 4.5 GWh | 11.5 mi |
Cuyahoga Falls 1 | Cuyahoga Falls, OH | 605.6 MWh | 29.3 mi |
DG AMP 1048 Wadsworth | Wadsworth, OH | 11.2 GWh | 38.7 mi |
DG AMP Rittman Rd | Wadsworth, OH | 3.5 GWh | 39.3 mi |
Euclid Farm, Stamco N-54 | Euclid, OH | 598.0 MWh | 5.7 mi |
Geneva | Geneva, OH | 21.0 GWh | 38.7 mi |
LE Wind Turbine 1 | Euclid, OH | 5.5 GWh | 3.8 mi |
Loraine County Project | Oberlin, OH | 111.6 GWh | 35.4 mi |
MCCo Solar Generating Facility | Cleveland, OH | 448.0 MWh | 2.8 mi |
Oberlin (OH) | Oberlin, OH | 346.0 MWh | 37.8 mi |
Painesville | Painesville, OH | 44.0 MWh | 20.9 mi |
Perry | Perry, OH | 10.2 TWh | 28.5 mi |
Seville | Seville, OH | 222.7 MWh | 39.1 mi |
Summit Street Power Plant | Kent, OH | 32.4 GWh | 31.3 mi |
Wadsworth HBS RTO BTM | Wadsworth, OH | 280.0 MWh | 37 mi |
West Lorain | Lorain, OH | 621.4 GWh | 36.1 mi |